全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Infinity TowerDubai, UAEBuildings Home Case Studies: Mixed Use Infinity Tower, Dubai, UAEDubai Infinity Tower Twists for Spectacular Viewsby William F. Baker1 and Bradley S. Young2Skidmore, Owings & Merrill LLP Chicago, IllinoisIn a distinctive application of architectural expressions through structural form, the Infinity Tower twists a full 90 degrees from its base to its crown, 305 meters (1,000 feet) above the ground, through a series of incremental plan rotations at each level. The architects proposed the twisting geometry of the Tower as a means to maximize the views at different elevations. Near the base of the Tower, the Marina is the primary view. Ascending up the Tower, views to the Gulf take precedence and the building geometry is a response to this topography.The 73 story cast-in-place reinforced concrete Infinity Tower consists of 122,000 m2 (1,312,500 ft2) of residential and amenity space, as well as 12 levels of parking including 6 parking levels below grade. Currently under construction and scheduled to open in 2011, Infinity Tower will stand as an iconic centerpiece for the Dubai Marina.The Tower is founded upon a 3 meter thick reinforced concrete mat foundation which is supported by ninety-nine 1.2 meter diameter bored, cast-in-place reinforced concrete piles extending approximately 30 meters below the mat foundation. The piles transfer the Tower loads to the subgrade primarily through side friction. The subgrade consists of loose sands and sandstone bands overlaying cemented marine deposits and calcareous silt limestone/siltstone.The lateral load resisting system for the Tower consists of a combination of a moment-resisting perimeter tube frame and a circular central core wall, connected by the two-way spanning reinforced concrete flat plate slabs at each level acting as rigid diaphragms. This system maximizes the effective structural footprint of the Tower by utilizing a significant amount of the vertical reinforced concrete for lateral load resistance.The design philosophy for the Tower is based upon the exterior form of the building as a direct expression of the structural framework. The engineers studied a series of options for the perimeter frame in order to create the unique twisting geometry of the Tower. Ultimately it was determined that there were distinct advantages to stacking the columns. Each column slopes in one direction, and is offset over the column below, in order to generate the twisting building form. As the perimeter columns ascend from story to story, they lean in or out, in a direction perpendicular to the slab edge. At every level, the columns shift in position along the spandrel beams so that each column maintains a consistent position at each floor relative to the tower envelope. The corner columns and the six (6) interior columns twist as they ascend.In order for the Infinity Tower to be realized as a viable, built structure, the seemingly complex building form must ultimately be derived from a structure which is easy and efficient to construct, and which leads to practical architectural floor layouts. The system as described above offers significant construction simplification through formwork repetition, which directly impacts the construction cycle time. Also, this system leads to residential floor layouts which are repetitive at each level despite the twisting nature of the building form.The circular central core walls, which ascend purely vertically, are cast using a slip-forming system operating through incremental but not continuous advancement, in order to remain ahead of, but in phase with the construction of the perimeter frame of the Tower. The circular nature of the central core walls made slip forming an attractive option in order to avoid the potential difficulties in adjustment of the formwork panels towards the inside of the circular core walls as would be the case with jump-form operations. The perimeter concrete tube frame (columns and spandrel beams) and slabs are cast using an interlocking metal formwork system by MFE (Mivan) Formwork. The perimeter column stacking configuration means that the forms are identical at each story, simplifying the formwork erection operation. A construction cycle time of 6 to 7 days per story is consistently being achievedDue to the unique twisting geometry of the Tower, the structure has a natural tendency to undergo additional horizontal twist movement under gravity loads, a significant portion of which results from the self-weight of the cast-in-place structure. Additional movement is expected during construction and over the life of the structure due to creep and shrinkage effects of the cast-in-place concrete. In order to understand the potential movement of the structure, a detailed analysis was performed taking into account the anticipated construction sequence, and time dependent variables; such as creep, shrinkage, and variation in concrete material properties. A comprehensive and continuous building movement surveying program has been implemented in order to track the behavior of the Tower during construction. This information is used by the engineers in order to confirm the expected behavior of the structure, and by the contractor in order to plan for the appropriate construction alignment compensation.Cast-in-place reinforced concrete was selected as the primary construction material for this project primarily due to its ideal mass and stiffness characteristics, which aid in the reduction of wind-induced movement of the Tower, a governing factor in the design of tall, slender towers.
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中小学生安全教育课件
- 2025年秋河大版(三起)(新教材)小学信息科技第一册期末综合测试卷及答案
- 电力系统与安全课件
- 2024年12月职业健康管理体系真题及答案
- 4月全国房地产经济学自考试题及答案解析
- 2025节能环保知识竞赛题库及答案
- 卫生专业法律试题及答案完整版
- 2025年养老护理员考试技师培训模拟试题(含答案)
- 网络安全教育课件
- 大学篝火晚会策划方案
- 2025年从业人员食品安全知识培训考试题与答案
- 阿尔兹海默病病人的护理
- GB/T 45763-2025精细陶瓷陶瓷薄板室温弯曲强度试验方法三点弯曲或四点弯曲法
- 学校消防课件模板下载
- 佳明手表Fenix3 HR说明书
- 安全bp是什么职位
- 糖尿病合并高血压的护理
- 基础医学概论(第3版)课件全套 第1-8章 绪论-病理学与病理生物学基础
- 征拆公司内部管理制度
- 《WinCC课件第一章》课件
- GB/T 45382-2025成型模直导柱、带肩导柱和带肩定位导柱
评论
0/150
提交评论