




已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
英文原文CALCULATION OF ELECTROMAGNETIC RADIATION CRITERION FOR ROCKBURST HAZARD FORECAST IN COAL MINES V. FRIDAbstractIntensive micro-fracturing of rock close to mining operations accompanies an increase in the likelihood of rockbursting. This fracturing causes an increase of the electromagnetic radiation (EMR) level by up two orders of magnitude, depending on the mining environment. Several examples of this enhanced EMR are presented in this paper. We first treat the EMR theoretical criterion of rockburst hazard in coal mines and compare it with the empirical criterion of EMR activity that was revealed on the basis of more than 400 dilTerent hazardous and non-hazardous situations in underground coal mines. Only the following parameters are needed to estimate the EMR criterion of rockburst hazard: limiting value of gum volume, mine working width, coal seam thickness, and coal elastic properties.Key words: Rockburst, electromagnetic radiation, fracture, coal mines1. IntroductionThe phenomenon of rockbursting has long been known in mining. The rockburst hazard increases if the load on a given part of a coal seam exceeds some critical level,while the distance to the stress maximum in the zone of influence of a mine working is lower than the critical value (PETUKHOV and LINKOV, 1983). The rockburst hazard is usually determined by some standard geomechanical method, for example, gum volume measurement, measurement of hole diameter or number of disks that are created due to core fracturing as a result of drilling in a highly stressed zone, etc. (PETUKHOV, 1972). The method of gum volume measurement is generally used in coal mines of the former USSR. All of these methods are very time-consuming and sometimes dangerous becausedrilling is required. For these reasons, rockburst hazard forecasting at a mineworking face must be made short-term and safe. Geophysical methods can help toreduce the risks (FALLON et al., 1997).As noted by LOCKNER (1993, 1996), there is a strong parallel between the well-known Gutenberg-Richter relation for seismic events (from macro (earthquake) to micro (rock burst) and power-law frequency magnitude relationship for acoustic emission (AE) events. This analogy suggests that micro shocks (high frequency and small magnitude) are precursors of macro failure (large magnitude and small frequency) and is the theoretical basis for rockburst forecasting by the AE method (KuKSENKO et al., 1982; MANSUROV, 1994). The EMR frequency range is close enough to the AE band. Therefore, both types of emissions are associated with rock fracture YAMADA et Cll., 1989; OKEEFE and THIEL, 1995; RABINOVITCH et Cll., 1995.Hence, it would be correct to assume that electromagnetic radiation (EMR) could beuseful for rockburst hazard forecasting along with AE. Moreover, being non-contact, the EMR method has advantages over AE. For example, when a rapid and comprehensive prognosis of a short-term mine working region (for example, in a drift face) is needed, the roughness of the mine walls becomes a marked problem for the AE method for rapid data acquisition due to inferior contact between the AE transducer and the mine wall.Numerous investigations have examined different aspects of the EMR (CRESS et Cll., 1987; FUJINAWA et Cll., 1992; NITSAN, 1977; OGAWA et Cll., 1985; WARWICK et al., 1982; YAMADA et al., 1989; YOSHINO et al., 1993). The EMR amplitude is a function of the crack area (RABINOVITCH et al., 1998, 1999). Moreover, an increase of elasticity, strength, and loading rate enhances the EMR amplitude (GoLD et al., 1975; NITSAN, 1977; KHATIASHVILI, 1984; FRID et Cll., 1999).Since the