IQC来料品质控制程序_第1页
IQC来料品质控制程序_第2页
IQC来料品质控制程序_第3页
IQC来料品质控制程序_第4页
IQC来料品质控制程序_第5页
已阅读5页,还剩4页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

惠州德高科技工業有限公司Techco Technology Industry (Huizhou) Co.,LtdV ”表示要簽署及分發的部門。 備註: 文件分發範圍內“”表示未簽署及分發的部門“此文件屬德高科技工業(惠州)有限公司受控文件,任何人非經許可,嚴禁私自影印及用於非工作用途.惠州德高科技工業有限公司Techco Technology Industry (Huizhou) Co.,Ltd1.Purpose目的 This document provides the standard procedure for the quality control of incoming material.此程序為來料品質管理的一個標准程序。2.Scope范圍:This procedure is applicable to all incoming direct and some indirect production materials in our factory.此程序適用於我們工廠的所有直接物料和部分間接物料。3.Definition定義:3.1 RMT- Receiving Material Ticket收貨單3.2 IMDR-Incoming Material Discrepancy Report來料不合格報告3.3 RTV- Return To Vendor退回供應商3.4 MRB- Material Review Board物料評審會議3.5 UAI-Use As Its讓步接受3.6 SER-Sample Evaluation Report樣品評估報告3.7 RIT- Re-Inspection Ticket復檢標簽4.Reference參考文件:4.1 IQC Sampling Plan IQC抽樣計劃4.2 Non-conforming Control Procedure 不合格物料管控程序4.3 Corrective and Preventive Action Procedure 矯正預防措施程序5.Responsibility職責:5.1 ST 倉庫Responsible to receive the material, check the contents, storage, transfer, issue material and informing IQC to check. 負責收貨點數,貯存,搬運,發放並通知IQC檢驗。5.2 IQC5.2.1 According to IQC Sampling Plan, inspect the incoming material to ensure the material meets the specified standard & requirement as defined in SER and/or IQC Inspection Instruction.根據IQC的抽樣計劃,檢查來料,確保物料滿足SER和IQC檢驗指導書的指定標准和要求。5.2.2 Call MRB meeting if necessary, and follow up the related actions.必要的時候召開MRB會議,並跟蹤相關行動。5.3 PMC物管部:Plan material and follow up the status of material for each Job Order.計劃物料並跟蹤物料狀況。5.4 PUR:此文件屬德高科技工業(惠州)有限公司受控文件,任何人非經許可,嚴禁私自影印及用於非工作用途.惠州德高科技工業有限公司Techco Technology Industry (Huizhou) Co.,LtdPurchase material and follow up the status of material for each Job Order.采購物料,並跟蹤物料狀況。5.5 SQEMake IQC inspection instruction. Requesting supplier to improve the quality, if necessary.IQC檢驗指導書的制作,必要的時候,反饋供應商改善品質。5.6 SAResponsible to request customer to submit the sample, specification, drawing, test tools and so on.向客戶申請樣品,規格書,圖紙,治具等。5.7 Engineering工程部:5.7.1 Prepare the specification and test tools for incoming material;為來料准備規格書,測試治具。5.7.2 Prepare the guidance of “Rework/ Sort” if necessary.必要的時候提供“重工/挑選”指引。6.Procedure程序:6.1 Receiving Material Ticket收貨單6.1.1When the material arrives at TC, ST will check the contents, quantity and etc, if ok, ST will affix the identification label to the package and fill in RMT.當物料來到德高倉庫後,確認物料,檢查數量等。如果沒問題,倉庫將在包裝上附上相關標簽,並填寫在收貨單上。6.1.2 ST (IQC, SP, if necessary) check the Model, P/N, description/ specification, box number, check the contents, vendorand banner and so on. Make sure the material match the Receipt number. And take the material to the area for inspection.ST(必要時由IQC、船務部協同) 驗証物料所屬机种、物料編號 (P/N)、物料名稱/規格、箱號、數量、供方和標簽等,确保物料与上料單有關資料一致,并將點收合格的物料放置待檢區.6.1.3 ST need to dispart RoHS and no-RoHS materialspecially, management the chemical by marking.尤其要區分開RoHS, no-RoHS物料,對化學品物料要進行化學品標示管理6.1.4 ST take thematerial discrepancy reportto PMC/SA /PUR/SQE,PMC/SA/PUR contact the customer or vendor to deal with the material when the material not match the Receipt number.當物料与上料單有關資料不相符時,貨倉作成 顧客提供物料差异報告 報PMC/SA/PUR,PMC/SA与顧客聯絡作出處理;當采購物料与送貨單不相符時,由PUR与供方聯絡處理。6.1.5 ST will notify IQC by RMT.倉庫將用物料接收單通知IQC.6.2 Take sample and inspection抽樣和檢查:6.2.1 IQC according related request (according the customer request if customer request specially) to sample and inspect after receiving the RMT or RIT. The material should store at the area wait to inspect at ST Pb or No Pb area. If ST not mark the Pb or No Pb IQC can not to sample and inspect. IQC sample the material to the related area to inspect. 此文件屬德高科技工業(惠州)有限公司受控文件,任何人非經許可,嚴禁私自影印及用於非工作用途.