




已阅读5页,还剩8页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
电气专业的英文自我评价和努力方向 电气专业仅仅由别人的评价来判定自己是不全面的,当自己也沉淀下来,窥探自己的内心,写下自己的自我评价,这样才可以不断进步。但是英文自我评价要怎么写呢?下面是为大家带来自我评价,相信对你会有帮助的。电气专业的英文自我评价和努力方向篇一 Graduated from * Technical University of Electrical Engineering and Automation, outstanding academic performance during the school, has entered the tutor electrical automation laboratory for electrical component selection and functional testing, controller design and functional debugging, programming control and electrical systems Of intelligent control; After graduation, the company entered the State Power Automation Co., Ltd., is responsible for product design and debugging, field equipment installation, commissioning and acceptance work for the hydropower station and power plants to provide monitoring equipment, proficient in the host computer and Under the machine system, various types of PLC and touch screen programming control; in the field during the service has repeatedly praised by customers, to work seriously responsible, good communication, coordination has a strong organizational skills and team spirit, lively and cheerful, optimistic progress; Motivated, diligent in learning can continue to improve their own ability and overall quality. In the future work, I will be full of energy, assiduously study the spirit to work hard and steadily improve their ability to work with the simultaneous development of enterprises;电气专业的英文自我评价和努力方向篇二 This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requirements, summarized as follows: in a years work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make their own faster progress. First, in-depth, solid work As an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies. Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication 2 station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid foundation. Other aspects of meticulous improvement and completion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding. Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the domestic production of electrical components, AC contactor with the use of materials often aging, poor access to auxiliary early, the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing. In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior resolutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyones purpose. The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical experience and personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their management level. Second, join the technical innovation, never in innovation In the work, seriously to the old comrades to learn, and constantly improve themselves, and use other time, learn more new knowledge. And actively participate in the plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actual production requirements. So that the driver in accordance with the production needs of the timely adjustment of ash to avoid excessive ash caused unnecessary losses. Third, shortcomings and shortcomings As the time to the coal preparation plant is still small, so in many aspects of technology and experience are inadequate, less problems encountered, the problem can not be handled handy. In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the experienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not understand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization. Serious study of management methods and methods to make their own production organization in the future, to better complete the leadership of the work and tasks assigned. In previous work, consider the problem is often not comprehensive, do not consider the consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make themselves more quickly mature. Fourth, self-evaluation In short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation. In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than. Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.电气专业的英文自我评价和努力方向篇三 At present, he works in the domestic and international famous steel enterprise engineering technology limited company (metallurgy grade A, civilian grade A), mainly engaged in the industry and the people electrical engineering project design work and the project manager work. Mainly for the iron and steel metallurgy, such as rolling, steel, sintering, ironmaking, chemical and civil construction projects such as electrical design work, mainly involved in the design project are: Large-scale sintering desulfurization project, domestic sewage treatment, waste acid treatment, chemical companies for power distribution system transformation, lime cellar frequency and control system transformation, a district police station and other industrial and civil project design work.Participate in the project both industrial electrical automatic control system design, and high and low voltage power supply and distribution systems, substations, transmission systems, residential, office buildings and other public construction projects electrical design. Up to now, the company has completed more than 100 projects of large and small projects with more than 10 million yuan of investment, mainly in charge of department of electrical professional, chief engineer, registered electrical engineer and project manager.电气专业的英文自我评价和努力方向篇四 Time flies, blink of an eye to the company has been a year, feeling a lot, a lot of harvest. Into the * City * Electrical Equipment Co., Ltd., for me is a good opportunity for development, is also a good exercise and enhance their ability to various aspects of the opportunity. In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the companys management system, and strive to do their jobs. Into the company, I seriously understand the companys development profile, learning the companys rules and regulations, familiar with the companys processes. At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from. Now I work over the past year summarized as follows: First, solid work I entered the workshop from the sheet metal began to do chest box shell, can be said that the sheet metal shop is my first impression of the company. Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited. Last September, I went into the assembly workshop internship, I deeply feel my colleagues work diligently, and strive to perfect the spirit. In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipment layout, wiring, do row, the second line. Into the assembly plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water. Because I know that in order to become a qualified technician is not an easy task, as a technician not only to be able to deal with the requirements of customers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of. In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, construction plans, drawings, the construction site management, acceptance and other requirements. In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to communicate and coordinate relations, in order to smooth the work of the project. The actual work, due to some local civil engineering changes and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership communication has been resolved. Therefore, in future work, I will pay attention to relevant knowledge, so that their own from the civil, decoration, budget and other aspects of strengthening, good external coordination, and actively design units, construction units and government departments to communicate, to develop a good overall planning, Where the interests of the main companies. Second, efforts to learn and progress In the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge. From the simplest manufacturing standards start to do a complete set of equipment, where both their own studious, but also inseparable from the workshop colleagues Q A FAQ. From the old engineer who I not only learned a lot, but
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 广西壮族自治区来宾市公路工程试验检测师资格考试(公共基础)综合能力测试题及答案(2025年)
- 2025年职业病诊断医师资格考试(基础理论及法律法规)练习题及答案
- 裁边拉毛工三级安全教育(班组级)考核试卷及答案
- 洗衣机制造工转正考核试卷及答案
- 纺丝凝固浴液配制工内部技能考核试卷及答案
- 2025年临淄区英语考试题及答案
- 白酒配酒工测试考核试卷及答案
- 井下采煤机司机新员工入职考核试卷及答案
- 2025年公路工程试验检测师资格考试(公共基础)综合能力测试题及答案(肇庆)
- 2025年医师资格考试(实践技能)复习题库及答案阳江
- 香雪制药资本结构优化分析
- 中国药科大学-导师及联系方式
- 2024年高考作文备考之“有用无用”作文导写素材及范文
- DZ∕T 0214-2020 矿产地质勘查规范 铜、铅、锌、银、镍、钼(正式版)
- 无创呼吸机通气模式介绍及临床应用课件
- MOOC 模拟电子电路实验-东南大学 中国大学慕课答案
- (正式版)SHT 3158-2024 石油化工管壳式余热锅炉
- 多格列艾汀使用指南2024课件
- 居民电费户名更改委托书
- 道路车辆 局域互联网络(LIN) 第3部分:协议规范
- 客户反馈管理方案处理客户反馈的有效举措
评论
0/150
提交评论