填料安装指导.doc_第1页
填料安装指导.doc_第2页
填料安装指导.doc_第3页
填料安装指导.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

填料安装指导Packing installation instructions一、散堆填料Random packings 散堆填料为25拉西环和科斯特O型填料两种,散堆填料只需将填料倒在塔内的支撑层上就可。Random packings for 25 raschig ring and Kesite O the packing two kinds of random packings simply pour packing support layer on the tower. 注:1.聚丙烯塑料填料易变形,请勿让人站在填料上。Note: 1. Polypropylene plastic packing easy deformation, do not let a person standing on the packing. 2.拉西环受压易破碎,请勿让人站在填料上。2. Raschig ring compression is easy broken, please do not let a person standing on the packing. 二金属规整填料Metallic structured packing 1.填料安装前请首先检查支撑的水平度。The packing before installation, please first check the levelness of the support. 2.金属规整填料的安装祥见示意图,安装时建议从两边往中间铺放,上下两层要交错90。安装缝隙要求是塔边不留缝。The installation of metal structured packing see detailed schematics, Suggestions from both sides to middle laying when installation, up and down two floors to cross 90 DHS. Gap installation requirements are tower side seam. 三轻瓷填料Light porcelain packing 1. 填料安装前请首先检查支撑的水平度。Packing before installation, please first check the levelness of the support. 2第一层填料安装时填料的支承脚向上,最大接触面和支撑层接触,第二层轻瓷填料安装时填料的支承脚向下和第一层填料的支承脚相对。Packing packing when installation supporting legs of the first layer, the maximum contact area and contact support layer, the second light porcelain packing packing when installation of supporting foot down and the first layer packing relative supporting feet. 3.从第三层填料开始要求填料间错层、错30角安装。From the third layer between packing started demanding packing wrong, wrong in 30 DHS installation Angle. 4.自下向上填料间的安装间隙由30mm逐渐缩小到最表面二层无间隙安装,这样最符合水汽力学的原理。From bottom to top by 30 mm installation clearance between packing gradually narrowed to the surface layer has no clearance to install, so most conforms to the water vapor mechanics principle. 5.轻瓷填料安装完毕在开车前要求用水将所有的填料淋湿,确保填料的侵润性。Light porcelain packing installed before driving water will get wet all of packing, to ensure that the packing of the invasion. 附:安装示意图Attached: the installation diagram 安装工具说明:1 吊车一台2 吊篮L=1600*B=

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论