免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除Turkey EREN (1+1)x600MW supercritical coal fired power plantQuality Inspection and Acceptance Record Project Name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(the verticality checking of middle columns)Page 5 of 5CMECNEPCNEPCNEPCTurkey EREN (1+1)x600MW supercritical coal fired power plantQuality Inspection and Acceptance Record Project Name#1锅炉中部钢架安装记录。#1 boiler steel structure installation( diagonal checking of middle column elevation 41m) Page 4 of 5CMECNEPCNEPCNEPCTurkey EREN (1+1)x600MW supercritical coal fired power plantQuality Inspection and Acceptance Record Project Name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(space checking of middle columns elevation 41m axis G ) Page 3 of 5CMECNEPCNEPCNEPCTurkey EREN (1+1)x600MW supercritical coal fired power plantQuality Inspection and Acceptance Record Project Name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(space checking of middle columns elevation 41m axis K ) Page 2 of 5CMECNEPCNEPCNEPCTurkey EREN (1+1)x600MW supercritical coal fired power plantQuality Inspection and Acceptance Record Project Name#1锅炉中部钢架安装记录。#1 boiler steel structure installation(steel structure checking and installation) Page 1 of 51.appearance of the equipment: no crack, severe corrosion, damage.2.factory welding: no slag, porosity and other ponent material: no misuse.4.the deviation of column, beam length comply with manufacturers technical documentation requirements, maximum 8 mm.5.column curvature 1 / 1000 (column length), the maximum is 7 mm6.column deviation turn value 1 / 1000 (column length), the maximum 8 mm, in line with requirements.7.beam deflection, and lateral bending of values: 17mm ,deviation is less than 1.5 mm.9. bolt hole ellipticity deviation is less than 1.5mm10.The bolts and nuts has no cracks and bumps, threads are complete without grease, rust and other attachments.11.The bolts, nuts and washers are the line with equipment, technical documentation requirements.12.The node friction joints surface comply with equipment technical documentation requirements.Clean rust ,grease and dust without distortion, bending, burrs and other defects.13.Engagement plates are installed flatly, position is correctly, and structures is close.14.The maximum relative displacement of beam and column centers is 2 mm .15.The maximum parallel deviation between beams is 3 mm.16.The maximum elevation deviation of beam is 3 mm .17.The maximum horizontal deviation of beam is 2 mm.18.The maximum space deviation of beam is 3 mm.19.The steel bolt tightening torque of each node all comply with manufacturers technical documentation requirements: M16 initial screw torque is 130N.m; final screw torque end with the cinquefoil shape nut off, final pre-tension is 100KN. M22 initial screw torque is 340N.m; final screw torque end with the cinquefoil shape nut off, final pre-tension is 190KN. M24 initial screw torque is 440N.m; final screw torque end with the cinquefoil shape n
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 企业新媒体内容运营规划及执行指南
- 高职院校《市场营销》课程教学方案
- 出租车经营权买卖法律风险提示
- 阿里云应急预案
- 螺栓更换施工方案
- 路肩抹灰施工方案
- 室外消杀管理制度
- 防中毒施工方案
- 应急预案管理岗位
- 空间受限施工方案
- 全国大学生职业规划大赛《汽车制造与试验技术》专业生涯发展展示【高职(专科)】
- 腾讯云从业者课件
- 《美丽的规则》教学课件
- 排舞概述课件
- 公交安全隐患培训课件
- 轨电车试验线工程项目可行性研究报告
- 2024年卫生高级职称面审答辩(内科学)(副高面审)模拟试题及答案
- 2025年物流师(中级)职业技能鉴定试卷题型解析
- 入院记录课件模板
- 2025年自动驾驶卡车在快递物流配送中的应用前景及市场前景报告
- 2025年《治安管理处罚法》新修订课件
评论
0/150
提交评论