




已阅读5页,还剩81页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
电力工程专业技术英语培训教材 电力工程专业技术英语培训教材说明 1. 教材选编原则 本教材的选编,针对具有一定英文基础、长期从事电力工程建设的工程技术管理人员,侧重选取 易记易懂的电力建设领域各种英文文献; 本教材内容针对的是电力工程建设、运营涉及的专业技术英语方面,而非技术领域本身。授课人 重点分析解读文献中所涉及的语汇、表达,使学员能够学以致用、举一反三。 2. 对各章内容的分析,我们按Contents(原文内容)、Notes to the text(文本中难点疑点的注释)、 Key words explanation 核能发电 in parallel with 在的同时 The growth of the power supply industry in Hong Kong has been very rapid in the last few decades. However, due to the world energy crisis and political instability in certain oil exporting countries the price of oil has increased substantially and has affected the development and sales of electricity in Hong Kong. Consequently, it is now considered beneficial to develop nuclear power generation in parallel with the coal-fired plant now under construction. Obviously /greatly/substantially consequently, as a result of the above; Beneficial to 对.有益的 电力工程专业技术英语培训教材(试用)第一章第一章 广东大亚湾核电站可行性研究报告选读广东大亚湾核电站可行性研究报告选读 1-3 Contents (English Version)Notes to the textKey words explanation bring about, 引起,产生,造成 stimulated encourage, excite, enable; appreciate evaluate, assessment There are already 15 countries using trengthene water reactors and as a result there is wide experience available of PWR design, manufacture, construction and operation. By adopting the PWR, the Joint Venture will be able to draw on this background of technical expertise and experience. draw on, deploy, make use of 电力工程专业技术英语培训教材(试用)第一章第一章 广东大亚湾核电站可行性研究报告选读广东大亚湾核电站可行性研究报告选读 1-7 Contents (English Version)Notes to the textKey words explanation mature proven, NSSS-Nuclear Steam Supply System 核蒸汽供应sys. There must be no problems associated with obtaining equipment from the countries of manufacture. Any stipulations made by the vendors Government on nuclear equipment and nuclear fuel must be acceptable to the Government of the Peoples Republic of China, be acceptable to The price and financing terms must be competitive, taking account of any assistance with financing available from the vendors government. The vendors must be prepared to accept a scope of responsibility and a contracting method appropriate to the Joint Venture. Financing terms, 融资条款 be competitive 具竞争力的 appropriate to . Suitable for Competitive bidding 电力工程专业技术英语培训教材(试用)第一章第一章 广东大亚湾核电站可行性研究报告选读广东大亚湾核电站可行性研究报告选读 1-8 Contents (English Version)Notes to the textKey words explanation ICRP 国际辐射防护委 员会 IAEA 国际原子能机构 Hereinafter referred to as (以下简 称) International commission on Radiological Protection The method of safety analysis that will be used for the joint nuclear power station will draw on the experience existing in other countries at the time licensing is undertaken in XXX. At the present time it is envisaged that the method adopted will mainly be based on a Design Basis Accident (DBA) approach, with use of the Event or Fault Tree Analysis method to give additional verification that there will be no unacceptable risks to the environment. All the potential reactor vendors should be capable of supplying plant to meet the required safety standards and will be able to assist GPC and CLP to prepare the necessary safety documents. Draw on 引用,利用 预计 estimated. Design Basis Accident (DBA) with use of / by making use of potential reactor vendors possible reactor vendors DBA- Event or Fault Tree Analysis method “事件或故障树分析”法 Verification Report 验证报告 NCR, CAR, corrective action verified by QA/QC CT, PT (Potential Transformer ) The joint utility will take responsibility for the safety of the nuclear power station under the guidance and inspection of the relevant authorities of the Peoples Republic of China. Take responsibility for负起的责任 bear responsibility for 对负有责任。 Liable for 对.应负贵任的 2.4.QUALITY ASSURANCE An effective approach to quality assurance will be required throughout the manufacturing and construction period, both to ensure the general quality of all components used and specifically to meet the stringent safety requirements associated with the nuclear related plant. Make an approach to 对进行探讨/研究Quality-related activities Safety-related issues In order to implement the overall quality assurance intentions, it is necessary that appropriately staffed quality assurance trengthened and acceptable programs exist in all companies involved in the project. The quality assurance trengthened of the joint venture company will report directly to the appropriate engineering management and will undertake the surveillance of the quality assurance trengthened of all other parties. In this way the quality assurance trengthened