




已阅读5页,还剩58页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of目 录1、编制依据22、工程概况.33、组织机构及职责分工.44、施工方案.65、施工进度计划.246、施工资源计划.267、施工准备工作计划.288、施工现场平面布置图.359、现场电力需求计划表.3510、现场用水需求情况3511、质量通病防治措施3612、绿色文明施工管理3913、安全技术措施4414、质量保证措施60 为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinity environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation strong library solid di spread row engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play three to split battle. Xia Baolong, Secretary of provincial party Committee stressed that while the three to split operation time is over three years, but three to split must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and no unauthorised created63临沂市全兴安装工程有限公司 第一章 编制依据、编制依据:(1)招标单位提供的施工设计图纸(2)国家标准及规范及依据a、通风与空调工程施工质量验收规范GB502432002b、采暖通风与空气调节设计规范GB50019-2003c、高层民用建筑设计防火规范GB50045-95d、锅炉房设计规范GB50041-92e、公共建筑节能设计标准GB50189-2005f、建筑给水排水及采暖工程质量验收规范GB50242-2002g、民用建筑设计通则GB50352-2005(3)甲方提供的设计委托书及设计要求、已批准的初步设计文件(4)建筑专业提供的作业图及相关专业提供的设计资料第二章 工程概况1、工程概况:本工程为山东联建置地有限公司临沂府佑大厦空调安装,项目位于临沂市南坊新区,地处沂蒙二路和三和二街交汇东南角。项目规划建筑面积54440.1平方米,建筑高度98.90米,为一类高层建筑,总投资约1.3亿元,项目用途为临沂市档案局档案馆和高档写字楼项目。工程范围为地下车库的通风、防排烟系统,裙房及主楼部分的暖通空调与防排烟系统的安装。2、施工范围空调、通风系统3、施工条件土建、预埋及室内具备安装开工条件。4、质量目标:1、合同范围内的全部工程的所有使用功能符合设计(或变更)图纸要求。2、本工程各分部分项工程均达到合格标准,系统调试按设计要求一次成功,工程总体质量目标达到合格标准.3、所有隐蔽工程必须经顾客代表和监理部门验收合格。5、工程保修:工程竣工交付后的2个运行周期。第三章 组织机构及职责分工1、项目质量保证体系图项目经理刘海艳技 徐术 海员 林 安 季全 沛 员 平 质 杜检 庆 员 柱 材 张料 宗 员 云 统 程计 天 员 杰施工队长房伟施工技术负责人徐海林班组长操作工人2、管理人员的职责序号管理岗位责任人姓名职责范围1项目经理刘海艳负责履行本工程的全部合同内容,对工程质量达到合同要求和检验评定标准的要求负责,保证本施工组织设计(项目质量计划)的顺利实施。