




已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
PLC QUESTIONPLC which should pay attention in the application is specially the control device which serves for the industrial production, usually does not need to take any measure, may use directly in the industry environment. But, when the production environment is too bad, the electromagnetic interference is special intense, or installs uses improper, cannot guarantee PLC the normal operation, therefore should pay attention to the following question in the use. First, installment and wiring(1) The power line, the pilot wire as well as the PLC power line and the I/O line should distinguish the wiring, between the insulating transformer and PLC and I/O should use the double rubberized wire connection.(2) PLC should be far away from the strong jamming source like electric welding machine, the high efficiency silicon rectifier unit and the large-scale power equipment, cannot install with the high-pressured electric appliance in the identical switch cabinet. (3) The input and output of PLC are best separate the line, the switch quantity and the simulation quantity must separate the placing. The simulation quantity signals transmission should use the shielded wire, the shielding layer should an end or the both sides earth, and the earth resistance should be smaller than the shielding layer resistance 1/10. (4) The PLC elemental area and the expansion unit as well as functional modules ties cable should lie alone, prevents the outside signal the disturbance.(5) The exchange output line and the direct-current output line do not use the identical root electric cable, the output line to be far away from the high tension line and the power line as far as possible, avoids parallel. Second, I/O end wiring 1. Input wiring (1) inputs the wiring not to surpass 30 meters generally. But if the environment disturbance is small, when the loss of voltage is not big, the input wiring may suitable long. (2)Inputs/the output line not to be able to use the identical root electric cable, the input/output line to be separated. (3)Uses the normally opened contact form to connect the input end as far as possible, causes the establishment the trapezoidal chart to be consistent with the relay schematic diagram, is advantageous for reading. 2. Outgoing junction (1) The out-put wiring divides into the independent output and the public output. In not group, may use the different type and the voltage class output voltage. But can only use the identical type, the identical voltage class power source in the identical groups output. (2) Because the PLC output element is sealed on the print circuit wafer, and connects to the terminal strip, if will connect output elements load short circuit, will burn down the print circuit wafer, therefore, application fuse protection output element. (3)Uses when the relay outputs, withstands inductive loads size, will affect relays service life, therefore, time use inductive load the selective relay working life must be long. (4) The PLC output load possibly has the disturbance, must therefore take the measure to control, if direct-current outputs after flow guarantees protects, the exchange output anti- accommodates the absorbing circuit, the transistor and the bidirectional thruster output by-passed resistor protection.Third, outside security electric circuit to guarantee that the overall system can under the secure state the reliable work, avoids, because the external power supply breaks down, PLC to present the heavy economic loss which and the person casualty exceptionally, the disoperation as well as outputs by mistake creates, PLC the outside should install the essential protection circuit. (1) Stops the electric circuit anxiously. Regarding can cause the user to cause the damage the dangerous load, besides performs in the control procedure to consider, but also exterior should design the emergency stop electric circuit, causes when PLC breaks down, can cause the injury load power source reliably to shut off.(2)Fragment. The forward and reverse revolution and so on reversible operations control system must establish the exterior electric appliance interlock protection; the reciprocation moves and rises and falls motion the control system, must establish the exterior spacing protection circuit.(3)The programmable controller has self-checking functions and so on surveillance timer, when inspects exceptionally, outputs completely the closure. But when programmable controller CPU breakdown cannot control the output, therefore, regarding can cause the user to cause the damage the dangerous load, to guarantee that the equipment moves under the secure state, must design the external circuit to protect. (4) Power source load protection. If the PLC power source breaks down, the interruption interval is short in 10 seconds, PLC works not affected, if the power source interrupt surpasses 10 second or the power source drops surpasses the permissible value, then the PLC stop work, all output also separates; when the power source restores, if RUN input connection, then operates carries on automatically. Therefore, to establish the essential current limiting protection circuit to some easy over-loadings input device.