




已阅读5页,还剩9页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:1 of 12Manufacturing and Examination Procedure制 造 和 检 验 程 序 Prepared by Date _ 编 制: 日期: Approved by _Date _ 批 准: 日期: Accepted by _Date _ 认 可: 日期:Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:2 of 121Scope 范围1.1This procedure establishes the inspection, testing and examination requirements during the fabrication process of pressure vessels which constructed to the ASME Code Section,B31.1and VIII Div.1. 本程序在锅炉/压力容器的制造过程中,规定了检验、测试和检验要求, 满足ASME规范第卷,B31.1和第卷第分册。1.2The manufacturing process mentioned in this procedures including material preparation (cutting, edge preparation, machining), forming, welding and final testing, etc. The inspection mentioned in this procedure mainly means the visual inspection and dimensional measuring check. 在本过程中提及的制造过程,包括材料准备(切割、边缘整理、机加工),成型、焊接和最后测试等。在本过程中提及的检验主要地意味着目测和尺寸测量检测。2Responsibility: 责任2.1The QC Manager shall be responsible to train and qualify the Examiners who engaged in the manufacturing process inspection on pressure vessels, and shall control the quality. 质量管理经理应负责培训和考试检验员,以便他在压力容器上,从事制造过程的检验,并控制产品质量。2.2 The Examiner shall conduct inspection and examination based on the items listed in Process Check List (PCL), procedures and the applicable Code Section requirements.检验员应基于在PCL、程序和所应用的规范要求上列出的条款执行检验和测试。2.3 After inspection, Examiner shall record the results in the “Inspection and Examination Record” forms and keep them in file.在检验之后,检查员应将检验结果记录在”检验记录表”里并将它们保存在档案里。2.4 Any unacceptable items or quality related problems found during the inspection shall be handled as nonconformity.在检验过程中,任何不合格的产品或发现质量相关的问题应按照不符合项来处理。3Preparation for Inspection 检验前的准备Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:3 of 123.1Examiner shall have an annual vision test. 检验员定期进行视力测试。3.2Direct visual examination may be conducted when the parts can be examined at an angle not less than 30 degree. Mirrors may be used to assist examination when deemed necessary. 当部件能被在一个不低于30度时检测,直接的视力检验应被执行。当认为必要时,镜子应被帮助来检验。3.3The material, part, component etc. under visual examination shall be sufficiently illuminated. Flashlight or other auxiliary lighting devices shall be employed is necessary. 材料、部件、零件等,在视力检验下应足够地照明,必要时,闪光灯或其它辅助照明设备应被使用。3.4 In some cases, remote visual examination may have to be substituted for direct examination. Remote visual examination may use visual aids such as mirrors, telescopes, borescopes, fiber optics, cameras, or other suitable instruments. Such systems shall have a resolution capability at least equivalent to that obtainable by direct observation. 在一些情况下,远程的视力检验可能不得不代替直接检验。远程的视力检验可以使用视力辅助工具,如镜子、望远镜、管道镜、纤维光学镜、照相机、或其它适当的工具。像这样的体系应有解决能力至少等于直接观察获得的。3.5All the examined surfaces shall be clean. Irregular shapes covering and mixing surface defects shall be washed away. 所有被检验的表面应被清理。不规则的遮盖物和混合表面的缺陷应被清除。4Inspection during Material Cutting 在材料切割时检验4.1After lay-out but before cutting, the Examiner shall verify and examine the accurate transfer of Material Coded Mark. 在划线切割之前,检验员应确认材料编号标识被准确地进行了移植。4.2When plates, components, and other parts, may be cut to shape and size by oxygen or arc cutting for carbon and low alloy steel and by plasma cutting machine for austenitic stainless steel. After cutting, the edges to be welded shall be uniform and smooth and shall be free of all loose scale and slag accumulations before welding. The detrimental discoloration of material which has been molten shall be removed prior to further fabrication or use. 