2施工负责人房伟受项目经理委托,负责本施工组织设计(项目质量计划)的具体实施。对工程进度负责,调动人力、物力保证按图纸和规范施工。负责纠正预防措施的实施。对本工程的准备、施工、安装、交付和维修整个过程的控制、管理、监督、改进负责。3技术负责人徐海林对施工图纸、技术资料、项目质量文件、记录的控制和管理负责;审批工程的技术交底等技术文件,负责设计变更等的签证和实施;对审核结果制定纠正或预防措施。4材料负责人张宗云编制本工程的材料采购计划并按规定实施,对进场材料的质量负责;负责本工程施工机械的进出厂,并对保证机械能力负责。5质检员杜庆柱负责本工程的质量监督检查,对隐蔽工程验收、分部分项工程的质量评定、工序交接检等负责监督并确认;对工程质量的错检、漏检负责。6安全员季沛平负责本工程安全施工方案的实施,保证安全施工。对安全隐患的错查、漏查负责。第四章 通风空调工程施工方案1、施工顺序及流向(一)施工顺序1、暖通分部安装准备工作 新风机组安装变风量空调器安装 管道安装水压试验防腐保温隐蔽验收新风、送排风、排烟部分支、吊架制作安装风管制作安装漏光检测系统调试(二)施工流向1、分层的施工平面流向上,逐层施工。2、在各层施工平面流向上:进行支吊架安装,风管、管道安装,变风量空调器安装、风机盘管安装,水压试验,防腐保温等工作程序,最后进行系统主调试。2、施工段的划分结合本工程特点,工程暖通分部划分为镀锌钢板风管制作安装、管道安装、变风量空调器、盘管及通风设备安装三段。3、分部分项工程施工方法(一)风管及部件制作安装工程1、风管的制作:1.1、制作原则1.1.1复合风管制作可以预制或在施工现场制作。风管制作规格按设计资料及GB502432002确定,风管尺寸以其内边尺寸为准,以保证风管的有效断面积。1.1.2 施工中必须先按照设计图纸上的风管规格进行合理的切割下料。由于复合风管板材的规格尺寸为12502450mm(宽度长度),而设计中风管的规格尺寸各不相同,所以划线过程中应精确、合理,切割下料是降低板材损耗的关键。 1.2 板材切割 1.2.1 切割线须保持平直,对角线长度误差应小于5mm,切割线与板面成直角。台阶板(侧面板)切割线深度为201.5mm(图41)。 图41 侧板切割 1.2.2 三通、弯头、异径管等管件用板材,须先放样,后用手提切割机切割。切割角度必须正确,以保证拼接质量。 1.3 矩形风管制作 1.3.1 风管拼装示意图(图42)。注:风管拼装时,台阶板须作为左、右侧板,不得与顶、底面板互换。 图42 风管拼装示意图1.3.2 用刮刀沿侧面板切割线将多余部分去除,确保侧面板梯阶位置平整 1.3.3 在左右侧面板梯阶处适量均匀地敷上专用胶 1.3.4 首先将底面板放于组装架上,保持水平。其次将左、右侧面板梯阶处与底面板粘接,再将顶面板放入侧面板中间。为实现管段间的无法兰连接,侧面板与顶、底面板纵向须错位100mm。最后用捆扎带将拼装好的风管捆紧,捆扎带间距600mm,其与风管四角连接处设置90护角(图42)。1.3.5 风管周长小于2000mm时,对角线长度误差不得大于3mm。风管周长大于2000mm时,对角线长度误差不得大于5mm。 1.3.6 清除连接处挤压出得余胶,同时填补空隙。风管内外壁及侧面板与顶、底面板100mm错位梯阶处均不得留有残胶。 图42 风管组合 1.4 异径风管制作 1.4.1弯头制作 按图放样切割板材,将弯头侧壁分解为多块平板拼接而成(图43)。图43 弯头1.5 三通、四通制作参见4.3弯头制作1.6 大型风管的加固 当风管边长大于1500mm时,必须采取加固措施(图44)。 