已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除 Spatial Site Survey QuestionnaireCUSTOMER NAME: Myanmar Ministry of Post & Telecommunications (MPT)Global TelephoneCUSTOMER SITE: Yangon existing S12 MSC site. Also includes 8650 SDM, 7500 SGSN, 5 BSCs, 3 TCs, 1 MFS, CG, old SGSN, old HLRShwe Gon Dine MPT building1st Floor : Battery + Power Supply2nd Floor: Equipment Room . CONTENTS1Environmental Considerations31.1Floor.31.2Ceiling3 1.3General Location Data4 2Site Survey Data Summary51 Environmental Considerations 1.1 FloorOn what floor(s) will the equipment located? (For example, 1st, 2nd)2ndIs there a raised floor (false floor)?If Yes, state how many inches high Yes NoTile Size: Width= Length= Thickness= Net height of floor?(distance between ground and floor)(Take measurements from several points to account for variation in floor. What type of floor covering is laid? Carpet Carpet Tiles Concrete Other (please specify)Is there enough space to move rack into switching room? Yes Noto be measured space of stairs and doors. Raised floor cable rack tile cutouts have been provided for power and signal / data cables. Yes NorPower & cable racks provided1.2 CeilingWhat is ceiling height?Height= 5 mIs there 10 feet minimum(3 meter) clearance in the area where the switch node is to be located? Yes NoIs there a false ceiling (suspended)? Yes No 1.3 General Location Data This project is InitialExpansion.Node Type is WSSWMG SGSN OtherThis office is a HostRemoteIf Remote office, what is Host? Notes:1. An audit of the power supply should be done. There is strong possibility that we will need to change the rectifiers.2. For initial deployment; my suggestion is to install first: WCS, 1xWMG, XMC; potentially 3-4 racks.3. in the old GGSN rack, there are some Ethernet switches and other networking gear that must remain, but we can remove the old GGSN and use that space for our IT equipment.Customer suggest:4. For initial placement of WCS, WMG and IT rack, there are 3 HP disk servers (CG on diagram) that can immediately be removed. Total floor space is 3m x 6m 5. Then we can also rehome some of the BTS on BSC5 (row of MFS, BSC 3 rack, MSC 3 rack). This should free up another row for later use6. The MSC3 rack is just an extension. Need to check with S12 MSC experts if this can be turned off, so that we can remove this too.7. For all sites, use cable racks overhead.8. Some other old equipment to be removed: old SGSN, old HLR, old SMSC+WAP GW.9. Need to plan also for future phases / final layout. The new ngHLR is in the current SMSC location. It should be moved closer to WCS and DDF.2 Site Survey Data Summary2.1 Distance from equipment to DDF : 3 meters2.2 Distance from equipment to ODF(if fiber used):70m2.3 Length of fiber tube(if needed):70m2.4 Fiber connector type on ODF side(LC,FC,SC):FC2.5 Distance between equipment and BITS: timing source? Need to find out.2.6 Distance between control room and switching room: beside each other; 36 meters2.7. Distance between equipment and power room:one floor around 6m ; see diagram below2.8 Distance to CE? CE2.9 Fiber connector type on CE side(LC,FC,SC)FC2.10 Trunk impedance(75ohm / 120ohm):120 ohms2.11 Height of false floor(if floor installed):n/a2.12 Need different color to define power cable?If yes, the color of -48V cable:(default is blue) the color of 0V cable: (default is black) the color of ground cable: (default is yellow/green) yes as per above2.13 Provide floorplan drawing of switching roomsee belowNote: 1. Please arrange equipment near to air condition.2. The minimum space between two suite is 1M.Comments:See notes after
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年河南省新密市辅警招聘考试试题题库含答案详解(培优b卷)
- 2025年7月25日江西省上饶市事业单位笔试《公共基础知识》试题及答案
- 肾内科慢性肾病康复护理指南
- 2025年江苏省南通市选调生考试(公共基础知识)综合能力题库附答案
- 2023年上半年教师资格证考试《小学教育教学知识与能力》真题及答案
- 2025食品安全考试练习题库(含答案)
- HPV疫苗接种计划推广策略
- 防范舞弊行为严令禁止承诺书5篇范文
- 标准化市场分析报告模板及数据指南
- 文档资料管理标准化命名及归档方案
- 大疆无人机农用版培训课件
- 资源与环境约束下山东省海洋经济可持续发展对策研究的综述报告
- 立体空间构造设计
- GB/T 6391-2003滚动轴承额定动载荷和额定寿命
- GB/T 28733-2012固体生物质燃料全水分测定方法
- 通用机场业务简介课件
- 人教精通版五年级上册英语Lesson-19精编课件
- 人教版小学五年级语文上册期中试卷及答案
- 思想道德与法治第二章
- 工程结构荷载和可靠度设计原理课件
- 外观限度样品管理办法样板
评论
0/150
提交评论