.SECTION 1: REFORCEMENT 第一章:钢筋 PART 1GENERAL第一节 总则1.1SCOPE OF WORK 工作范围Materials and labours required for the complete installation of the work of this section, including furnishing and placing of reinforcing steel and related positioning.完成安装本部分工程所需的材料和劳动力,包括提供和设置钢筋和有关的定位。1.2STANDARDS 标准Except as otherwise specified herein, perform work in accordance with specifications, codes, and standards cited therein, and latest applicable addenda and supplements. Copies of these items shall be kept available in shop and field.除非另有规定,按照以下引用的规范,标准和最新的附录和补充施工。在车间和现场应备有这些文件的复印件。BS 4449Hot rolled steel bars for the reinforcement of concrete. 用于混凝土的热轧钢筋BS 8110The Structural Use of Concrete - Part 1 Design and Construction. 混凝土的结构用途-第一节 设计和施工BS 4483Steel fabric for the reinforcement of concrete. 混凝土加筋钢丝BS 4466 Bending dimensions and scheduling of bars for the reinforcement of concrete. 混凝土钢筋弯曲尺寸和加工表UK Structural Design Standards specified herein can be substituted by other Structural Design Standards: Selected National and International Title and Sources, provided that request for substitution is made and reviewed by Engineers Representative before use in project.如果在使用前提出申请替换,并经监理代表批准,可以使用相应结构设计标准:挑选的国家和国际名称和来源,来替换这里规定的英国结构设计标准。Any material or operation specified by reference to published specifications of manufacturer or published standard shall comply with said specification or standard. In case of conflict between referenced specifications, most stringent requirement shall govern; and in case of dispute, the Engineers decision shall be final. In case of conflict between referenced specifications and Project Specifications, Project Specifications shall govern.任何通过参考出版的制造商规范或标准规定的材料或实施应符合上述规范或标准。当参考规范存在分歧时,应使用最严格的要求;如果有分歧,监理的决定将是最终的。如果参考的标准和项目规范 发生分歧,应以项目规范为准。1.3SUBMITTALS & TESTING 提交和试验The Contractor shall submit manufacturers specifications and installation instructions for each item of proprietary material used, and shall confirm his intention to comply with such requirements.承包商应提交所用的每项专用材料的制造商规范和安装说明,并应确认承包商遵守此要求的意图。Submit to Engineers detailed Reinforcement Shop Drawings including cutting lists, bar bending schedule and erection drawings. 向监理工程师提交详细的钢筋加工图,包括切割表、钢筋弯曲表和安装图。Submit to Engineers prior to delivery of reinforcing steel certified mill test reports of reinforcing steel (including names and locations of mills and shops, and analyses of chemical and physical properties), properly correlated to be used in this project. 在钢筋进场前向监理工程师提交钢筋的工厂鉴定试验报告(包括工厂和车间的名称和地址,化学和物理性能分析),该报告应与项目使用精密关联。Tests will be required by the Engineers Representative on steel reinforcement and they shall be carried out in strict accordance with the provisions of the British Standards in Clause 03900/1/1.02.监理工程师代表可以要求对钢筋进行试验,试验应按照英国标准第03900/1/1.02条的规定严格执行。Tensile tests providing information on elastic limit, ultimate strength, and stress-strain curve will be required from each delivery of reinforcement and measurements will also be required of cross-sectional area, weight per unit length, deformation and bend / re-bend characteristics of deformed bars. Chemical composition analysis shall be performed for each bar size. 要求对每次进场的钢筋进行张拉试验,提供有关弹性范围、极限强度和应力-应变曲线。同时,需要对变形钢筋的截面积、单位长度的重量、变形和弯曲/再弯曲特征进行量测。对每种钢筋尺寸应进行化学成分分析。