图44大型风管的加固 1.6.1 板材进行拼接。用钢丝刷刮去拼接处保温层1.5mm,形成凹槽。填满专用胶拼接。固化后用砂纸将两面拼接缝两侧各100mm处打毛,两面均用专用胶粘贴3层宽度为200mm、厚度为0.2mm的玻璃纤维布。 1.6.2 在风管中设置支撑杆。支撑杆为10mm全螺纹镀锌圆钢,两侧内外螺母固定,风管内外侧采用100mm金属垫盘(通风风管使用)或高强度塑料垫盘(空调风管使用)。当为空调风管时,圆钢及内螺母需外包橡塑保温套管(厚度40mm)。支撑杆选用数量见表 41。表 41风管边长 mm15002400240034003400440044005400支撑杆数量1234 1.6.3 在风管四个内角处粘接加强条,加强条尺寸为2540mm,由板材切割而成。 1.6.4 当风管长边1500mm,且短边500mm时,应在风管拼接处内壁用专用胶粘贴2层宽度为50mm、厚度为0.2mm的玻璃纤维布。 1.6.5 当风管边长3000mm时,除按上述要求进行加固外,还需在风管外壁每隔1300mm处设置5050的角钢加固,并与支撑杆连接。2、 风管连接 1.1 主风管与主风管连接(图51) 图51 风管无法兰连接1.1.1 用钢丝刷将两节风管顶、底面板拼接处保温层刮去1.5mm,形成凹槽。然后在凹槽处填满专用胶,并在左右侧面板梯阶处适量均匀地敷上专用胶。1.1.2 将两截风管紧密拼接。清除拼接处挤压出的余胶,同时填补空隙。1.1.3 为确保风管拼接的质量,一节风管不宜两端同时进行拼接。1.2 主风管与支风管连接 1.2.1 在主风管管壁上开口,开口尺寸为主风管内径尺寸加6mm。 1.2.2 按照设计规格制作支风管,将其与主风管连接处切割成梯阶形。 1.2.3在梯阶处适量均匀地敷上专用胶,紧密拼接。清除拼接处挤压出的余胶,同时填补空隙。1.3 风管与阀件连接 风管采用专用法兰与阀件连接。将专用法兰套入风管管壁,采用自攻螺丝固定。然后将法兰的另一面与阀件的法兰连接(图52)。 图52专用法兰连接示意图1.4 风管与圆形软接头连接 根据圆形软接头与所连接的风管尺寸制作一截异形管,将与软接头连接的一面切割一个圆口,与软接头法兰连接(图53)。 图5-3 风管与圆形软接头连接1.5 风管与风口连接1.5.1平面风口的连接按照设计风口的尺寸在风管管壁上开口,在开口处两边的保温层中插入由0.5mm厚镀锌钢板制作的“”形构件。将风口插入管壁开口处,用自攻螺丝将其固定于“”形构件上(图54)。 图5-4 平面风口的连接1.5.2 喉管风口的连接 当设计要求或风口带风阀(软接头)时,风口前需设置风管喉管。按照风口尺寸在风管管壁上开口,将喉管与主风管紧密连接(做法参见5.2主风管与支风管连接)。待粘接处固化后,将风口插入喉管,以自攻螺丝固定(图55)。 当风管带软接头时,将软接头套在喉管外侧,四周紧压防锈薄金属板,自攻螺丝固定(图6)。 图5-5 喉管风口的连接 图5-6 带软接头风口的连接2 伸缩节的制作2.1 当风管直管长度大于20m小于30m时,管段中间设置1个伸缩节。当直管长度大于40m时,则每30m设置1个伸缩节。在伸缩接两端500mm处应设置防摆支架。2.2 伸缩节由通用复合风管板材制作。其内径尺寸为风管外径加6mm,长度为250mm。 首先将两节相连的风管间留10mm的缝隙以便伸缩。将伸缩节粘接在气流下游的风管外壁(粘接面须用粗砂纸打毛),粘接长度为150mm。在气流上游风管外壁粘贴厚度为3mm的聚乙烯泡沫带(起密封作用),粘贴长度为100mm,将伸缩节套入,作为伸缩滑动面。