钢板、零件和其它部件应用氧或电弧切割碳钢和低合金钢成型和尺寸,用等离子机切割奥氏体不锈钢。在切割后,所有的熔渣和已经被熔化的有害的变色材料应在深度加工或使用之前移除。Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:4of 124.3Ends of nozzles or manhole necks which are to remain unwelded in the completed vessel may be cut by shearing provided sufficient additional material is removed by any other method that produces a smooth finish. Exposed inside edges shall be chamfered or rounded. 倘若用其它的方法能够去除足够的额外添加的材料,以使成品的表面光滑,那么,在完成的容器中,不需要焊接的管口端或检修孔管颈可以用修剪的办法去除。精整地镀铴薄板。暴露在外的内部边缘应被斜切或磨圆。4.4The Examiner shall examine the shapes and dimensions of cut parts by steel ruler, band tape or model. 检验员应用钢尺、卷尺或模子,检查切割部件的形状和尺寸。4.5 Cutting edge of being cut parts shall be examined by direct visual examination or by magnifying glass when deemed necessary in order to disclose possible lamination, shearing crackle, or other defects. 认为必要时,为了揭露可能得迭片结构,被切割的部件的切割边缘应被检验通过直接目测检验或放大镜、剪切裂纹 或其它的缺陷。5Forming Examination 成型检验5.1If the plates are to be rolled, the adjoining edges of longitudinal joints of cylindrical vessels shall first be shaped to the proper curvature by preliminary rolling or forming in order to avoid having objectionable flat spots along the completed joints. 如果要滚轧钢板,圆柱容器的纵缝连接的相邻边应先被预先滚轧成形,以具有适当的曲率。这样可以避免完成的焊缝周围有不必要的、未弯曲的部分。5.2The shell of an internal pressure vessel shall be substantially round. The difference between the maximum and minimum inside diameters at any cross section shall not exceed 1% of the nominal diameter at the cross section under consideration. 内部压力容器的壳应被充分地弄成圆形。在任何横截面,最大与最小的内径差异都不应超过在考虑中的横截面的直径的1%。When the cross section passes through an opening or within 1 ID of an opening or within 1ID of the opening measured from the center of the opening, the permissible difference in inside diameters given above, may be increased by 2% of the inside diameter of the opening. Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:5of 12当横截面通过一个开口,或从开口的中心测量,该横截面在一个开口的1ID范围内,在以上给出的内部直径的允许公差范围可能会变大,变大范围为开口内部直径的2%。When the cross section passes through any other location normal to the axis of the vessel, including head to shell junctions, the difference in diameters shall not exceed 1 %. For vessels with longitudinal lap joints, the permissible difference in inside diameters may be increased by the nominal plate thickness. Roundness measurement shall be completed inside vessels, and be vertical to the rolling shaft by special gauge, instrument steel rule, band tape, caliber etc. Each shell shall be examined at least in three cross sections, two at ends and one at midst section.对于有纵向焊接缝的容器,内部直径可能会不同,这种不同可能随钢板的正常厚度而增加。圆度测量应该在容器内部完成,并且与辊轴垂直。可采用特殊标准尺、钢尺、卷尺和卡尺等测量。至少在三处横截面处检验每一壳体,两处分别在两端,一处在中部。5.3The shell of a completed vessel to operate under external pressure shall not exceed the out-of-roundness limitation described in paragraph 5.2 and maximum plus-or-minus deviation from the true circle form, measured radially on the outside or inside of the vessel, shall not exceed the maximum permissible deviation obtained from Fig. UG-80.1. 在外部压力下工作的完整的容器的壳体,变形程度不应超过5.2中描述的限制。通过测量容器外部或内部半径所得的、其偏离圆环形状的最大值,不应超过图UG-80.1中的可允许最大偏离值。5.4The inner surface of a torispherical , hemispherical, or ellipsoidal head shall not deviate outside of the specified shape by more than 1-1/4 % of D nor inside the specified shape by more than 5/8 % of D, where D is the nominal inside diameter of vessel shell at the point of attachment. The knuckle radius shall not be less than that specified. The deviation shall be measured perpendicular to the specified shape and shall not be abrupt.