




已阅读5页,还剩48页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of附录A: 复测、分坑、验槽及杆塔号对照表 Q/CSG表1-A.1路径复测记录表(线记1) 工程编号: Q/CSG表1-A.1 设计桩号杆塔 型式档 距m线 路 转 角塔位高程m直线桩横线路偏移mm备注设计值实测值偏差值设计值实测值方向偏移值备注1.请注明直线转角。2.仪器名称: 仪器编号: 检验证书号: 监理: 质检员: 施工负责人: 检查人: Q/CSG表1-A.2被跨越物及地形凸起点测量记录表(线记2)工程编号: Q/CSG表 1-A.2 跨越档档 距m被 跨 越 物(或地形凸起点)名 称高 程m与 邻 近 桩 位最 近 距 离备注设计桩位距离m 监理: 质检员: 施工负责人: 检查人:为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation strong library solid di spread row engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play three to split battle. Xia Baolong, Secretary of provincial party Committee stressed that while the three to split operation time is over three years, but three to split must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and no unauthorised created1 Q/CSG表1-A.3普通 (掏挖) 基础和拉线基础分坑及开挖检查记录表(线记3)设计桩号杆塔型基础型施工日期年 月 日呼称高施工基面检查日期年 月 日序号检查项目允许偏差检查结果备注1转角杆塔角度设计值01302直线杆塔桩位置 mm横线路:503基础根开及对角线尺寸mm设计值ABBCCD ABBCACDABDCDDA2ACBD4基础坑深mm设计值:AB100,50CD5基础坑底板断面尺寸mm设计值:AB1%CD6拉线基础坑位置mm设计值:ACE1%LBDF7拉线基础坑深mm设计值:AB C+100,不允许有负偏差DEF8拉线坑马道坡度及方向符合设计要求ABCDEF备注1. L为拉线基础坑中心至拉线固定总水平的距离。2. 仪器名称: 仪器编号: 检验证书号:3. 掏挖基础的尺寸不允许有负偏差。工程编号: Q/CSG表1-A.3 监理: 质检员: 施工负责人: 检查人: Q/CSG表1- A.4 地基基坑(槽)检查记录表(线记4)工程编号: Q/CSG表1- A.4 设计桩号杆塔型基础型施工日期 年 月 日呼称高施工基面检查日期 年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果评定1基坑(槽)底土质类别关键符合设计要求ABCD2地质基坑草图:施工单位代表: 年 月 日3监理鉴定意见:监理代表: 年 月 日设计核查意见:设计代表: 年 月 日备注设计有验槽要求的基础填写本表。 监理: 质检员: 施工负责人: 检查人:Q/CSG表1- A.5杆塔号对照表(线记5)工程编号: Q/CSG表1- A.5 运行线路名称线路设计名称(标段)起止杆塔设计桩号起止杆塔运行塔号杆塔数量运行塔号所在塔情况回路情况运行塔号所在塔情况回路情况监理负责人:技术负责人:填写日期 年 月 日备注1. 所在塔情况:按实际情况,新建塔的填写设计桩号;利用旧塔的填写原线路名称及塔号。2. 回路情况:按实际情况,填写在多回路塔上运行线路所用的实际回路。附录B: 架空输电线路工程 分项工程质量验收记录表【W001】Q/CSG表1- B.01路径复测 分项工程质量验收记录 (线土1) 工程编号: Q/CSG表1- B.01 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1转角桩角度关键设计值:1302档距La重要设计值:13被跨越物高程m关键设计值:0.54杆(塔)位高程m关键设计值:0.55地形凸起点高程m关键设计值:0.56直线桩横线路方向偏差mm关键设计值:507被跨越物与邻近杆(塔)位距离L重要设计值:18地形凸起点b、风偏危险点与邻近杆(塔)位距离L重要设计值:1监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注a L为档距,L为被跨越物或地形凸起点、风偏危险点与邻近杆(塔)位的水平距离。b 地形凸起点是指地形变化较大,导线对地距离有可能不够的地形凸起点。 