of the Joint Venture Company will take full responsibility for all aspects of quality at each stage of the project. In order to For the purpose of exist available undertake the surveillance of . = bear responsibility for surveillance of appropriately staffed 配备了适当人员的质保机构 involved in the project; in this way, by doing so, Quality Surveillance Deficiency Report QSDR- editorial staff 编辑部 general staff 总参谋部 operating staff 维护(操作人员) appropriate engineering management, 上 一级工程管理部门 top management of a company 公司最 高管理机构 电力工程专业技术英语培训教材(试用)第一章第一章 广东大亚湾核电站可行性研究报告选读广东大亚湾核电站可行性研究报告选读 1-10 Contents (English Version)Notes to the textKey words explanation Engineering, procurement, Construction It is the intention that, to achieve further transfer of technology and to reduce foreign exchange requirements, preference will be given to GPC resources for civil engineering and plant erection work on site. It will be necessary, for this approach, that the price can be shown to be competitive on an international basis. 优先权, 选择权 优先考虑GPC 但此方法必须证明土建与安装费是具竞争力 的国际竞标价。 It is the intention that,(句型) It will be necessary, for this approach, that the price . (句型) for this approach 指代什么? 2.8.PROGRAM The preliminary planning of the project has been aimed at commercial load on unit 1 being achieved in April 1988 with unit 2 following one year later. This is an extremely tight program demanding the utmost efforts from all parties. It is particularly important that the joint venture company is set up in the very near future to allow detailed work to be put in hand. #2机顺延一年, 需要各方全力以赴 put in hand 开始做 The time allowed for each major phase of the project is :- initial phase (starting in early 1980 at the beginning of the feasibility study):27 months site formation phase:12 months construction phase:48 months testing phase :12 months Following the initial phase, the critical activities for financial viability will be the site formation, the reactor foundations and the erection and commissioning of the nuclear steam supply system which must be held to time scale. Further financial model analyses and sensitivity tests will be made based on any revision necessary in the starting date and duration of the overall construction program. Relating to financial time scale 时标,时间量程 schedule must be held to time scale kept with the time schedule. Site formation (四通)一平 important (critical, main, major, key, principal, crucial, activities) 在方面 revision in the starting date duration of the overall construction programme. Financial viability 财政适应性 Financial model analysis 财务模型分析 Sensitivity tests 敏感性试验 电力工程专业技术英语培训教材(试用)第一章第一章 广东大亚湾核电站可行性研究报告选读广东大亚湾核电站可行性研究报告选读 1-12 Contents (English Version)Notes to the textKey words explanation so the transformers and the turbine hall are located on the opposite side of this cold source, with regard to the nuclear buildings, and the circulating water pipes go under the nuclear auxiliary building. Cold source transit of the high voltage transmission line While, whereas Nuclear building(=reactor building) NI CI BOP Penetrations 贯穿件 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-3 Contents (English Version)Notes to the textKey words explanation they uncouple the buildings from the soil in such a way that the design is virtually independent of the amplitude of the earth-quake, particularly in the high frequency range. If the amplitude of the low frequencies exceeds a given value, slipping surfaces (a leaded bronze plate and a stainless steel plate) are associated with each bearing pad in order to reduce the peak values transmitted to the buildings. This technique can be used whatever the spectrum (in particular the NRC spectrum); never-theless, important savings can be carried out by using a spectrum fully adapted to the seismic conditions of the site (that has been made in France with the spectrum defined by EdF). The aseismic bearing pads were used for the KOEBERG plant in South Africa (with a specific spectrum). Aseismic bearing pads 抗震支座垫 lower raft 下部筏基 upper raft 上部筏基 be made of interleaved (交错)sheets of elastomer(合成橡胶) the height, 66.5 mm, consists of 3 sheets of elastomer between 4 sheets of soft steel. The total number of pads is 1750 for one nuclear island (i.e. a pair of units); they are arranged by 2 or by 4 on concrete pedestals whose height varies between 1.5 and 2 m. From a seismic point of view, Earthquake focus/seismic focus 震源 Soft steel 软钢,低碳钢 they are arranged by 2 or by 4 on concrete pedestals whose. Material requisition sheet 领料单 Log sheet 记录单 Sheet 1 of 5 sheets (第1页共5页) Foundations