The Contractor shall allow for the following testing procedure : 承包商应考虑以下试验程序a)15 test specimens per unit of delivery of each bar diameter to determine the following :- 对于每种尺寸的钢筋每次进场取15个试验样品,以确定以下内容-Tensile strength 抗拉强度-Yield point 屈服点-Elongation after fracture 断裂时的延长率b)15 test specimens per unit of delivery of each bar diameter to determine the following : 对于每种尺寸的钢筋每次进场取15个试验样品,以确定以下内容- Behaviour in the rebend test 反弯试验特性-Deviations from the nominal cross section 名义截面的偏差-Bond test. 粘结力试验c) 2 test specimens per unit of delivery of each bar diameter for chemical composition in accordance with the requirements of BS : 4449(E).对于每种尺寸的钢筋每次进场取2个试验样品,按照BS4449的要求进行化学成分分析。The deliveries to be sub divided into test units with a maximum mass of 100 tons each or of products of the same nominal diameter from the same cast as directed by the Engineer. 按照监理工程师的指示将进场的钢筋细分为最大质量为100吨的试验单位或者细分成同一铸件的同一直径的产品。One set of test results for each bar size shall be submitted to the Engineers Representative. Remaining tests will be carried out at the discretion of the Engineers Representative. 在混凝土工程现场开工前,向监理工程师代表提交每种钢筋尺寸的一套试验结果。Where any test results do not confirm to the values laid down in the above standards, the defective materials shall be removed from the site. 当试验结果不符合上述标准中规定的数值时,有缺陷的材料应从现场清除。Submit to Engineer, manufacturers and/or suppliers and/or installers affidavit stating that material or product provided complies with Contract Documents. 应向监理工程师提交制造商和/或供应商和/或安装商的宣誓书。该宣誓书应说明提供的材料或产品符合合同文件。PART 2 PRODUCTS 第二节 产品2.1MATERIAL 材料High yield steel reinforcing bars used for the work shall have a minimum yield stress of 460 N/mm2 (Hot Rolled) complying to BS 4449. 用于工程的高屈服钢筋根据BS4449应具有最小屈服应力460 N/mm2(热轧)。Mild steel reinforcement shall be of plain round bars with minimum yield stress of 250 N/mm2. 低炭钢筋应该是光圆钢筋,其最小屈服应力为250 N/mm2.Welded Wire Fabric shall conform to BS 4483. 焊接钢丝应符合BS 4483. Cold-worked steel bars shall not be used as lifting hooks. 吊钩钢筋不得使用冷加工钢筋材料。Couplers of reinforcement are to be of the lapping type, and used on all bars on members where shown on the drawings. 钢筋连接采用搭接式;应按照图纸所示对构件的所有钢筋使用搭接连接。 Flash weld can be used in the connection works, and shall follow BS4449. 钢筋连接可采用闪光焊,并要符合规范4449中的相关规定。2.2FABRICATION 钢筋加工2.2.1General: Fabricate reinforcing bars to conform to required shapes and dimensions, with fabrication tolerances complying with BS 4466. I 总则:按照所需形状和尺寸加工钢筋,加工公差符合BS4466。2.2.2Handling: Bending, placing, spacing and splicing of steel shall comply in all cases with the requirements of BS 4466. 处理:钢筋的弯曲、设置、间距和搭接应符合BS4466的要求。2.2.3Unacceptable Materials: Reinforcement with any of the following defects will not be permitted in the Work: 不可接受的材料: 如果钢筋有以下一种情况,它就不能用于工程。a)Bar lengths, depths, and bends exceeding specified fabrication tolerances. 钢筋长度、厚度和弯曲超过规定的加工公差。b)Bends or kinks not required by the Work. 工程不需要的弯曲或纽结c)Bars with reduced cross-section due to excessive resting or other cause. 钢筋由于过度不用或其他原因导致截面变小。PART 3 EXECUTION 第三节 实施3.1VERIFICATION OF CONDITIONS 核实条件Examine work prepared by other trades to receive work of this section and report any defects affecting installation to the Contractor for correction. Commencement of work will be construed as complete acceptance of preparatory work by others.检查其他行业准备的工作,接受本部分的工作,并将影响安装的所有缺陷向承包商汇报以便改正。工程开工可理解为完全接受他人所做的准备工作。3.2PLACING OF REINFORCEMENT 钢筋的安装The Contractor shall supply and incorporate in the work all such steel reinforcement including tie wire, support and spacer bars, all to the satisfaction of the Engineers Representative. 承包商应完全按照监理工程师代表的要求提供和在工程中采用所有的钢筋,包括连接铁丝、支撑钢筋和定位钢筋等等。