材料采购合同(英文)_第1页
材料采购合同(英文)_第2页
材料采购合同(英文)_第3页
材料采购合同(英文)_第4页
材料采购合同(英文)_第5页
已阅读5页,还剩5页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

PURCHASE CONTRACTContract No.: Date:Signing Place: The Buyer:Address: TEL: FAX:The SellerAddress: TEL: FAX:1、 This Contract is made by and between the Buyer and the Seller; whereby the Buyer agree to buy and the Seller agree to sell the under mentioned commodities to the terms and conditions stipulated below:ItemCommodityUnitQtyUnit PriceTotal AmountDetails see attachments1*Total Value: ( VAT included, transport excluded )2、 Country of Origin and Manufacturers:3、 Terms of Delivery FOB/CFR/CIF4、 Time of Delivery:Within days after the receipt of the down payment.5、 Port of loading:6、 Port of Destination:7、 Insurance: Insurance shall be covered by the for115% of the invoice value against Risks and Additional Risks.8、Terms of Payment(1) Letter of Credit: The Buyer shall, _ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire _ days after the completion of loading of the shipment as stipulated. (2)Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and _ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange. (3)Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_ days after the Buyers delivers the document through Sellers bank and _Bank to the Buyer against acceptance (D/A _ days). The Buyer shall make the payment on date of the bill of exchange. (4)Cash on delivery (COD): The Buyer shall pay to the Seller total amount within _ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF). 9、Documents RequiredThe Seller shall present the following documents required to the bank for negotiation/collection:(1) Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/to collect;(2) Signed commercial invoice in copies indicating Contract No., L/C No.(Terms of L/C)and shipping marks;(3) Packing list/weight memo in copies issued by ;(4) Certificate of Quality in copies issued by ;(5) Certificate of Quantity in copies issued by ;(6) Insurance policy/certificate in copies(Terms of CIF);(7) Shipping advice: The Seller shall, within hours after shipment effected, send by each copy of the above-mentioned documents No. .10、Terms of Shipment:(1) FOBThe Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Sellers failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Sellers account.(2)CIF or CFRThe Seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _ of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.11、Shipping Advice The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _ within _hours. 12、Guarantee of Quality:The Seller shall guarantee that upon Delivery all goods to be delivered by the Seller shall be completely new and shall comply in all material respects with this Contract.The guarantee period is within days after the date of the completion of unloading of the goods at the port of destination. Within the guarantee period, the Seller shall remove all defects of the goods due to design, workmanship and improper material used either by repairing or by placing the defective parts or the goods on his own account.13、Packing:The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as Do not stack up side down, Keep away from moisture, Handle with care shall be stenciled on the surface of each package with fadeless pigment. 14、Inspection(1)The Seller shall have the goods inspected by _ days before the shipment and have the Inspection Certificate issued by_. The Buyer may have the goods reinspected by _ after the goods arrive at the destination. (2)The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.15、ClaimWithin 30 days after the arrival of the goods at the destination, should the quality, specification or quantity be found not in conformity with the stipulations of the Contract except those claims for which the insurance company are liable , the Buyers shall, on the strength of the Inspection Certificate issued by the Commodity Inspection Bureau, have the right to claim for replacement with new goods, or for compensation, and all the expenses (such as inspection charges, freight for returning the goods and for sending the replacement, insurance premium, storage, loading and unloading charges etc.) shall be borne by the Sellers. As regards quality, the Sellers shall guarantee that if, within 12 months from the date of the Final Acceptance of the goods, damage occurs in the course of operation by reason of inferior quality, bad workmanship or the use of inferior materials. The Buyers shall immediately notify the Sellers in writing when damage occurs and put forward a claim supported by Inspection Certificate issued by the China Commodity Inspection Bureau. The Certificate so issued shall be accepted as the base of a claim. The Sellers, in accordance with the Buyers claim, shall be responsible for the immediate elimination of the defect(s), complete or partial replacement of the commodity or shall devaluate the commodity according to the state of defect(s). Where necessary, the Buyers shall be liberty to eliminate the defect(s) themselves at the Sellers expenses. If the Sellers fail to answer the Buyers within one month after receipt of the aforesaid claim, the claim shall be reckoned as having been accepted by the Sellers.16、Late delivery and PenaltyShould the Sellers fail to make delivery on time as stipulated in the Contract, with exception of Force Majeure causes specified in Clause 17 of this Contract, the Buyers shall agree to postpone the delivery on condition that the Sellers agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiations. The penalty, however, shall not exceed 5% of the total value of thegoods. The rate of penalty is charged at 0.5% for every day. In case the Sellers fail to make delivery ten weeks later than 7 days, the Buyers shall have the right to cancel the Contract and the Sellers, in spite of the cancellation, shall still pay the aforesaid penalty to the Buyers without delay.17、Force MajeureEither Party shall not be held responsible for failure or delay to perform all or any part of the Contract due to flood, fire, earthquake, drought, war or any other events which could not be predicted at the time of the conclusion of the Contract, and could not be controlled, avoided or overcome by the parties. However, the Party effected by the Event of Force Majeure shall inform the other party of its occurrence in written as soon as possible and thereafter send a certificate of the Event issued by the relevant authority to the other party but no later than 15 days after its occurrence. In case the Event lasts for more than 60 days, the Buyers shall have the right to cancel the Contract

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论