of CRUAS power plant. In the background are the aseismic bearing pads under construction 1.3REACTOR BUILDING The reactor building encloses the nuclear steam supply system components. From a safety point of view, it constitutes the third barrier for the protection of the public against the consequences of an accident (the first barrier is the fuel cladding and the second is the reactor coolant pressure boundary). NSSS 三道屏障 three barriers- fuel cladding, pressure vessel = reactor coolant pressure boundary and the containment. During normal operation, this building has to protect the reactor coolant system against external events (such as aircraft crash, turbine missile, earth quake, etc.), and it is a shielding against reactor core radiation. A shielding against防护,屏蔽reactor core radiationaircraft crash, turbine missile, earthquake etc. Under abnormal or accident conditions, it has to limit the radiological consequences to acceptable values at the site boundary. Radiological consequences- radiological hazards / harms radiological effect 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-5 Contents (English Version)Notes to the textKey words explanation the prestressed concrete thickness is 0.9m for the wall and 0.8 m for the dome. In case of (using) aseismic bearing pads 抗震支座垫 independent with. The leak tightness is ensured by a 6mm steel liner fixed to the concrete wall by means of mild steel anchors. The leak tightness is ensured by 严密封,密封性 fixed to concrete wall by means of, by using /using prestressed concrete 预应力混凝土 steel liner 钢内衬 mild steel anchors 低碳钢锚件 soft steel / low carbon steel 低碳钢 The connections with the outside are performed by the following penetrations: equipment hatch (inside diameter: 7.4 m at level20.00), personnel air lock (inside diameter: 2.9 m at level8.00),personnel air lock 人行通道气闸 emergency personnel air lock (inside diameter: 2.9 m at level 8.00), emergency personnel air lock 160 electrical and mechanical penetrations (inside diameter: from 0.25 to 1.3m). The upper part of the wall is provided with steel corbels for the polar crane (190 t and 50 t plus 190 t more during construction period). Is provided with / is equipped with steel corbels for the polar crane 环形吊车用钢制托梁 A metal gantry with one 380 t trolley and one 60 t trolley allows the introduction of hyeavy or bulky equipment, into the reactor building, through the equipment hatch. Metal gantry 金属龙门架trolley 空中吊运车,跑车allow the introduction of into 引入,输入 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-6 Contents (English Version)Notes to the textKey words explanation they ensure the support of the NSSS equipment and, if necessary, the radiation protection. Radiation protection 辐射防护 The main parts of these structures are: the reactor pit: the purpose of this reinforced concrete ring (thickness from 1.80 m to 2.10 m) is to support the reactor vessel, to limit the amplitude of its motion in case of an accident and to ensure a biological Protection for personnel and equipment; reactor pit 反应堆坑 reactor vessel 反应堆容器 the skirt: the main purpose of this circular wall (inside diameter: 29.5 m, thickness front 0.60 to 1.0 m) is to support the anchorages of the steam and feedwater piping, and to ensure a biological protection; skirt 裙,侧缘,边缘 auchorages of the steam 稳压器机壳(隔间,仓,隔离框架,隔板) primary pump, 主泵 the reactor cavity, lined with stainless steel, has two parts: the reactor vessel part and the reactor internal storage part; reactor cavity 反应堆换料腔 lined with.衬以. the two main operating floors (at level + 4.60 and + 20.00) and the intermediate floors. Main operating floors 运转层 intermediate floors 中间层 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-7 Contents (English Version)Notes to the textKey words explanation made of reinforced concrete, they house most of the equipment and piping of systems dealing with the operation and the safety of each unit (such as the chemical volume and control system) and the radioactive waste systems. Be made of be made from 之区别 be common to ; reinforcement concrete; dealing with, radioactive waste systems; house v. = contain For these buildings, an important partitioning is made with the governing idea to ensure a physical separation between redundant equipment and to make their operation and maintenance easier. This partitioning as well as the installation of biological protection (fixed or movable) allows the personnel radiation protection to be improved. Partitioning, make easier biological protection 生物防护 allowsto be improved personnel radiation protection 