最后用捆扎带将伸缩节捆紧,固化成型(图61)。图6-1 伸缩节的制作3 风管支吊架的设置 3.1 水平安装 3.1.1 风管长边小于等于400mm时,吊杆间距不大于4000mm;风管长边大于400mm小于等于1250mm时,吊杆间距不大于3000mm;风管长边大于1250mm小于等于2500mm时,吊杆间距不大于2000mm;风管长边大于2500mm时,吊杆间距不大于1500mm。 3.1.2 吊杆用圆钢制作,横担、抱箍可用槽钢、角钢或扁钢制作。规格见 表 71 表 71风管长边a吊杆(圆钢)横担(角钢)吊杆孔a500mm6mm圆钢30mm3mm角钢68.5mm500mm a1500mm8mm圆钢40mm4mm角钢8.5mm1500mm a2200mm10mm圆钢50mm5mm角钢10.5mm2200mm3000mm12mm圆钢6、8槽钢12.5mm3.2 垂直安装的风管支架间距不大于3000mm,支架应能负担3000mm风管的重量。并设置橡胶垫。单根直管至少应有2个固定点。3.3 支吊架不宜设在风口、阀门、检查门、及自控机构处,离风管或插接管的距离不宜小于200mm。3.4 未说明的支吊架设置事项参见通风与空调工程施工质量验收规范(GB50243-2002)。4 风管连接处裂缝的修复4.1 如风管连接处缺胶或胶体过稠、未按规定正确设置伸缩节时,易导致连接缝开裂。此时可用专用胶修复。4.2 修复方法:a、在裂缝周围50mm用粗砂纸打毛后,除去杂物;b、将专用胶挤入裂缝;c、在裂缝处贴上厚度为0.2mm的玻璃纤维布,用专用胶修复平整。5 小板的拼接 5.1 切割后产生的边料(小板)可用专用胶拼接,用于边长小于等于500mm的风管。 5.2 用钢丝刷刷去拼接处泡沫板1.5mm,涂上专用胶。 5.3 将拼接面靠紧,确保拼接平整固化。6 其余注意事项 6.1 低温送风状态,保温层应按设计要求加厚,可选用本公司特殊型复合风管。 6.2 当使用环境湿度长期大于80%时,风管内壁需进行防水处理。主风管应设置排水坡度,并在最低处设排液装置防止积水。 6.3 可在洁净空调系统中使用本风管。在风管安装后,清除灰尘,在风管内壁涂刷专用涂料。 6.4 安装在室外的风管应设置防雨措施。3、风管与风管部件的安装:3.1、一般送排风系统和空调系统的安装,要在建筑物围护结构施工完成,安装部位的障碍物已清理,地面无杂物的条件下进行。3.2、确定标高,安装风管支吊架,除锈后刷防锈漆一道。风管支、吊架的吊点,通常采用预埋铁件,支、吊架二次灌浆,膨胀螺栓法或射钉枪法等。3.3、按风管的中心线找出吊杆敷设位置,单吊杆在风管的中心线上,双吊杆可以按托盘的螺栓孔间距或风管的中心线对称安装。吊杆根据吊件形式可以焊在吊件上,也可挂在吊件上,焊接后应涂防锈漆。3.4、立管管卡安装时,应先把最上面的一个管件固定好,再用吊线锤在中心处吊线,下面的管卡可按线进行固定。当风管较长,需要安装一排支架时,可先把两端的安装好,然后以两端的支架为基准,用拉线法找出中间支架的标高进行安装。3.5、为保证法兰接口的严密性,法兰之间应有垫料,一般空调系统及送、排风系统的法兰垫料采用8501密封胶带,软橡胶板闭孔海绵橡胶板。法兰垫料不得挤入或凸入管内。法兰垫料应尽量减少接头,接头应采用梯形或榫形连接,并涂胶粘牢,法兰连接后严禁往法兰缝隙镇塞垫料。3.6、法兰连接时,把两个法兰先对正,穿上几个螺栓并载上螺母,暂时不要上紧,然后用尖冲塞进穿不上螺栓的螺孔中,把两个螺孔橇正,直到所有螺栓都穿上后,再把螺栓拧紧。