




已阅读5页,还剩22页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Makeblock Ultimate Robot Kits - Ball LauncherIntroductionThe Ball launcher is one of the Ultimate robot. You can control your robot with your smart device through a Bluetooth connection. And by adjusting the rotation of the motor launch a ball.For the installation steps, please do as follows. If you have any question about it, please post your trouble on the forum, I would give a replay.Now, lets startStep 1Materials list4*Threaded Shaft 4*393*D Shaft 4*502* Shaft Collar 4mm4*Shaft clamping hub 4mm2*Beam 0808-882*Beam 0824-1282*Timing pulley Slice 90T-New1*Motor Bracket 25V21*Motor Bracket 37V22*Plate D1*Bracket P31*Timing pulley 18T1*Gear m1*1630*Screw M4*827*Screw M4*142*Screw M4*164*Screw M4*221*Screw M4*353*Beam 0808-1842*Beam 0824-1442*Beam 0824-961*Beam 0824-802*Beam 0824-642*Base board plate V1.119*Hex nuts M4-N6*Screw M3*812*Hex Socket screw4*Plastic ring 4*7*25*Nylon M41*Gear m1*801*Timing pulley 90T1*Timing belt 123T 98mxl1*DC Motor 25mm V2.01*DC Motor 37mm V2.03*Bracket 3*311*Bracket 3*61*Rubber band1*Plate 7*9Electronic materials1*Makeblock Orion1*6P6C RJ11 cable 20cm1*Me Bluetooth Module V2.01*Battery Bracket6*AA Battery 1.5VStep 2Tools1.5mm Hexagonal Screwdriver3mm ScrewdriverSpannerStep 3Building the base:Materials:2*Beam 0824-1442*Beam 0824-1282*Beam 0824-961*Beam 0808-8810*Screw M4*144*Screw M4*224*Hex nuts M4-NProcedure:1. Install the Beam 0808-88 on Beam 0824-128.2. Assemble a rectangle by 2*Beam 0824-128, 2*Beam 0824-144 and 8*Screw M4*143. The Beam 0824-96 vertically mounted on the Beam 0824-144 with 4*Screw M4*22 and 4*Hex nuts M4-NStep 4Assembling transmission of DC motor 37mmMaterials:6*Screw M4*144*Screw M3*85*Hex Socket screw4*Hex nuts1*Beam 0808-881*Beam 0824-801*D Shaft 4*502*Shaft clamping hub 4mm2*Threaded Shaft 4*391*Timing pulley 90T2*Timing pulley Slice 90T-New1*DC Motor 37mm V2.01*Motor Bracket 37V21*Timing belt 123T 98mxl1*Timing pulley 18T1*Plastic ring 4*7*2Procedure:1. Install the two Timing pulley Slice 90T-New and a Shaft clamping hub 4mm on the Timing pulley 90T by using two Hex Socket screws, four Screws M4*14 and two Hex nuts.2. 2*Threaded Shaft 4*39 are installed on both ends of Beam 0808-88 and a Shaft clamping hub 4mm is installed in the middle of Beam 0808-88.3. Install 1 and 2 on the top of the hole by using a D shaft.4. Install Motor Bracket 37V2 and Timing pulley 18T on DC Motor 37mm V2.0 with 2*Threaded Shaft 4*39 and a Hex Socket screwStep 5Assembling transmission of DC motor 25mmMaterials:1*DC motor 25mmV21*Motor bracket 25V21*Shaft clamping hub 4mm1*D Shaft 4*504*Hex Socket screw2*Screw M3*81*Bracket 3*31* Shaft Collar 4mm1*Timing pulley 18T1*Timing pulley 90T4*Screw M4*14Procedure:1. Install the