准球、半球或椭球体的接头,大于规定外形的量不超过直径的1-1/4%,小于规定外形的量不超过直径的5/8%。此处直径指容器壳体在附件连接处的正常内部直径。接头范围不得少于规定。应垂直于规定外形测量偏离值,该偏离值不应是突变的。5.5 Hemispherical heads or any spherical portion of a torispherical or ellipsoidal head designated for external pressure shall, in addition to satisfying the requirements of paragraph 5.4, meet the tolerance specified for spheres in UG-80(b) using a value of 0.5 for L/D0.为外部压力设计的半球状接头,或准球、椭球体的接头的任意球状部分,除满足5.4中的要求外,应为L/D0使用0.5的值,满足UG-80(b)中规定的球体的容许公差。Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:6of 125.6The skirt of heads shall be sufficiently true to round so that the difference between the max. and min. inside diameter shall not exceed 1 % of the normal diameter.5.7 The marks on the cylindrical shell and heads shall be examined after formation to make sure they are clear. 在柱形壳上和接头上的标志应被在成型之后进行检验以确认它们清楚。6Machining Examination 机加检验6.1Examiner shall attach material identification tag or make marking on all machined parts. 检验员应贴上材料识别标签或在所有机加部件上做记号。6.2The shape, dimensions of being machined parts shall be measured by straightedge, caliper, caliber, angle square etc. 机加部件的形状和尺寸应用直尺、卡钳、卡尺、角尺等测量。6.3Examining for the roughness of the being machined surfaces shall be carried out by surface roughness measuring devices. 机加表面的粗糙程度的检验应用表面粗糙程度测量仪器实施。6.4For screw parts, examined by closing screw (ring screw gauge, screw plug gauge) etc. 对于螺丝零件,用螺纹规检验(环头螺纹规,螺旋塞规)等。7Fabrication Process Examination 制作过程检验7.1Alignment of sections at edges to be butt welded shall be checked, the maximum offset is not greater than applicable amount for the weld joint category under consideration as listed in Table 1. The section thickness t is the normal thickness of the thinner section at the joint. 对于对接焊缝边缘的截面线形应被检查最大的偏移量不大于在考虑中的焊缝种类的应用量(见表1)。截面厚度是在接缝处叫薄截面的公称厚度。Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:7of 12Table 1 Maximum Alignment Tolerance for Butt-weld表1 对接焊缝最大错边量公差Section Thickness截面厚度Joint Categories 接缝种类in. A B C and D至Up to 1/2,incl1/4t1/4t超过Over 1/2 to 3/4, incl1/8 in (3mm) 1/4t 超过over 3/4 to 1.5,incl1/8 in(3mm)3/16 in. (5mm)超过over 1.5 to 2,incl1/8 in (3mm)1/8 t 超过Over 2 lesser of 1/16 t or 3/8 in (10mm)较小的lesser of 1/8 t or 3/4in (19mm)较小的7.2 Any offset within the allowable tolerance provided above shall be faired at a three to one taper over the width of the finished weld or if necessary by adding additional weld metal beyond what would other wise be the edge of the weld. Such additional weld metal build up shall be subject to the requirement of following :在上述允许公差范围内的偏移量,可以在完成的焊接的宽处按照3比1的锥度使其成为流线型,或如有必要,可在焊接的边缘添加额外的焊接金属。额外焊接金属的喷镀应符合下述要求。a) A butt welding procedure qualification in accordance with provision of ASME Section IX must be performed for the thickness of weld metal deposited, prior to production welding. 在产品焊接前,应对喷镀的焊接金属的厚度进行符合ASME第IX卷条款的对接焊程序的质检。b) All weld metal buildup must be examined the full surface of the deposit by liquid penetrate examination to the requirements ASME Code Section VIII, Division 1.所有喷镀的焊接金属的都应按照ASME第VIII、第1分册的要求,用液体渗透检验的方法检验其喷镀表面。c) When such surface weld metal buildup is used in welded joints which require full or spot radiographic examination, the weld metal buildup shall be included in the examination.如果在要求全部或定点X光检验的焊缝处使用表面焊接金属喷镀,该焊接金属喷镀也应被包括在检验。