为了避免螺栓滑扣,紧螺栓时应按十字交叉逐步均匀地拧紧,连接法兰的螺母应在同一侧,连接好的风管,应以两端法兰为准,接线检验风客连接应平直。(二)通风与空调设备安装工程一、通风空调设备安装 操作工艺:预检施工准备电机检查试转吊架制作与安装通风空调设备安装连接配管检验1.质量标准:空调机组及通风空调设备应有装箱清单、设备说明书、产品质量合格证书和产品性能检测报告等随机文件,进口设备还应具有商检合格的证明文件。空调机组及通风空调设备安装前,应进行开箱检查,并形成验收文字记录。参加人员为建设、监理、施工等方单位的代表。空调机组及通风空调设备的搬运和吊装必须符合产品说明书的有关规定,并应做好设备的保护工作,防止因或吊装而造成设备损坏。空调机组及通风空调设备应设立独立的支、吊架,安装的位置、高度及坡度应正确、固定牢固。空调机组及通风空调设备与风管、回风箱或风口的连接,应严密、可靠。(三)管道安装分项工程、材料要求:(1)管材:无弯曲、锈蚀,无飞刺、重皮、凸凹不平现象。(2)管件:无偏扣、乱扣、断丝和角度不准确现象。(3)阀门:铸造规矩,无毛刺、丝扣无损伤,直度和角度正确,开关灵活严密。(4)管材、阀门必须具有合格证, 进场后进行强度严密性试验合格后方准使用。且应具有质监站抽检合格证明。2、施工准备:(1)竖管安装:位于管道井内,安装应配合土建施工。(2)干管安装必须在确定准确的楼地面标高后进行。(3)支管安装必须在墙面抹灰后进行。3、施工工艺(1)工艺流程:安装准备预制加工卡架安装竖管安装干管安装支管安装冲洗试压防腐保温(2)安装准备:1)认真熟悉图纸,安装预埋件。2)按设计图纸画出管路的位置、管径、变径、预留口坡向、卡架位置等施工草图,包括干管起点,未端和转弯、节点、预留口、坐标位置等。(3)竖管安装:按设计要求或规定间距,安装支架,竖管从下向上安装。竖管的连接方式:V型坡口焊接。焊接设备,BX-300交流电焊机按作业指导书规定进行焊接。焊工必须具有上岗证,无证人员不准焊接。焊缝的外观质量检查和验证标准见GB50242-2002采暖与卫生工程施工及验收规范第九章管道焊接第二节碳素钢管管道焊接,表9.2.6.1、表9.2.12之规定。(4)干管安装:干管敷设在各层走廊或吊顶内,干管之间、干管与竖管之间连接,当DN40时采用镀锌钢管丝接;当DN40时采用无缝钢管焊接,在表面除锈后刷红丹漆两度,焊口处刷防锈漆两度。丝接处以露23扣为宜,应将麻丝清理干净后刷防锈漆两度。管道与支架接触处设垫木,垫木与管道之间结合紧密。(5)支管安装:1)检查风机盘管位置及干管预留口位置是否正确,量出支管尺寸。2)配支管按量出支管的尺寸,然后断管、套丝、调直。3)用钢尺、水平尺、线坠校对支管的坡度和平行距墙尺寸,合格后转入下道工序。(6)阀门安装:按图纸要求,阀门、规格、型号、数量及安装位置应符合图纸要求。(7)冲洗试压:系统冲洗试压符合设计和规范要求,并根据施工员制定的施工技术质量和安全技术交底进行。4、应注意的质量问题:(1)竖管不垂直:主要原因是竖管尺寸不准,推接竖管造成的。(2)麻头清理不净,原因是操作人员未及时清理造成。(3)管道坡度不均匀主要是管架没有拉线找平、找正。(四)油漆防腐分项工程、材料要求:防锈漆、油漆等应有出厂合格证。、作业:要求施工环境温度5且通风良好,无煤烟、灰尘及水汽等。气温5要采取冬施措施。、操作工艺:(1)管道、设备及容器清理除锈:用钢丝刷将管道、设备及容器表面的浮锈除去,然后用砂纸磨光,最后用棉纱将其擦净。(2)管道设备及容器防腐刷油:1)明装管道、设备及容器必须先刷一道防锈漆,待交工前再刷两道面漆。