The Contractor may substitute alternative bar sizes bundled as necessary than those shown on the drawings. The Contractor to provide calculations showing the substituted bar diameters meet all requirements of area, bond, of BS 8110 to the Engineers Representative for his approval. 承包商可以使用可选择性钢筋尺寸来替换图纸上显示的钢筋尺寸。承包商应向监理工程师代表提供表明代替的钢筋尺寸符合BS8110的面积和粘结要求的计算书供其批准。Reinforcement shall be continuous through construction joints unless otherwise indicated on drawings. 除非图纸上另有规定,钢筋穿过施工缝处应是连续的. Splices shall be set up in such location where the stress is low and the number of splices shall not more than two in one longitudinal reinforcement. 钢筋的接头宜设在受力较弱处,同一纵向受力钢筋不宜设置两个或两个以上接头。 Splices of adjacent bars shall be staggered with each other in the same structural members, and shall satisfy with the least ratio of lapping ,同一构件中相邻纵向受力钢筋的接头宜相互错开,且要满足接头百分率要求。The splice lengths of all reinforcing bars which have to be spliced shall, unless otherwise shown on the drawings, be in conformity with the following: 除非图纸上另有规定,所有钢筋的搭接长度应符合以下:Plain round bars光圆钢筋60 x Bar Dia Minimum 最小60倍钢筋直径Deformed bars变形钢筋50 x Bar Dia Minimum最小50倍钢筋直径Fabric钢丝(300 mm minimum, but overlap measured between outermost wires of each sheet no less than pitch of secondary). 最小300毫米,)Spliced bars are to be securely tied together. 搭接钢筋应牢固地连接在一起。Splices to be staggered to the approval of the Engineers Representative, and the fabric is to be securely tied layer to layer. 钢筋搭接错开应得到监理工程师代表的批准。钢丝应分层牢固地连接在一起。All steel, before being placed in position, shall be thoroughly cleaned of loose rust, scale and any other coating that will destroy or reduce bond. 在安装到位所有钢筋之前,应彻底清除毁坏或降低黏结的松散的锈蚀、水垢和其他涂层。All reinforcement shall be placed accurately in a position and securely fastened in place to prevent displacement during the placing of the concrete. 所有钢筋应正确安装到位,并牢固地固定以防止在浇筑混凝土过程中移动。Before concrete is cast, check all reinforcement after it is placed to ensure that reinforcement conforms to Contract Documents and approved shop drawings. 在浇筑混凝土之前,检查所有安装的钢筋,确保钢筋符合合同文件和批准的加工图。Unless shown on the drawings concrete cover to all reinforcement shall be a minimum as foll
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 ISO/IEC TR 16088:2025 EN Information technology - Computer graphics,image processing and environmental representation - Constructs for visual positioning systems in mixed a
- 【正版授权】 ISO/IEC 23001-17:2024/Amd 1:2025 EN Information technology - MPEG systems technologies - Part 17: Carriage of uncompressed video and images in ISO base media file format - A
- 【正版授权】 ISO 29461-4:2025 EN Air intake filter systems for rotary machinery - Part 4: Test methods for static filter systems in coastal and offshore environments
- 【正版授权】 ISO 8168:2025 EN Aerospace - Bolts,with MJ threads,made of heat and corrosion resisting steel,strength class 1 100 MPa - Procurement specification
- 【正版授权】 ISO 5059-1:2025 EN Geometrical product specifications (GPS) - Dimensional measuring equipment - Part 1: Design and metrological characteristics of two-point inside micromete
- 【正版授权】 ISO 12234-1:2025 EN Digital imaging - Image storage - Part 1: Reference model
- 【正版授权】 IEC 61035-2-2:1993 EN-D Specification for conduit fittings for electrical installations - Part 2: Particular specifications - Section 2: Conduit fittings of insulating mater
- 北方大棚种植知识培训课件
- 出纳实训考试试题及答案
- 北京高尔夫入门知识培训课件
- 肿瘤科五年发展规划
- 文化传播公司创业计划书范本
- 2025装修半包工合同样本
- DB42T 1585-2020 规模化牛场生物安全技术规范
- 学校“十五五”五年发展规划(2026-2030年):深植教育沃土培厚发展根基
- 2025年物业能力评级考试题库
- 2025年行政执法证考试必考题库(含答案)
- 盆底相关知识课件
- 重庆巴川量子中学2024-2025学年数学八年级第一学期期末综合测试试题含解析
- 2025年行政执法考试题库及答案大全
- 基本药物知识课件
评论
0/150
提交评论