7.3A tapered transitive having a length not less than three times of the offset between the adjacent Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:8of 12surfaces of abutting section shall be provided at joints between sections that differ in thickness by more than 1/4 of the thickness of the thinner or by more then 1/8 in .在厚度不同的截面间(厚度的不同大于薄者的1/4,或大于1/8英寸)的焊缝,应提供锥形过渡。其长度不少于临近截面的相邻表面偏移量的3倍。7.4Except when the joints are examined by RT for 4 in. on each side of circumferential welded intersection, vessels made up of two or more course shall have the centers of the welded longitudinal joints of adjacent course staggered or separated by a distance of at least five (5) times thickness of the thicker plate.除非X光检验的每一边的圆周焊接横截面焊接缝为4英寸,否则,在由两个或多个部分构成的容器中,相邻部分的纵向焊接的中心点应被错开或分开,距离至少是较厚钢板厚度的5倍。7.5All lugs, brackets, saddle type nozzles, manhole frames, reinforcement around openings, and other appurtenances shall be formed and fitted to conform reasonably to the shell surface to which they are attached when pressure parts extend over pressure retaining welds, such welds shall be ground flash for the portion of the weld to be covered. 当壳体的压力部件超出保持压力的焊接时,这种焊接需要覆盖的部分应接地、用火花处理。所有的接线片、鞍形管口、检修孔铁口框架、开口周围的加固和其他附属物,应该合理地成形加工和安装,以适合它们所安装的壳体表面。7.6Fabricate dimensions and shapes shall be examined by template.用模板检验制造尺寸和外形。7.7The surface to be welded shall be clean and free to scale, rust, oil, grease or other deleterious foreign material. The cleaning distance from the edge of welding joint shall be at least 1 in. (25 mm) for ferrous metal and 2 in. (50 mm) for non-ferrous metals.将要进行焊接的表面应干净,无剥落、生锈、机油、油脂或其他损害性外界物质。从焊缝的边缘算起,对于铁类金属,清洁范围不少于1英寸(25毫米),非铁类金属不少于2英寸(50毫米)。8Welding Process Examination 焊接过程检验8.1Examiner shall examine the surface cleanness of being welded parts. 检验员应检验将被焊接部分表面的清洁度。8.2Examiner shall verify the correct WPS as specified by the drawing has been available and all welders have been qualified. 检验员应核实制图规定的正确的WPS是否可以得到利用,并检验所有的焊接工是否合格。Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:9of 128.3Tack weld shall be carried out by the qualified welders following the qualified WPS used for production welding. Tack weld shall be at least 1/2 in. (13mm) in length at the interval of not longer than 16 in. (400 mm). 预焊应由合格的焊接工按照针对产品焊接的合格WPS进行。预焊的长度至少为2/1英寸(13毫米),间距不长于16英寸(400毫米)。8.4Prior to welding, the groove surface shall be cleaned for a distance of at least 1 in. (25 mm) from the welding joint edge. The welding joint shall be preheated by either torch or electrical method to the specified temperature with a range of 3 in. (75 mm) from the welding joint. It is recommended that the welding can not be done when the temperature of base metal is lower than 0 F (-20 C). At temperatures between 32 F (0 C) and 0 F (-20 C), the surface of all areas within 3 in. (75 mm) of the point where a weld is to be started should be heated to a temperature above 60 F (15 C) before welding is started. It is recommended also that no welding be done when surface are wet. The preheated temperature shall be checked by the thermometer. 焊接前,从焊缝边缘算起,至少1英寸(25毫米)之内的表面纹路都应被清洁。焊缝周围3英寸(75毫米)之内的范围应用焊炬或其他工具预热到规定温度。当壳体金属温度低于华氏0 F (摄氏-20 C)时,推荐不要进行焊接。温度在华氏32 F (摄氏0 C) 和0 F (-20 C)之间时,焊缝周围3英寸(75毫米)范围内所有表面应预热至华氏60 F (15 C)以上。当表面是湿的时,推荐不要进行焊接。应用温度计检查预热温度。 