惠州德高科技工業有限公司Techco Technology Industry (Huizhou) Co.,LtdIQC接到貨倉部的物料接收單或是重檢單后,組織檢驗員按有關規定進行抽樣(有客戶特殊要求的,按客戶要求執行)。這些物料暫放于貨倉有鉛/無鉛待檢區,由貨倉貼上相應有鉛/無鉛標示后IQC才可抽取樣品檢驗.IQC 抽取樣品到相關區檢驗。6.2.2 Inspector inspect the material according thesample, BOM, drawing, work instruction and so on.Inspect and mark the RoHS dispart from no-RoHS. Check the chemical at special area in store.Use it for try if necessary.檢驗員將抽取的樣品按相關的樣板、BOM、圖紙、作業指導書、環境要求等相關資料進行檢驗; 對RoHS,no-RoHS物料分開檢查, 分別標示; 化學品物料在倉庫化學品專管區進行驗證, 必要時進行試用驗證.6.2.3 Sample size and accept level: AQL 0.4 C=0. Seesattachment.抽樣水准和判定水准:AQL 0.4 C=0. 如附件。6.2.4 Samples should be randomly selected from the lot, and should be inspected according to SER and/or IQC Inspection Instruction.樣品應該是隨機抽取,並且根據SER和IQC檢查指導書檢查。6.3Inspecton Result Record記錄檢查結果6.3.1 The inspection result must be checked by IQCleader or superior. If the result is NG, it must be checked by superior.檢驗完成后,報IQC組長或主管人員确認.不合格物料要經IQC主管人員确認。6.3.2 The inspection result should be recorded in the “IQC Inspection Report”, and register it in “Incoming Material Inspection Summary”.檢查結果應該記錄在“IQC檢驗報表”,並記錄到“來料檢查總表”中。6.3.3 IQC management the incoming material inspectionresult well.IQC妥善保存來料檢驗相關記錄.6.4 Disposition執行:6.4.1 If the lot is accepted, “IQC PASSED” stamp should be stamped on each box /package of the material.如果該批次被接收,每個箱子或是包裝上都應該蓋上“IQC PASSED”印章。6.4.2 If the lot is rejected, “NG” flag/ banner should be affixed on each box / package of the material.如果拒收,每個箱子或是包裝上都應該貼上“不良”標簽6.4.3 If the lot is disposed through MRB, relative MRB label should be used. 如果通過MRB討論可有條件接受,相關的MRB標簽應該貼上。6.4.4 For the problematic lot which is rejected by IQC, IQC should inform SQE/PMC/PUR/SA by IMDR.Then, PMC evaluation the plan and sent the result to SQE/ST/IQC/PUR/SA.如果不良批被IQC拒收,IQC應該以IMDR通知SQE/ST/PMC/PUR/SA。然後PMC評估計劃後,再通知到此文件屬德高科技工業(惠州)有限公司受控文件,任何人非經許可,嚴禁私自影印及用於非工作用途.惠州德高科技工業有限公司Techco Technology Industry (Huizhou) Co.,LtdSQE/ST/IQC/PUR/SA。 6.4 5 IQC pass the OK material report to ST receiving team, receiving team transfer the OK material to store.IQC 將合格物料的檢驗單的相關聯交貨倉部收料組,收料組辦理合格物料入庫。6.4.6 Feedback the incoming material NG information來料不合格的信息反饋Customer consign material, SQE inform SA, SA contact with customer and get the customer approve to return the material orrework/sorting/UAI (If no function defect and urgent input,defect will be full eliminated by easy sort/rework). For open source, PUR contact to supplier to return the material in time. SQE issue 8D to customer or supplier, and request them to take action to improve, if necessary.對于客供料,由SQE通知SA,SA反饋客戶,得到客戶承認是退貨或是經客人同意加工挑選或特采(沒有功能不良,生產急需使用, 經簡單加工/挑選即可完全消除不良缺陷)對于公司采購的物料,采購部及時反饋供方取得退貨處理方法。必要的時候SQE發放8D要求供方改善。6.5Re-inspection of Overdue Material: 過期物料的重檢:6.5.1 For materials that have been stored for over 6 months after the initial incoming inspection, re-inspection is required. 如果來料儲存超過6個月,必需重檢。6.5.2 This is to avoid using those materials which have been oxidized, corroded, contaminated or discolored during their storage period. 這是為了避免使用這些在儲存期間有氧化,腐蝕,污染或是褪色的物料。6.5.3 Store should notify IQC of re-inspecting the materials by Re-inspection Ticket (RIT), IQC conduct sampling check again. 倉庫應該以RIT通知IQC重檢物料,IQC按抽樣要求重檢。6.5.4 PMC/PUR/SA should well plan & schedule material so that the material will be stored for less than 12 months. PMC/PUR/SA的物料排程應使物料的儲存不超過12個月。6.5.5 The effect time of the IQC PASSED is 6 months . PD should not accept material which has been stored for over the effect time(over 6 months).IQC PASSED 的有效期為6個月,生產不接受超過IQC檢驗有效期(超過6個月)的物料。6.6 Incoming quality monitoring:來料品質監控:6.6.1 IQC(SQE) should complete “Supplier Performance Record” every month basing on the incoming quality; refer to “Supplier Evaluation Procedure”.IQC(SQE)應該根據來料品質,每月完成“供

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论