




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除 Spatial Site Survey QuestionnaireCUSTOMER NAME: Myanmar Ministry of Post & Telecommunications (MPT)Global TelephoneCUSTOMER SITE: Yangon existing S12 MSC site. Also includes 8650 SDM, 7500 SGSN, 5 BSCs, 3 TCs, 1 MFS, CG, old SGSN, old HLRShwe Gon Dine MPT building1st Floor : Battery + Power Supply2nd Floor: Equipment Room . CONTENTS1Environmental Considerations31.1Floor.31.2Ceiling3 1.3General Location Data4 2Site Survey Data Summary51 Environmental Considerations 1.1 FloorOn what floor(s) will the equipment located? (For example, 1st, 2nd)2ndIs there a raised floor (false floor)?If Yes, state how many inches high Yes NoTile Size: Width= Length= Thickness= Net height of floor?(distance between ground and floor)(Take measurements from several points to account for variation in floor. What type of floor covering is laid? Carpet Carpet Tiles Concrete Other (please specify)Is there enough space to move rack into switching room? Yes Noto be measured space of stairs and doors. Raised floor cable rack tile cutouts have been provided for power and signal / data cables. Yes NorPower & cable racks provided1.2 CeilingWhat is ceiling height?Height= 5 mIs there 10 feet minimum(3 meter) clearance in the area where the switch node is to be located? Yes NoIs there a false ceiling (suspended)? Yes No 1.3 General Location Data This project is InitialExpansion.Node Type is WSSWMG SGSN OtherThis office is a HostRemoteIf Remote office, what is Host? Notes:1. An audit of the power supply should be done. There is strong possibility that we will need to change the rectifiers.2. For initial deployment; my suggestion is to install first: WCS, 1xWMG, XMC; potentially 3-4 racks.3. in the old GGSN rack, there are some Ethernet switches and other networking gear that must remain, but we can remove the old GGSN and use that space for our IT equipment.Customer suggest:4. For initial placement of WCS, WMG and IT rack, there are 3 HP disk servers (CG on diagram) that can immediately be removed. Total floor space is 3m x 6m 5. Then we can also rehome some of the BTS on BSC5 (row of MFS, BSC 3 rack, MSC 3 rack). This should free up another row for later use6. The MSC3 rack is just an extension. Need to check with S12 MSC experts if this can be turned off, so that we can remove this too.7. For all sites, use cable racks overhead.8. Some other old equipment to be removed: old SGSN, old HLR, old SMSC+WAP GW.9. Need to plan also for future phases / final layout. The new ngHLR is in the current SMSC location. It should be moved closer to WCS and DDF.2 Site Survey Data Summary2.1 Distance from equipment to DDF : 3 meters2.2 Distance from equipment to ODF(if fiber used):70m2.3 Length of fiber tube(if needed):70m2.4 Fiber connector type on ODF side(LC,FC,SC):FC2.5 Distance between equipment and BITS: timing source? Need to find out.2.6 Distance between control room and switching room: beside each other; 36 meters2.7. Distance between equipment and power room:one floor around 6m ; see diagram below2.8 Distance to CE? CE2.9 Fiber connector type on CE side(LC,FC,SC)FC2.10 Trunk impedance(75ohm / 120ohm):120 ohms2.11 Height of false floor(if floor installed):n/a2.12 Need different color to define power cable?If yes, the color of -48V cable:(default is blue) the color of 0V cable: (default is black) the color of ground cable: (default is yellow/green) yes as per above2.13 Provide floorplan drawing of switching roomsee belowNote: 1. Please arrange equipment near to air condition.2. The minimum space between two suite is 1M.Comments:See notes after
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度新能源技术研发劳务费支付范本
- 2025年新能源汽车模具生产合同补充协议范本
- 2025年度厨师员工劳动合同规范与管理范本
- 2025版国际贸易集装箱运输合同示范文本
- 二零二五年二手车行纪销售与车辆美容合同
- 2025版地铁站商铺租赁合同附智能监控系统使用及维护协议
- 二零二五年度船舶抵押融资服务合同样本
- 物流园区物业管理及运营服务协议书
- 二零二五年度代理出租房租赁与物业管理合同
- 电子化考试系统软件性能优化与调整合同
- TB 10012-2019 铁路工程地质勘察规范
- 光伏支架培训课件
- 2022版义务教育(道德与法治)课程标准(附课标解读)
- 湖南省长沙市田家炳实验中学实验高一物理摸底试卷含解析
- 武汉仓储行业趋势分析
- 医院预算专项审计方案
- 汽车安全维护和检查
- 2023拖车运输合同
- 医务人员服务态度差存在问题及整改措施
- 公司总经理年终工作总结
- 退役军人服务中心(站)场所建设和设施配备指南
评论
0/150
提交评论