【H001】 Q/CSG表1- B.02普通基础分坑与开挖 分项工程质量验收记录(线土2)工程编号: Q/CSG表1- B.02 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1基础根开及对角线尺寸mm关键设计值:AB: BC: CD: DA:AC: BD:AB:BC:2CD:DA:AC:BD:2基础坑深mm关键设计值:100503基础坑底板尺寸重要设计值:1监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注【H002】Q/CSG表1- B.03拉线基础分坑与开挖 分项工程质量验收记录(线土3 )工程编号: Q/CSG表1- B.03 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值1拉线基础坑位置La关键设计值:12拉线基础坑深度mm关键设计值:100,不允许有负偏差3马道坡度及方向重要符合设计要求监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注a L为拉线坑中心至拉线挂点的水平距离。【H003】Q/CSG表1- B.04岩石、掏挖基础分坑与开挖 分项工程质量验收记录(线土4) 工程编号: Q/CSG表1- B.04 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1基础根开及对角线尺寸mm关键设计值AB: BC:CD: DA:AC: BD:AB:BC:CD:DA:10.7BD:AC:2基础坑深mm关键设计值:不小于设计值3基础坑底板尺寸重要设计值:不小于设计值4基础立柱尺寸重要设计值:10.7监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注Q/CSG表1- B.05施工基面及电气开方 分项工程质量验收记录(线土5)工程编号: Q/CSG表1- B.05 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1施工基面高程mm关键设计值:200,100140,702塔位边坡净值关键设计值:不小于设计值3风偏及对地净值重要设计值:不小于设计值监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注 【S001】 Q/CSG表1- B.1现浇、掏挖(等高)铁塔基础 分项工程质量验收记录 (线基1) 工程编号: Q/CSG表1- B.1 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地脚螺栓规格、数量关键设计值:符合设计要求2主钢筋规格、数量关键设计值:符合设计要求3混凝土强度关键设计值:试块强度: MPa试验报告编号:不小于设计值4立柱断面尺寸mm重要设计值:1%0.7%5底层(掏挖)断面尺寸mm重要设计值:1%6基础埋深mm重要设计值:100,50100,07钢筋保护层厚度mm重要58整基基础中心位移mm顺线路重要3021横线路30219整基基础扭转一般塔重要107高塔5410回填土重要符合GB502332005第4.0.7-4.0.10条规定11同组地脚螺栓中心与立柱中心偏移 mm一般1012基础顶面高差mm一般513基础根开及对角线尺寸mm设计值一般AB: BC:CD: DA:AC: BD:AB:BC:一般塔21.4CD:DA:高塔0.70.5AC:BD:14混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注掏挖基础的尺寸不允许有负偏差。【S001】Q/CSG表1- B.2 现浇、掏挖(不等高)铁塔基础 分项工程质量验收记录 (线基2)工程编号: Q/CSG表1- B.2 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地脚螺栓规格、数量关键设计值:符合设计要求2主钢筋规格、数量关键设计值:符合设计要求3混凝土强度关键设计值:试块强度: MPa试验报告编号:不小于设计值4立柱断面尺寸mm重要设计值:1%0.7%5底层(掏挖)断面尺寸mm重要设计值:1%6基础埋深mm重要设计值:100,50100,07钢筋保护层厚度mm重要58整基基础中心位移mm顺线路重要3021横线路30219整基基础扭转一般塔重要107高塔5410回填土重要符合GB502332005第4.0.7-4.0.10条规定11同组地脚螺栓中心与立柱中心偏移 mm一般1012基础顶面高差mm一般513基础根开及对角线尺寸 顺线路设计值一般一般塔半根开AABBCCDD实测值21.4横线路设计值AABBCCDD高 塔实测值设计值0.70.5半对角AOBOCODO实测值14混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日项 目 部年 月 日施 工 队年 月 日项 目 部年 月 日备注掏挖基础的尺寸不允许有负偏差。