污水回用项目质量控制措施污水回用项目质量控制措施 Project quality control measures of sewage recycling 项目质量策划项目质量策划 Project quality planning 根据项目工艺特点 项目部有针对性编写了项目质量计划 制定了高标准的 质量目标 同时按照 ISO9001 标准建立了以项目经理为首的从施工到服务等一 系列完整的质量保证体系 According to the technical characteristics of the project the project department has prepared the pertinent project quality plan set a high standard of quality objectives and in accordance with the ISO9001 standard established by the project manager led from construction to service and a complete set of quality assurance system 针对项目的工程特点 采取的施工质量控制措施如下针对项目的工程特点 采取的施工质量控制措施如下 AccordingAccording toto thethe engineeringengineering characteristics characteristics constructionconstruction qualityquality controlcontrol measuresmeasures asas followsfollows 1 通过建立健全质量管理体系 从组织机构上对施工质量给予保证 Through the establishment of a sound quality management system to ensure the construction quality from the organization 项目经理 崔佳川 施工经理 徐顺利总工程师 杨林江 HSE 部 高学武 工程部 韩长华 物资部 栗树民 经营部 张秉文 技术部 靳华锋 质量部 刘青山 各工程队 分包商 HSE 经理 杨胜 举 2 严格质量控制点检查 加强 A B C 三级质量控制点的管理 Strict examination of the quality control point to strengthen the A B C three level quality control point management 编制施工方案编制施工方案 7 7 本 审批通过本 审批通过 7 7 本本 Application for inspection of raw materials for 7 times accepted and qualified for 7 times 现场取样现场取样 2020 次次 Site sampling for 20 times 工序报验工序报验 3232 次 次 一次报验合格率一次报验合格率 96 9 96 9 Application for inspection of working sequence for 32 times one time qualification for 96 9 对关键工序严格落实 三检制 整个工程的质量过程处在受控状态 strict implementation of the three system to the key process the whole process of engineering quality is in controlled state 3 制定各项完备的质量管理制度 如 质量奖惩制度 质量例会制 度 质量检查制度 Formulating a comprehensive quality management system such as quality rewards and punishment system quality regular meeting system quality inspection system 本月质量例会 4 次 钢筋绑扎活动检查 45 次 本月工序报验 20 次 一次报验合格率 97 9 混凝土浇筑后养护 The monthly quality meeting is held for 4 times Reinforcement binding were examined 45 times This month the process inspection for 20 times an inspection pass rate reaches 97 9 the maintaining after concrete pouring 4 强化材料管理 杜绝不合格材料流入施工现场 为此项目部特制定了 高标准的检验试验计划 Strengthening the material management to prevent the unqualified materials entering the construction site the project department has formulated the inspection and test plan for high standards 原材料报验原材料报验 1212 次 验收合格次 验收合格 1212 次次 Raw material inspection for 12 times 12 times of acceptance 检试验计划 图片 做好施工成品保护工作 维护施工成果 图片 Inspection and test plan picture To protect the work of construction products maintain construction achievements picture 5 施工过程资料的编制整理 按照中石化 SH T 3503 2007 和 SH T 3543 2007 及赛科要求进行资料管理 并要求资料与施工同步 保证资料的及 时性 准确性 完整性和规范性 Preparation of construction materials according to SH T 3503 2007 and SH T 3543 2007 and SECCO requirements for data management requiring the synchronization of data and construction ensuring timeliness accuracy integrity and standardization of assurance data 施工重难点及应对措施 池壁裂缝渗水是本项目质量控制重点 本工程 BDP 池池壁高在 5m 以上 壁厚 0 4M 0 7M 且面积较大 结构施工完毕后容 易出现竖向裂缝 应对措施 严格控制水灰比 宜掺人适当的减水剂 混凝土加料不应太快 应分层浇筑 加强混凝土早期养护 并适当延长养护时间 保持混凝土表面湿润 控制温度的激剧 升降 Major construction difficulties and Countermeasures The pool wall crack seepage is the key to the quality control of the project The height of the BDP pool wall is above 5m thickness is 0 4M 0 7M and the area is larger the structure after the construction has a tendency to produce the vertical cracks Response measures Strictly control the water cement ratio water reducing agent should be added properly Concrete feeding should not be too fast should be layered casting To strengthen the early curing of concrete and prolonging the curing time keep the concrete surface wet greatly elevating temperature control 展开展开 QCQC 小组活动小组活动 项目部成立了 BDP 池 QC 小组 在工程的各个阶段安排 QC 活动 将质量意识灌输给每 位员工 使全体员工认识到质量是企业生存的根本 定期开展技术质量难点讨论 方案策划 关键控制点共检和最终质量验收 下一步质量控制安排下一步质量控制安排 1 储罐焊接质量控制 编制详细的焊接工艺指导书 加强焊接工艺纪律 过程监督 严格执行焊材统一采购 烘烤 发放及回收 从焊工的入场考试到现场的焊接作业 建立焊工个人档案进行全方位动态 管理 Launching the QC group activity The establishment of the project department BDP pool QC group QC activity is organized in each stage of the construction Instilling the quality consciousness into each employee so that all employees recognize that the quality is the survival fundamental of establishment Regularly carrying out technical quality difficult discussions planning key control points were seized and final quality acceptance The next step for quality control 1 the welding quality control of storage tank the preparation of detailed welding process instruction strengthen weld
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 南京市2025江苏南京市城建中等专业学校南京市城建职业培训中心南京市建筑职工笔试历年参考题库附带答案详解
- 东莞市2025广东东莞市城建工程管理局招聘聘用人员10人笔试历年参考题库附带答案详解
- 2025河北新质科技有限公司招聘13人笔试参考题库附带答案详解
- 2025春季甘肃酒泉市敦煌文旅集团有限公司招聘26人笔试参考题库附带答案详解
- 2025年第2批次浙江宁波前湾产业集团有限公司招聘9人笔试参考题库附带答案详解
- 2025年合肥包河区人力资源开发有限公司招聘3人笔试参考题库附带答案详解
- 2025天津新誉资产管理有限公司所属运营类企业选聘干部人才6人笔试参考题库附带答案详解
- 2025四川长虹电源股份有限公司招聘试验技术主办岗位32人笔试参考题库附带答案详解
- 危险源安全管理培训课件
- 危险化学企业安全培训课件
- 医学装备质量管理分析报告
- Unit 3 Understanding ideas The Road to Success课件 2023-2024学年高中英语外研版选择性必修第一册
- 项目需求分析文档(模板)
- 国际机场飞机维修机库施工组织设计
- 液压泵站使用说明书
- E190飞机舱门开关
- 儿科学腹泻病
- GB/T 3871.9-2006农业拖拉机试验规程第9部分:牵引功率试验
- GB/T 3836.4-2021爆炸性环境第4部分:由本质安全型“i”保护的设备
- GB 17840-1999防弹玻璃
- 文学鉴赏-课件
评论
0/150
提交评论