8.5 The Shop Supervisor shall assign the experienced and qualified welders to perform welding. He shall issue qualified WPS and Material Delivery Card to the welder to receive the welding consumables. During welding, Shop Supervisor shall spot monitor the welding operation of welder on the Code Item. 车间主管应安排有经验和资格的焊工实施焊接。他应发放合格的WPS和材料交付卡给焊工以便得到焊材。在焊接过程中,车间主管应现场监督焊工按照规范实施焊接。8.6Butt welded joints shall have complete penetration and full fusion. As welded surface are permitted, the surface of welds shall be sufficiently free from coarse ripples, grooves, overlaps and abrupt ridges and valleys. The reduction in thickness due to the welding process is acceptable provided all of the following conditions are met. 对接焊缝节点应完全融合和焊透。当焊接表面被容许时,焊接表面应充分摆脱粗糙的波纹、凹槽、交迭、突然的垄起和凹谷。倘若所有的以下过程被满足,由于焊接过程,厚度的降低是可以接受的。a) The reduction in thickness shall be not reduced the materials of the adjoining surfaces below Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:10of12 the minimum required thickness at any point.焊缝的高度不应低于相连接的母材的表面,并且在任何时候均不得低于计算的最小厚度值。b) The reduction in thickness shall be not exceeded 1/32 in.(1.0MM) or 10% of the nominal thickness of the adjoining surface, whichever is less. 厚度的降低不能超过1/32 in.或临近表面公称厚度的10%,无论那个更小。8.7 In making fillet welds, the weld metal shall be deposited in such a way that adequate penetration into the base metal at the root of the weld is secured. The reduction on the base metal due to the welding process at the edges of the fillet weld shall meet the same requirements as for butt welds. 在进行角焊时,焊接金属应使用如下方法处置,充分地渗透进贱金属直至焊接的底部才是安全。在贱金属上的减少,由于在角焊的边缘过程中,应满足象对接焊缝的同样要求。8.8 To assure the weld grooves are completely filled, the surface of the weld metal at any point does not fall below the surface of the adjoining base material, weld metal may be added as reinforce on each face of the weld. The thickness of the weld reinforcement on each face shall not exceed the following: 为保证焊接槽完全被填充,焊接金属表面的任何部分都不应低于相邻壳体材料的表面,可添加焊接金属,作为焊接每一面的加固。每一面焊接加固的厚度不应超过下面规定:Table 2 Maximum Reinforcement for Pressure Vessel表2 压力容器焊缝的最大加强高Maximum Reinforcement (mm) 最大加固 (mm)Material thickness (mm)材料厚度Category A & B Butt Welds种类 A和B对接焊Other Welds其它焊接Less than 2.4低于 2.42.40.82.4 to 4.8, incl.3.21.6Over 4.8 to 13, incl.4.02.4Over 13 to 25 , incl.4.82.4Over 25 to 51, incl.53.2Over 51 to 76, incl.64Over 76 to 102, incl.66Over 102 to 127, incl.66Over 12788Zhenjiang JinMen Industrial Co., LtdASME ProceduresJM/ASME-07Manufacturing and Examination ProcedureRev. No.: 0.0Page:11of 128.9The reverse side of double-welded joints shall be prepared by chipping, grinding, or melting out, to secure sound metal at the base of weld metal first deposited, before applying weld metal from the reverse side. 在从反面焊接应用焊接金属之前,双重焊接的反面应由切屑、打磨或熔化应被准备以便使优质金属在以先处理的焊接金属为基础上时安全。8.10When the shell, head and other pressure part are to be welded to a flat plate thicker than 1/2 in. to form a corner joint under the provision of
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年成都市事业单位公开招聘工作人员(第三批)(1044人)模拟试卷附答案详解(完整版)
- 2025年甘肃省天水市第四人民医院招聘编外人员模拟试卷及完整答案详解一套
- 2025年苏州市相城区教育系统公开招聘事业编制教师66人模拟试卷及答案详解(新)
- 2025年福建省福州市少年儿童图书馆招聘3人考前自测高频考点模拟试题及完整答案详解一套
- 2025河南民航发展投资集团有限公司招聘28人考前自测高频考点模拟试题及答案详解(名校卷)
- 2025河南郑州高新区双桥社区卫生服务中心招聘3人模拟试卷附答案详解(典型题)
- 2025湖南岳阳市平江县事业单位第一批公开选调工作人员模拟试卷及参考答案详解一套
- 2025河北省人民医院招聘模拟试卷及1套完整答案详解
- 班组安全培训矩阵课件
- 2025年上海复旦大学附属浦东实验学校教师招聘考前自测高频考点模拟试题含答案详解
- 2025公需课《人工智能赋能制造业高质量发展》试题及答案
- 店铺转让分期协议书
- 呼吸机撤离与拔管流程标准化指南
- 国家职业技能标准 保育师
- 个人借款分期还款协议范本8篇
- 消防法律知识培训课件
- 小学生防电信诈骗课件
- 《玻璃纤维湿法制品》课件
- 朝花夕拾中父亲的病
- DB63T 2374-2024 微型消防站建设管理
- 新版质量管理体系标准之组织的知识
评论
0/150
提交评论