开机调试工作内容.doc_第1页
开机调试工作内容.doc_第2页
开机调试工作内容.doc_第3页
开机调试工作内容.doc_第4页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Test protocol Chilled Water GenerationYork ( WuXi ) Air Conditioning and Refrigeration Co.,Ltd. bHAcGMP-YK-SAT-001Section One: Running Procedure开机程序开机调试工作内容CONTENT OF RUNNING 一 检查调整Inspecting and adjustingA. 机组外围检查(下列项目若符合要求,请在“是”前的中打“”;若不符合要求,请在“否”前的中打“”,并在虚线上说明)Inspecting the periphery of the unit (If the following items meet the requirements, please draw“”in at the front of “Yes”; if not, please draw “”in at the front of “No”, and illustrating the reason at the broken line)安装水平是否符合规范: 是(Yes) 否(No) If the installation level meets the specifications or not: 水流开关安装位置是否符合规范: 是 (Yes) 否(No) If the installation location of the flow switch meets the specifications or not 冷冻水系统清洗是否符合规范: 是 (Yes) 否(No) If the flushing of the chilled water system meets the specifications or not 冷冻水系统放气是否符合规范: 是 (Yes ) 否(No) If the air-exhausting of the chilled water system meets the specifications or not冷冻水泵检查是否符合规范: 是(Yes ) 否(No) If the inspection of the chilled water pump meets the specifications or not冷却水系统清洗是否符合规范: 是(Yes ) 否(No) If the flushing of the cooling water system meets the specifications or not冷却水系统放气是否符合规范: 是(Yes ) 否(No) If the air-exhausting of the cooling water system meets the specifications or not是否具备冷负荷: 是(Yes ) 否(No) If possessing the refrigeration dutyor not是否准备好控制电源: 是(Yes ) 否(No) If making good ready of the controlling power控制电压:伏特(Volt) Controlling voltage是否准备好各项电源: 是(Yes ) 否(No) If making good ready of all items of power supply是否安装好水流开关: 是(Yes ) 否(No) If well-installing the flow switch or not是否安装好与水泵联锁: 是(Yes ) 否(No) If the interlock with water pump installation well or not B. 机组阀门检查The inspection of the unit valves已检查和开启应开启的阀门 :Have inspected and turned on all the valves which should be turned on 故障阀门及处理:Failure valves check and their disposal C. 电机绝缘检查Motor insulation inspecting用伏绝缘表测量电机绝缘: Use V Insulation testers to measure the motor insulationA相地Phase-earth兆欧M, standard is 20M B相地Phase-earth兆欧M, standard is 20MC相地Phase-earth 兆欧M, standard is 20M AB相Phase兆欧M, standard is 20M AC相phase兆欧M, standard is 20M BC相phase 兆欧M, standard is 20MD. 联轴器检查(已检查的请在中打“”,需要时请在虚线上详细说明)The coupling inspecting (If inspected, please draw“”in the .If necessary, please specifyat the broken line) 已检查跳动度及锁紧螺丝: Have inspected the runout and locked the screwE. 控制线、油泵线、起动柜接线及检查(已检查的请在中打“” ,需要时请在虚线上详细说明)Controlling line, oil pump line, starting-up cabinet connecting and inspecting (If inspected, please draw“”in the .If necessary, please specifyat the broken line)接触器检查: Contactor inspecting联锁机构检查: Interlock mechanism inspecting接线及线径要求检查: Wiring and line diameter inspecting所有接线端子检查和紧固: All connecting terminal inspecting and tighteningF. 控制电源、油泵电源通电检查(已检查的请在中打“” ,需要时请在虚线上详细说明)Controlling power supply, oil pump power supply inspecting while power is on (If inspected, please draw“”in the .If necessary, please specifyat the broken line)检查电压: Inspecting voltage控制中心诊断及设定:Diagnosing and setting for controlling center 电磁阀工作:Check solenoid valve working加热器工作:Check heater working油泵起动及油压:Oil pump starting-up and oil pressure滑阀或导叶校正:Slide valve or vane adjustmentG. 主电源接线及电压检查Main power connecting and voltage inspectingA相电压phase voltage伏vB相电压phase voltage伏vC相电压phase voltage伏v开机调试(已检查的请在中打“” ,需要时请在虚线上详细说明)Running commissioning (If inspected, please draw“”in the .If necessary, please specifyat the broken line)H. 开机前准备Preparation before the running再次检查确认各电源及接线:Inspecting again to make sure all the powers and wire connecting再次检查控制中心设定值:Inspecting again the setting value of the controlling center 检查油路和油压:Inspecting the oil circuit and oil pressure检查电机轴承润滑情况及按要求加注润滑油:Inspecting the motor bearing lubricating condition and adding lubricating oil according to the requirements记录开机前机组状态参数:Recording the unit status parameters before runningI. 调试过程Commissioning procedure检查核对电机转向:Checking the motor rotating direction密切注视和调整机组各运行参数:Drawing close attention to and adjusting all the unit running parameters 密切留意机组及附属设施的振动和噪声: Drawing close attention to the vibration and noise of the unit and auxiliary facilit

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论