eighties, the interest in EMR has increased in connection with the problem of rockburst forecasting. KHATIASHVILLI et al. (1984) carried out an investigation of EMR in the Tkibulli deep shaft (Georgia) prior to an earthquake of 5.4 magnitude. The registration point (at the shaft position) was located 250 km from the earthquake epicenter. Prior to the earthquake itself, an increase of intensity of the lower part of the spectrum (1100 kHz) and a corresponding decrease of intensity of higher frequencies (100-1000 kHz) were observed. An increase of the number and the sizes of cracks during the earthquake approach could, perhaps, explain this phenomenon. NESBITT and AUSTIN (1988) registered EMR in a gold mine (2.5 km depth). An EMR signal (1.2 mA/m amplitude) was generated seconds prior to the micro-seismic event (magnitude of -0.4). Registra-tion of EMR activity in Ural bauxite mines showed (ScITOVICH and LAZAREVICH, 1985) that its values sharply increased with rockburst hazard increase. Analogous works in Norilsk polymetal deposit (Krasnoyarsk region) revealed an increase of EMR amplitude (up to 150-200 mV/m) and activity in the rockburst hazardous zones (REDSKIN et al., 1985). MARKOV and IPATOV(1986) investigated EMR activity changes in an apatite underground mine (Khibin deposit, Kola peninsula) and ascertained that EMR amplitude in rockburst hazardous zones was in therange of 8-25 mV/m and EMR activity here was significantly higher than the regular noise level. This very limited overview demonstrates that the EMR is a multi-scale phenomenon that is currently investigated in laboratories and in .situ (before earthquake and rockburst). However, all EMR mine investigations have usually been empirical, and the degree of their theoretical generalization is not enough to be useful for rockburst forecasting. This paper first considers a development of the theoretical EMR criterion for rockburst forecasting.2. Comparison of EMR and Gum Methods The promotion of a new method for rockburst forecasting is a very responsible undertaking. Hence, the new method must be comprehensively compared with the method which is currently being used. In this section of the paper we consider the methodological foundation of the gum method that has been used for rockburst forecasting before discussing EMR and the EMR methodology. Finally, several examples of EMR and gum investigations are presented.2.1. Methodology of Gum MeasurementDrilling of a highly stressed coal seam leads to an intensive fracturing process in the zone, influenced by the drill hole. The volume of this highly cracked zone depends on the hole diameter, the drilling rate and, especially, the stress level. Hence, if the first two parameters remain invariant for a given coal seam, the stress value in the coal seam (Fig. 1) is responsible for the volume of drilled coal rubble that is recovered from the hole (i.e., from the highly stressed zone drilled by the hole). If the drilling is dry, the drilled coal rubble is calledgum. The non-dimensional diameter,of the highly stressed zone (ratio of the non-elastic deformation zone, diameter D, to the hole diameter d=0.043 m, Fig. 2) can be calculated from the following formula (PETUKHOV, 1972): (1)where n,. is the coefficient of coal loosening on borehole wall that is generally equal to 1.3-1.4, Mo is the gum volume of a borehole (MD=d2/4A, A is the borehole length), and M,S. is the gum volume induced by drilling in a stressed zone) TUKHOv et al., 1976). The vertical stress in the coal seam can be determined as follows (PETUKHOv et al., 1976) (2)where is the coal shear strength. Forecast boreholes are usually drilled in intervals (the length of each interval