2)暗装管道、设备及容器刷两道防锈漆,第二道防锈漆必须待第一遍漆干透后再刷。且防锈漆稠度要适宜。3)防腐涂漆方法:采用手工涂刷,应分层涂刷,每层往复进行纵横交错,并保持涂层均匀,不得漏涂或流坠。、质量要求:防腐除锈应符合以下规定:表面应无污物、锈斑,管道、箱类、金属支架的涂漆应符合如下规定:油漆种类和涂刷遍数符合设计要求,附着良好,无脱皮、起泡和漏涂,漆膜厚度均匀,色泽一致,无流坠及污染现象。(五)保温分项工程、材料要求:保温材料的性能、规格应符合设计要求,并具有合格证。使用的保温材料应符合空调设计参数要求和消防防火规范要求a、导热系数0.022-0.047W/m.k。b、防火要求:不燃或阻燃。、作业条件:(1)管道及设备的保温应在水压合格后方可进行。如需先做保温层,应将管道的接口及焊缝处留出,待水压试验合格后,再将接口处保温。、操作工艺(1)管道保温1)绝热层施工方法:供回水管保温采用闭孔橡塑海绵隔热材料,保温厚度为32mm;冷凝水保温厚度为25mm。新风管和空调送回风管保温厚度为40mm。2)保温材料下料应准确,切割要平齐,在裁料时要使水平、垂直面搭接处的短面两头顶在平面上。3)绝热材料纵向接缝不宜设在风管或设备底面。4)保温材料铺覆应使纵横缝错开。小块保温材料应尽量铺覆在水平面上。5)在保温前,保温材料应切割好与管道尺寸一致,然后铺覆在管道上,连接牢固、美观。4、质量标准:保温层表面平整,做法正确,搭茬合理,封口严密,无空鼓及松动,两个相邻管套的纵缝应错开,横向接缝应握紧对严,包扎牢固、平稳。4、质量和安全技术措施(一)工程质量措施1、严格控制材料的采购、贮存、标识等工作,确保合格材料应用到本工程。(1)材料、机械设备采购的质量措施。a 、对施工企业自行采购的工程材料及机械设备,对照供方产品标准,保证其质量必须能满足工程的使用要求;b 、有对供方质量进行选择、评估、评价和控制供方的方法;c、 对工程所用的材料、机械设备要有可追溯性,要明确追溯内容的形成、记录、标识的主要方法;d 、项目采购的各种材料、设备和半成品,应由材料员编制采购计划,并上报公司材料科审批,所有到场的材料、机械设备,均应有质保书,材料员负责对材料做外观检验及质保书的收集,必要时送试验中心化验并做好验证记录。(2)顾客提供材料、机械设备的质量控制工程项目所用的材料、机械设备按照合同要求由顾客提供的部分应与顾客签订供货合同,合同中应注明对产品的质量要求、数量及供货时间,并对顾客提供的产品进行标识,并留有检查检验及验证的记录。(3)产品标识和可追溯性a 材料的标识通过标牌、入库验收单、保管台帐、材质证明的方式来实现,过程的标识是通过印章、钢印和记录来实现的,顾客提供物资加注“顾供”字样的标记;b 施工中认真填写三检记录、隐蔽工程检验记录和工序交接检记录,需建设单位代表签字的要及时进行签字认可。2、对本工程中的新工艺、新材料、新技术及时组织相关人员进行学习、分析、探讨,制定出具有针对性的措施应用到本工程,确保工程质量。3、选用经检定合格的计量器具,选派有责任心、精明强干的技术人员进行标高、位置尺寸的确定工作,并尽量专职专人进行测量定位,确保标高、位置尺寸统一无误。4、为确保关键部位的质量,特制定如下措施:(1)保证本工程全过程质量处于受控状态,增强广大员工的质量意识。加强“质量是企业的生命,信誉的根本,效益的核心”的质量意识教育。树立用户满意是我们的承诺的宗旨。加强“爱企业做主人,创信誉,争一流”的企业精神教育。加强职工的技术素质教育,从技术上解决质量问题:(2)根据关键部位的特点有针对性的组织职工系统学习规范、规程的相关内容、施工方法、工艺;制定并组织学习技术管理,技术人员组织工人进行技术交底,并绘图详细讲解,确保操作人员对工程及施工方法明白无误。