Motor bracket 25V2 on the DC motor 25mmV2 by using 2*Screw M3*82. Make the motor shaft through the third from the bottom up of the hole, and install Timing pulley 18T on the motor shaft.3. Install the Shaft clamping hub 4mm and Bracket 3*3 on both sides of Timing pulley 90T.4. Install 3 on the top of the hole by using D shaft, shaft collar and three Hex Socket screws.Step 6Make a launcherMaterials:2*Beam 0808-1842*Beam 0824-642*Plate D1*Bracket P32*Bracket 3*32*Threaded Shaft 4*3915*Screw M4*82*Screw M4*141*Screw M4*355*Hex nuts2*Plastic ring 4*7*21*Nylon M4Procedure:1. One of Plate D and Bracket P3 mounted on one end of the two Beam 0824-642. Put Beam 0808-184 through Plate D, then install Threaded Shat 4*39 on the first and the eighth holes of Beam 0808-184.3. Install Nylon M4 on Plate D with 2*Plastic ring 4*7*2, a Screw M4*8 and a Screw M4 *35. Then install Plate D on the other end of the two Beam 0824-64.4. Install 2*Bracket 3*3 on both sides of Beam 0824.5. Install Beam 0808-184 on the right of Bracket 3*3.Step 7Assembly of electronic modulesMaterials:6*Hex nuts12*Screw M4*84*Screw M4*144*Nylon M41*Makeblock Orion1*6P6C RJ11 cable 20cm1*Me Bluetooth Module V2.01*Battery Bracket6*AA Battery 1.5V2*Base board plate V1.1Procedure:1. Install Makeblock Orion on one of Base board plate V1.12. Install four Nylons on the Base board plate V1.1 by using four Screw M4*8.3. Install battery bracket on the other Base board plate V1.1.4. Install the Base board plate V1.1 on the Nylon M4.5. Install the Me Bluetooth Module V2.0 on the Beam 082496 of the base.Step 8Assembling everything up frontMaterials:1*plate 7*91*Bracket 3*61*Beam 0808-1846*Screw M4*142*Screw M4*164*Screw M4*88*Hex nuts M41*Plastic ring 4*7*21*D Shaft 4*503*Hex Socket screw1* Shaft Collar 4mm1*Shaft clamping hub 4mm1*Rubber bandProcedure:1. Install D Shaft 4*50 on Beam 0824-96 by using Shaft Collar 4mm and Shaft clamping hub 4mm2. Install Bracket3*6 on DC motor 37 mm, then install on the Shaft clamping hub.3. Install the Rubber band on Timing pulley 18T and Timing pulley 90T, then install Bracket 3*3 of the launcher4. Install the other Bracket 3*3 of the l
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年刑法模拟检测试卷(刑法中的法律漏洞问题)
- 2025年高压电工考试题库:高压设备故障诊断与设备运行管理实战试题
- 2025年大学科学教育专业题库- 科学教育中的全人教育理念
- 2025年大学人文教育专业题库-阳光草堂第四卷
- 2025年大学人文教育专业题库- 人文教育的课程设计与实施
- 2025年大学华文教育专业题库- 语文教学中的情感识别培养
- 2025年起重机械作业特种作业操作证考试试卷(起重机械制动与润滑系统标准案例分析)试题
- 2025年大学科学教育专业题库- 科学探究教学策略与实践案例
- 2025年消防应急救援指挥培训考试题库:消防安全知识及应急指挥试题
- 2025年护士执业资格考试题库(社区护理学专项)社区护理信息管理试题型
- 穴位按摩法操作评分标准
- 充电站运营管理制度(参考模板)
- 体育与健康教学设计《手倒立前滚翻》
- NISP一级考前模拟训练题库200题(含答案)
- JJG 20-2001标准玻璃量器
- 2024外研版初中英语单词表汇总(七-九年级)中考复习必背
- 《大数据平台部署与运维》课程标准(含课程思政)
- 英语中的时间表达(示范课例)
- 脊柱外科进修汇报
- 《史记》上册注音版
- 苏州大学文学院语言学纲要课程笔记
评论
0/150
提交评论