is 1 m). Hence, if we determine the gum volume for each meter of the hole, we can predict the vertical stress distribution in the coal seam near the mine working face.where k is the coal shear strength. Forecast boreholes are usually drilled in intervals (the length of each interval is 1 m). Hence, if we determine the gum volume for each meter of the hole, we can predict the vertical stress distribution in the coal seam near the mine working face.After the drilling of each interval, the gum volume is measured and if it exceeds a definite limiting value (experience at the mining works in North Kuzbass shows that the limiting values are 5 to 8 liters per meter at the fourth and the seventh drilling meter from the drift face, respectively (Table 1), drilling is stopped, and that part of the mine working, is considered rockburst hazardous.2.2. EMR Methodology for Mine MeasurementFigure 3 explains the EMR activity definition. The EMR activity is defined by the number of intersections of the EMR voltage signal (per unit time) with a given volt 100 age level (of a special counter). The EMR activity was measured by a resonance 士1 kHz antenna. Our preliminary mine estimation of electromagnetic patibility conditions showed that the given resonance frequency would allow com-us to accurately extract the useful signal from the industrial background noise.Table 1 Calculation of rockburst hazardous zone parameteFigure 1The vertical stress distribution in the zone of influence of the mine working (all parameters are discussed in the text).The zone of non-elastic deformation excited by drilling in the high stressed zone (b is the non-dimensioned diameter of this zone:the ratio of the non-elastic deformation zone diameter n to the hole diameter d=0.043 m)Figure 3The EMR signal that intersects counter voltage level.中文译文电磁辐射在煤矿冲击地压预测中的应用 韦.弗瑞德摘要:采矿活动引起的强烈岩石破碎导致冲击矿压发生的可能性增加。这些采矿环境导致的岩石破碎引起电磁放射(EMR)的水平增加。本文阐述了电磁辐射规律显现的几个例子。我们首先对煤矿在开采期基于400多个采动和非采动环境下矿压显现状况引起的电磁辐射显现现象作了统计。其中只需以下参数来对矿压显现导致的电磁辐射作评价:声发射、工作面长度、煤厚、煤层硬度。关键词:冲击矿压 电磁辐射 破碎 煤矿1. 简介人们在采矿方面认识冲击矿压现象已经很久了。在部分煤体上的负荷超过一定的水平,冲击矿压发生的可能性就大大增加(PETUKHOV和LINKOV, 1983)。对于冲击矿压发生的预测常常考虑地质因素:生发射的测量、裂隙大小的测量、高应力区域开采导致的岩石破碎度等(PETUKHOV, 1972)。在应用方面,声发射法经常用于前苏联的煤矿。所有的这些方法都非常耗时而且有时很危险,因为需要在开采区域打钻孔,这将导致岩石的应力释放。因为这些原因,工作面冲击矿压危险性预测必须耗时少并且安全。地质方法可以并不能帮助降低这些工作的风险(FALLON等, 1997)。据LOCKNER (1993, 1996)记载, 因为地震原因,著名的古登宝界面和理查德界面有很大的平行面而且有巨大能量的声发射。这个相似点意味着微震 (高频率、小振幅) 是大震 (大振幅、小频率) 的前兆,并且意味着这是声发射法预测冲击矿压的理论基础 (KuKSENKO等,1982; MANSUROV, 1994)。电磁辐射的频率范围与声发射的关系极为密切。因此,两种类型的辐射与岩石破碎有关(YAMADA等, 1989; OKEEFE和THIEL, 1995; RABINOVITCH 等, 1995) 。因此,电磁辐射可以和声发射一起应用于冲击矿压预测。而且,遥控操作使电磁辐射法比声发射法占优势。 举例来说,如果在一个快速推进的工作区域 ( 例如,在一个无人工作面) 矿井巷道的粗糙影响声发射的传输和声发射所需要的各种精确数据构成了矛盾。很多的研究成果已经测试了电磁辐射的不同方面的性能(CRESS等., 1987; FUJINAWA 等., 1992; NITSAN, 1977; OGAWA 等, 1985; WARWICK等, 1982; YAMADA , 1989; YOSHINO , 1993) 。电磁辐射振幅是裂隙区域运动的一个函数(RABINOVITCH et al., 1998, 1999) 。而且,弹力,压力以及它们作用的频率增加会增大电磁辐射的振幅 (GoLD, 1975; NITSAN, 1977; KHATIASHVILI, 1984; FRID, 1999) 。自80年代以来, 对电磁辐射预测冲击矿压问题的研究热度一直在增加。KHATIASHVILLI . (1984)做了一个在深井下预测出5.4级地震的研究。他在井底的观测点距离震源足足有250千米。伴随地震的发生,1-100千赫的低频波急剧增加,而100-1000千赫的高频波在减少。在地震过程种岩石破碎的数量和大小可以,或者大概可以解释这些现象。NESBITT 和 AUSTIN(1988)再次在地表2.5千米下的一个金矿对电磁辐射作了研究。有记载一次微震前一串电磁辐射信号提前发射出来(ScITOVICH 和 LAZAREVICH,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 公司消防部门管理制度
- 嘉兴南湖学院管理制度
- 平台项目商务方案(3篇)
- 公司软件资产管理制度
- 劳务公司工程管理制度
- 公路安全设施方案(3篇)
- 小区走廊经营方案(3篇)
- 小学爱心之家管理制度
- 城管岗亭改造方案(3篇)
- 学校资产动态管理制度
- 清洗剂安全技术说明书(MSDS)报告
- 企业安全生产网格化管理体系图空白
- 大酒店员工离职交接表
- 2022年广东省深圳市中考化学真题试卷
- 国际财务管理教学ppt课件(完整版)
- 2022年江西省南昌市中考一模物理试卷
- 光引发剂的性能与应用
- 图像处理和分析(上册)课后习题答案(章毓晋)
- 三金片前处理车间1
- NB_T 10499-2021《水电站桥式起重机选型设计规范》_(高清最新)
- 韵能cfd风环境模拟stream scstream答疑软件常见q a汇总
评论
0/150
提交评论