(3)严格执行工程项目技术质量管理责任制,技术工作质量是单位工程质量的关键,技术质量保证在工程质量保证工作中占有主导地位。确保在施工中贯彻技术规范、规程、科学的安排施工工序,确保工程质量符合设计标准要求。(4)执行质量与经济效益挂钩的措施,在签订内部质量合同时实行优质优价,并强调质量指标在内部结算中的否决地位,由质量技术人员把关,工人工资奖金与质量挂钩,从而强化工人的质量意识。5、为进一步加强质量控制,确保以前时常发生的质量问题不在本工程中重现,特成立专门的QC攻关小组进质量攻关,分头把关,克服施工质量弊病。6、抓好反映工程内在质量的技术资料的收集整理工作,做到各种材料、设备合格证、准用证齐全,施工试验、施工记录、调试检验等原始记录,竣工资料及时、齐全、手续完备,准确可靠,并按规定编制、装订成卷归档。7、施工员必须领导施工班组做好下面几项控制工作。(1)坚持按图纸施工。(2)严格按照国家颁发的施工验收规范、质量检验评定标准统一施工,发现质量问题采取有效措施,立即补救,不遗留。(3)做好各施工环节的质量检查,坚持自检和交接检、专检并做好记录。并及时做好隐蔽工程的检查验收和分项工程检查验收。8、施工期间要作好质量检查组织工作,工人自检,要对自己施工质量负责,班组互检,要互学互进。要求小组进行日检查,施工队周检查,使本工程质量不断提高,以优良标准竣工。(二)、安全施工措施根据本工程特点,采取以下安全施工措施: 1、认真贯彻落实国家和省市发布的安全生产法规、规程,坚持“安全第一,预防为主”的方针,建立健全施工安全检查监督网络体系,分段分部位做好安全检查与防护,使之做到经常化、制度化、标准化。 2、本工程高空作业比较多,应特别注意防坠落、坠物伤人等隐患,2m以上施工应系好安全带或加设可靠的防护栏杆。 3、现场安全管理:建立健全安全值班和安全活动记录卡,坚持“五同时”、“三不放过”、“工前交底和工后讲评”制度。 4、特殊工种(如电焊工、电工等)要持证上岗,并定期作体格检查,符合要求方准上岗。5、施工现场严禁吸烟、取暖等非生产性烟火。生产用火(限于电焊、气焊、气割,其他用火须报安全部门批准)必须在现场配备灭火器具并派专人管理。6、成立防火领导小组,制定并严格执行消防制度,着重作好如下工作:(1)严禁在施工现场吸烟;(2)油漆稀料等易燃、易爆的物品必须单独存放于安全地点,并设有明显的防火标志;(3)氧气瓶、乙炔瓶存放要有安全距离,气压表必须有效,应轻抬轻放,并设有明显的防火标志;(
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 建筑行业公司股份合作协议书的范文
- 信息化项目技术保证措施
- 农业机械共享及租赁服务协议书
- 试验检测仪器设备监控系统措施
- 员工体验优化路径-洞察及研究
- 跨境数据流动-第2篇-洞察及研究
- 活性炭选择性吸附研究-洞察及研究
- 二手车交易平台合作开发协议书
- 预应力连接技术-洞察及研究
- 韧性对接结构设计-洞察及研究
- 中学安全管理制度汇编
- 2024年BIM模型转换与兼容性合同
- 《继电保护和安全自动装置屏柜建模及交互规范》
- 住院精神疾病患者自杀风险护理
- 市儿科质量控制分中心工作考评表
- SH/T 0358-199510号航空液压油
- 劳动保障监察业务知识
- 新入辅导员职员工培训
- 泡泡玛特公司战略分析
- 保安公司安全生产培训课件
- 毕业设计工作进程记录
评论
0/150
提交评论