设计公司英文合同.doc_第1页
设计公司英文合同.doc_第2页
设计公司英文合同.doc_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

ContractParty A:Party B: According to the Contract Law of Peoples Republic of China as well as other relevant laws and regulations, through friendly negotiation, Party A and Party B entrusted to undertake design, and reached the following agreement:1. CommitmentParty A entrusted Party B _.Draft design period _ working days2. Design FeeTotal design fee: RMB3. Payment:a. Party A should pay 60% of total designing fee once signing the contract, i.e RMB.b. After confirming the designing schedule and style, and when in need of adjusting on electric designs, Party A should pay 30% of total design fee, i.e RMBc. After fixing the complete designing schedule, Party A should pay the balance of the design fee, i.e RMB, Party B should hand over the printing CD after receiving the balance of payment.4. Period and means of delivery of the design plan.a. Party B must complete the draft of design within the time agreed by the two parties. If party B can not complete on time due to reduplicative changes from Party A, the delivery time can be put off. To ensure the smooth cooperation, Party A must confirm or make suggestion within three working days after receipt of the design from Party B, Party B should not exceed five working days to feedback the suggestion.b. Party A should supply the necessary designing information within 20 working days after signing of the contract. As Party A (not supply complete information and so on) make the design delayed, if delayed time more than three months (subject to the date of contract), Party A should pay the balance design fee, Party B will carry on making the design. If more than six months, this contract will automatically be terminated. Party B will supply the original CD. If Party A still need Party B to make the design, Party A should pay anther palette and design fee.c. After the final confirmation of the design, Party B should supply the colored prints and electronic documents.d. Party A should bear the actual cost if needs the printing sample.5. Intellectual Property.a. Before Party A pay off all the design fee, Party B own the copyright, Party A can not use this design, and have no any right of this works.b. Party A have the right to sign the Copyright Transfer Contract, to have the proprietary rights, rights of use and alterations after paying off the payment. Copyright of design not used by Party A still belongs to Party B, Party A do not have any right for this.c. After the final confirmation by Party A, if as the changes of Party As company name or commodity name to change the design plan or have all different idea with the original plan, it should be as new plan, and Party A should pay the balance fee, and sign new contract, Party B will make new design plan.d. After paying off, Party B can not alter the design and give any other company.6. Responsibility and authoritya. Responsibility of Party A(1) Party A should try their best to supply the information for this design.(2) Once finding the mistake, oversight or disagreement with the contract, Party A should inform Party B in writing timely, and Party B should make amendment in time.(3) Party A should abide by the payment terms in the contract.(4) Party A should make the confirmation for all the documents and things that need confirmed timely. (5) Party A have the right to give a suggestion for Party Bs design and make the works accords with the enterprise culture. b. Responsibility of Party B(1) Party B must make the plan and creative design according to the requirement in the contract made by Party A, and make full use of specialized knowledge and experience, to supply first design and service to Party A.(2) Party B should supply all the design documents, making sizes and designs of every period according to the all requirement of the contract and appendix, and complete the design.(3) Party B should make the design according to the things that confirmed by Party A critically.(4) Party B should make the design creation as the requirement of Party A and supply the satisfied works.7. Breach of Dutya. Party A to terminate the contract before draft design completed, Party B will not return the deposit. Party A to terminate the contract after the final design, they should pay all the fees.b. Party B to terminate the contract without cause, to return all the fees to Party A. 8. The two copies of the both signed

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论