高一数学(人教版)必修五《第二章--数列》单元测试二_第1页
高一数学(人教版)必修五《第二章--数列》单元测试二_第2页
高一数学(人教版)必修五《第二章--数列》单元测试二_第3页
高一数学(人教版)必修五《第二章--数列》单元测试二_第4页
高一数学(人教版)必修五《第二章--数列》单元测试二_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

第二章 数列单元测试一一、 选择题 1已知,则数列是( ) A递增数列 B递减数列C常数列 D不能确定2数列中,则为( ) A3 B11 C5 D193正偶数数列 2,4,6,8,10的递推公式是()ABCD4如果一个数列的前3项分别是1,2,3,下列结论中正确的是( )A它一定是等差数列B它一定是递增数列C通项公式是D以上结论都不一定对5等差数列的相邻4项是,那么a,b的值分别是()A2 ,7 B1,6 C0,5 D无法确定6已知等差数列的公差不为0且第二、三、六项构成等比数列,则公比为() A1 B2 C3 D47等差数列a,b,c三项和为12,且a,b,c2成等比数列,则a() A11或8 B2C8 D 2或88在2和30之间插人两个正数,使前三个数成等比数列,后三个数成等差数列,则插人的两补数依次是() Aa5,b =125 B a6,b=18 Ca 3,b4D a = 6,b=12.59已知等差数列的公差,且,成等比数列,则的值是() A3 BC D10ABC中,是以4为第三项,4为第7项的等差数列的公差,是以为第三项1,9为第六项的等比数列的公比,则这个三角形是( ) A钝角三角形B锐角三角形 C等腰直角三角形D非等腰的直角三角形11已知等查数列的公差为,若此数列的前20项和,则M应为( ) A BC D12已知数列的通项公式,若此数列的前n项和最大,则n的值为( ) A12 B13C12或13 D14 13若数列中,则等于( ) A1 B1 C0 D214在等差数列中,已知前15项和,那么等于()A3 B4 C6 D12二、填空题15在数列中,以后各项由递推公式给出,写出这个数列的前4项_,_,_,_,并由此写出一个通项公式_16在数列中,且任意大于1的正整数,点(,)在直线上,则_17若数列是等差数列,是等比数列,且1,把这两个数列对应的项加起来所得的新数列前三项分别是3,12,23,则的公差、的公比之和是_18互不相等的三个数,a,b,c成等差数列,且a,c,b成等比数列,则a:b:c_19在100之内的正整数中,能被3整除,又能被5整除的数有_个20把正整数中被4除余1的数从小到大排成一个数列,若它的前n项和为,则_三、解答题21已知数列中,且对任意均成立,求实数的取值范围22一个各项都是正数的无穷等差数列,和是方程的两个根,求它的通项公式23在等差数列中,已知,求首项与公差24互不相等的三个数之积为8,这三个数适当排列后可成为等比数列,也可成等差数列,求这三个数排成的等差数列25数列是公比大于1的等比数列,且, ,求满足的最小正整数n答案:1、 A; 2、D; 3、C; 4、D; 5、A; 6、C;7、A; 8、B; 9、C; 10、B; 11、;D 12、C;13、A; 14、C15、a, ,16、 17、918、1:1:1 或 (4):(1):219、620、3721、22、 或 23、24、2,2,2或-2,1,4或4,1,225、n = 10为搞好山东省交通科学研究所研发基地项目的结算审计工作,我跟踪审计部特针对本项目作如下要求,请各施工单位、供货单位遵照执行:and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline . Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论