【S002】Q/CSG表1- B.3铁塔拉线(含锚杆)基础 分项工程质量验收记录(线基3) 工程编号: Q/CSG表1- B.3 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCDEF1拉线基础埋件及钢筋规格、数量关键符合设计要求制作工艺良好2混凝土强度关键设计值:试块强度: MPa 试验报告编号:不小于设计值3底板断面尺寸关键设计值:1%0.7%4基础埋深mm重要设计值:1005锚杆拉线基础孔角度重要2孔径+20mm孔深+100mm6保护层厚度mm重要-57回填土重要符合GB502332005第4.0.7-4.0.10条规定8拉线基础拉环中心与设计位置偏移mm重要20149拉线基础中心在拉线方向的位移左右一般1%L0.7%L前后14210拉线棒外观拉棒无弯曲、锈蚀,角度方向一致整齐11混凝土表面质量外观外观质量无缺陷及表面平整光滑监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注1. L为拉线环中心至拉线固定点的水平距离。2. 拉线基础的尺寸不允许有负偏差。 【S003】Q/CSG表1- B.4 岩石铁塔基础 分项工程质量验收记录 (线基4 )工程编号: Q/CSG表1- B.4 设计桩号基础型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值ABCD1地质(岩石)性能关键设计值:符合设计要求2地脚螺栓(锚杆)规格、数量关键设计值:符合设计要求3锚杆孔径mm关键设计值:嵌固式大于设计值钻孔式20,04锚杆埋深mm关键设计值:符合设计要求5混凝土强度关键设计值:试块强度: MPa 试验报告编号:不小于设计值6整基基础中心位移mm顺线路重要3021横线路30217整基基础扭转一般塔重要107高 塔548基础顶面高差mm一般59基础根开及对角线尺寸mm设计值一般AB: BC:CD: DA:AC: BD:AB:BC:一般塔21.4CD:DA:高塔0.70.5AC:BD:10防风化层外观符合设计要求监理单位验收意见:验 收 单 位质量验收结论签 名班 组 年 月 日施 工 队年 月 日项 目 部年 月 日监 理年 月 日备注岩石基础的尺寸不允许有负偏差。 【H004】Q/CSG表1- B.5混凝土电杆基础 分项工程质量验收记录(线基5)工程编号: Q/CSG表1- B.5 设计桩号杆塔型施工基面施工日期年 月 日基础型式检查日期年 月 日序号检查(检验)项目性质质量标准(允许偏差)检查结果质量等级合格值推荐值1预制件规格、数量关键符合设计要求2预制件强度关键设计值:试块强度: MPa试验报告编号:符合设计要求3拉环、拉棒规格数量关键符合设计要求4底盘埋深mm关键设计值:左右100,50100,05拉盘埋深mm关键设计值:ABCD1006底盘高差关键20左右7基础中心位移mm顺线路关键5035横线路50358回填土关键符合GB502332005第4.0.7-4
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 考点解析-河南省辉县市七年级上册基本平面图形专项攻克试题(含解析)
- 推拿治疗学复习试题及参考答案详解【满分必刷】
- 2025年纺织服装制造业智能化生产智能生产设备智能化改造市场机遇报告
- 2025年基因治疗药物临床研究进展与市场趋势报告
- 押题宝典高校教师资格证之《高等教育心理学》考试题库及参考答案详解一套
- 贸易合同范本
- 解析卷华东师大版7年级下册期末测试卷及答案详解(名校卷)
- 解析卷-四川成都市华西中学7年级数学下册第六章 概率初步专项训练试题(含详解)
- 2025代办消防系统验收及整改施工合同范本
- 2025年度建筑材料购销与全程物流配送合同
- 迷彩九月+启航青春+课件-2025-2026学年高一上学期开学军训动员主题班会
- 2025年暑期教师研修心得-研修蓄力笃行致远
- 2024年陕西事业单位联考A类综合应用能力试题及答案
- 公共基础知识试题(附答案)
- 人教版物理九年级全一册16.1《电压》听评课记录
- 2025年湖北省中考语文真题(含答案)
- (2025年标准)被迫堕胎补偿协议书
- 2025年四川三支一扶考试公共基础知识试卷
- 咸阳赤壁市事业单位招聘笔试真题2024
- 战术基础动作低姿匍匐
- 2025年公文核改竞赛试题及答案
评论
0/150
提交评论