1.6ELECTRICAL BUILDING The electrical building, made of reinforced concrete, and situated above the cable and pipe galleries, houses within 6 levels: cable made of reinforced concrete, situated above. the reciprocating compressors (compressed air supply), the auxiliary feedwater system pumps and the control rod drive mechanism power supply. reciprocating compressors (compressed air supply) aux. F.W. system pumps; control rod drive mechanism power supply the small part store and workshops, the locker rooms and laboratories, locker rooms 更衣室 the batteries, cable and relay rooms, electrical boards, 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-8 Contents (English Version)Notes to the textKey words explanation turbine missile, anti-missile wall, concrete slab 1.7TURBINE HALL 1.7.1CP1 plants The turbine generator sets are housed in-line in a single building which is a reinforced concrete structure up to the turbine generator floor. Above this level is steelwork except the long wall on the reactor side. In the event of turbine breaking up, this anti-missile wall, especially strengthened, would take the impact of a turbine blade or other missile, leaving the other buildings undamaged. The turbine hall is not designed against earthquake, be housed in-line in a single building; except.除以外 in the event of would take the impact of a turbine blade or other missile, leaving the other buildings undamaged. Turbine generator set in the event of ; reinforced concrete structure ; turbine generator floor steel work/steel structure The turbine hall contains three longitudinal banks, from the anti-missile wall to the outside : anti missile wall the heater bank, the turbine generator bank, in which the turbine generator reinforced concrete pedestals are completely independent and separate from the turbine hall structures, heater bank 加热器组 / tube bank 管排 reinforced concrete pedestals tube sheet, tube bundle 管板 管束 the handling bank (handling is performed by two 190t/30t cranes, which can be paired to achieve a 340t capacity and an additional 50t crane in a 4-unit site). Be paired to achieve. handling bank (设备搬运) 吊车组合 two 190t/30t cranes 使用2台190t/30t cranes (吊车) 4-unit site 10-minute walk 16-meter long steel wire 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-9 Contents (English Version)Notes to the textKey words explanation the roofing may be made of steel and sound-proofed. Because of the radial arrangement, the anti-missile wall is no longer necessary. This building is not designed against earthquake. With regard to roofing turbine hall roof be made of be made from; sound proofed, noise-proof structure; no longer; reactor building / nuclear building, turbine hall, main building main power building The turbine hall contains four longitudinal banks, from the left to the right: the heater bank, the turbine-driven feedwater pump bank, the turbine generator bank with independent reinforced concrete pedestal, heater bank; turbine driven F.W. pump bank; CW pump bank 循环水泵组 the circulating water pump bank. Handling is performed by a longitudinal 240t crane and a 40t crane. 电力工程专业技术英语培训教材(试用)第二章第二章 法国法国EDF Gravelines核电站培训教材选读核电站培训教材选读 2-10 Contents (English Version)Notes to the textKey words explanation The connection between the circulating water pumps and the condenser is made by concrete pipes, consisting of seam welded steel shells protected inside and outside with reinforced concrete. The connection between the essential service water pumps and the component cooling system building is made by metal pipes installed within reinforced concrete galleries, protected against earthquake and that can be inspected. Consisting of seam welded steel shells protected inside. metal pipes / carbon steel pipes reinforced concrete galleries connection conduit culvert passage way be made by be made of galleries corridors, raceway, channel concrete pipes component cooling system building The pumping stations are provided with gantry cranes for handling. 1.9OTHER BUILDINGS The other buildings of the site are:other buildings at the plant site include: the diesel generator buildings: two i
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 银行消防培训试题及答案
- 地质勘查专业试题及答案
- 电气资料专业试题及答案
- 专业测试题及答案
- 安徽省江淮名校2024-2025学年高二上学期期中考试物理试卷(含答案)
- 网络内容行业技术规范
- 客户见面致辞示例
- 个人工作总结副科长
- 集土坑施工方案
- 老旧小区临水施工方案
- 单孔腹腔镜课程讲义课件
- 优秀初中语文说课课件
- 人教精通版六年级上英语Lesson15教学课件
- 人工血管动静脉内瘘术后护理课件
- 普通逻辑ppt课件(完整版)
- GB∕T 16762-2020 一般用途钢丝绳吊索特性和技术条件
- 《小学语文课程与教学论》复习题
- DB32∕T 4065-2021 建筑幕墙工程技术标准
- 施工现场环保工作措施
- 资产清查服务方案模版
- 检具设计PPT.
评论
0/150
提交评论