(5) Significant breakdown warning and protection. Regarding easy to have heavy accidents place, to guarantee the control system when the heavy accident occurs still the reliable warning and the protection, should have with the significant breakdown the contacting signal to output through the external circuit, caused the control system to move under the safe condition.Fourth, PLC earth the good earth is guaranteed that the PLC reliable work the important condition, may avoid the heterogametic the voltage surge harm. PLC meets the grounding and machines ground terminal docking, meets the grounding the cross-sectional area should not to be smaller than 2mm2, the earth resistance is smaller than 100; If must use the expansion unit, its ground point should accept after checking with the elemental area earth in the same place. In order to suppress adds in the power source and the input end, out-ports disturbance, should joins the special-purpose grounding to PLC, the ground point should with the power equipment (for example electrical machinery) the ground point separate; If cannot meet this kind of requirements, must achieve with the other equipment public earth, forbids to establish contacts the earth with other equipment. The ground point should approach PLC as far as possible.Fifth, the redundant system and hot backup system in profession in and so on petroleum, chemical industry, metallurgy certain systems, the request control device has the extremely high reliability. If the control system breaks down, will create the production suspension, the raw material massive wastes or the equipment trouble, will create the enormous economic loss to the enterprise. But depends on the enhancement control system hardwares reliability to satisfy the above request is only not enough, because the PLC itself reliable enhancement has certain limit. Uses the redundant system or the hot backup system can solve the above problem quite effectively. (1) Redundancy control system in redundancy control system, entire PLC control system (or in system most important part, if the CPU module) of two set of identical system composition. Two CPU module use same user program multi-tasking, one is advocates CPU, another is spare CPU; advocates the CPU work, but the spare CPU output is forbidden, when advocates CPU breaks down, spare CPU automatic investment movement. This cut process is controlled by the redundancy processing unit RPU, the switching time in 13 scanning periods, the I/O systems cut is also completes by RPU.(2) Hot backup system in the hot backup system, two CPU with the communication connection connects in together, which is at circular telegram condition .When the system presents the breakdown, advocates CPU informs spare CPU to make the spare CPU work. This cut process is not too generally quick, but its structure is simpler than the redundant system.译文:PLC 在应用中应注意的问题PLC是专门为工业生产服务的控制装置,通常不需要采取什么措施,就可以直接在工业环境中使用。但是,当生产环境过于恶劣,电磁干扰特别强烈,或安装使用不当,都不能保证PLC的正常运行,因此在使用中应注意以下问题一、安装与布线1、 动力线、控制线以及PLC的电源线与I/O线应分别配线,隔离变压器与PLC与I/O之间应采用双胶线连接。2、 PLC应远离强干扰源如电焊机、大功率硅整流装置与大型动力设备,不能与高压电器安装在同一个开关柜内。3、 PLC的输入与输出最好分开走线,开关量与模拟量也要分开敷设。模拟量信号的传送应采用屏蔽线,屏蔽层应一端或两端接地,接地电阻应小于屏蔽层电阻的1/10。4、 PLC基本单元与扩展单元以及功能模块的连接线缆应单独敷设,以防止外界信号的干扰。5、 交流输出线与直流输出线不要用同一根电缆,输出线应尽量远离高压线与动力线,避免并行。二、I/O端的接线1、 输入接线(1)输入接线一般不要超过30米。但如果环境干扰较小,电压降不大时,输入接线可适当长些。(2)输入/输出线不能用同一根电缆,输入/输出线要分开。(3)尽可能采用常开触点形式连接到输入端,使编制的梯形图与继电器原理图一致,便于阅读。2 输出连接(1)输出端接线分为独立输出与公共输出。在不同组中,可采用不同类型与电压等级的输出电压。但在同一组中的输出只能用同一类型、同一电压等级的电源。(2)由于PLC的输出元件被封装在印制电路板上,并且连接至端子板,若将连接输出元件的负载短路,将烧毁印制电路板,因此,应用熔丝保护输出元件。(3)采用继电器输出时,所承受的电感性负载的大小,会影响到继电器的使用寿命,因此,使用电感性负载时选择继电器工作寿命要长。(4)PLC的输出负载可能产生干扰,因此要采取措施加以控制,如直流输出的续流管保护,交流输出的阻容吸收电路,晶体管及双向晶闸管输出的旁路电阻保护。三、外部安全电路为了确保整个系统能在安全状态下可靠工作,避免由于外部电源发生故障、PLC出现异常、误操作以及误输出造成的重大经济损失与人身伤亡事故,PLC外部应安装必要的保护电路。(1)急停电路。对于能使用户造成伤害的危险负载,除了在控制程序中加以考虑之外,还应设计外部紧急停车电路,使得PLC发生故障时,能将引起伤害的负载电源可靠切断。(2)保护电路。正反向运转等可逆操作的控制系统,要设置外部电器互锁保护;往复运行及升降移动的控制系统,要设置外部限位保护电路。(3)
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025江西赣州市市直医疗卫生单位及赣州市立医院招聘专业技术人员389人考前自测高频考点模拟试题附答案详解
- 安全培训教师工作手册课件
- 2025年4月浙江杭州高新区(滨江)教育系统直接考核招聘编外人员考前自测高频考点模拟试题及参考答案详解一套
- 小学安全协管员培训课件
- 2025河南新乡市拓晋科技中等专业学校招聘模拟试卷及完整答案详解一套
- 河北省【中职专业高考】2025年中职高考对口升学(理论考试)真题卷【交通运输大类】模拟练习
- 2025广西百色市平果市道路运输发展中心城镇公益性岗位人员招聘1人模拟试卷(含答案详解)
- 2025年三硼酸锂(LBO)晶体项目发展计划
- Glufosfamide-Standard-生命科学试剂-MCE
- 2025河南新乡市长垣市高章士学校招聘考前自测高频考点模拟试题及一套参考答案详解
- 2025年广东省中考地理试卷(含2025年答案及考点分析)
- 债务加入还款协议书
- 2025年中国热镀锡铜线数据监测报告
- 《纯电动汽车构造与检修》课件-任务2 比亚迪E5电机驱动系统构造与检修
- 2024年企业所得税年度纳税申报表(A类2017 年版2025年01月修订)-(2025 0323)
- 母女亲子断绝协议书范本
- 物联网导论(第四版)课件:感知技术
- 客户关系管理(CRM)系统项目总结报告范文
- 学校突发事件应急处置全套流程图(可编辑)
- 派单业务合同模版模板
- 印刷厂应急救援预案
评论
0/150
提交评论