1、高频振动器底坐安装(High frequency vibrator bottom seat installation)High frequency vibrator base mounting1, the fixed frame is better to use channel steel, so that vibration force can be increased. When welding channel steel, skip welding and prevent vibration cracking silo.2, thin rotten son to weld a reinf
2、orcement plate.3, whether the reinforcement plate or channel and vibration of the contact surface should be flat, or the screws will be tight, so that the vibration cylinder cylinder deformation, resulting in stop vibration.4, the installation of vibrators, with high flexibility of the gasket, in ca
3、se of loosening.5, the steel structure beam vibration aging, steel beam to add rubber pad, easy to produce resonance, so that welding residual stress relaxation, and dont rest on the node.High frequency vibrators are detected before use:After the high frequency vibrator is finished, the surface must
4、 be carefully cleaned so as to ensure good heat dissipation and keep it in the dry and ventilated place.Attention to high frequency vibrator and power control cabinetNotice of power control cabinet1, the shell must be reliable, grounding before use.2, the output electrical access to the device, whos
5、e first check the insulation, circuit and electric appliance is intact. The use of supporting special waterproof grounding, reliable before the power.3, the devices first boot, which is soft start, five or six seconds after full speed work. The boot button is started directly, and the current should
6、 be considered.4, the output frequency conversion, boot operation can change the frequency at any time, but not overload.Supporting the production of high frequency vibrator in order to ensure the performance and normal use.5, use should pay attention to ventilation, prevent high temperature (sun) a
7、nd water drench.The use, maintenance, maintenance and repair of high frequency vibrator1, the high frequency vibrator before use should check the insulation, with 500 volt megohm table of motor winding and Insulation check, the value shall not be less than 2 ohm, or its main 120 degrees with constan
8、t temperature drying box.2, the high frequency vibrator parts are fixed in place, the screws are loose, check, confirm the error, you can test machine. When testing the machine, the vibrator must be on the soft object (sponge, etc.) and must not be placed directly on the concrete floor.3 、 the high
9、frequency vibrator motor shaft can only be installed in horizontal direction, on the template must not allow a certain angle with the level.4. The high frequency vibrator wire is connected with the cable and is fixed on the handle of the motor, so as to avoid pulling the motor lead off when the moto
10、r is vibrating and pulling the cable, thereby causing the lack of phase and burning the motor.5, in the operation found that screws loose, should promptly stop vibration and power cut, to prevent vibration wounding.6, high frequency vibrator to damp, strictly prohibit water, such as water after dryi
11、ng must be used again.7, should be normal inspection of power lines, sockets, plug switches, wiring is loose, safe, ensure good contact safety.8, after the vibrator is used, the appearance must be carefully cleaned, to ensure good heat dissipation, and placed in a dry ventilated place, so that the n
12、ext use.Direct manufacturers T beam and box girder, trolley tunnel, dam and other large aqueduct track board, cement component special attachment type high frequency vibrator and auxiliary control cabinet:/ / QQ:1372761599 (space with data and video
13、)Debugging video of high frequency vibrator before leaving factory:Http://v_show/id_XMzU0MTE5ODE2.htmlHigh frequency vibrator site warehouse site commissioning video:Http://v_show/id_XNDA3ODU5NTAw.htmlHigh frequency vibrator installation video:Http://v_show/id_XMzU0M
14、Dk4NTcy.htmlHigh frequency vibrator installation video 02:Http://v_show/id_XMzU0MDk3MDg0.htmlHigh frequency vibrator; tunnel trolley; application video:Http://v_show/id_XMzYzMjQyNjg4.htmlApplication of South to North Water Diversion project:Http://v_show/id_XMzY0NzU0
15、NDE2.htmlMore high frequency vibrator video, please:Http://u/UNDEwMDI4MDM2/videosMore high frequency vibrator video, please:Http://u/UNDEwMDI4MDM2/videosThe benefits of using high frequency vibratorsSpecial high frequency vibrator for bridge prefabrication is portable and high
16、in amplitude. The high frequency vibrator is more suitable for prestressed concrete T beam. The previous construction has been using a common external vibrator, ordinary type vibrator in 2.0kw vibrator while in precast beam can meet the requirements, but the quality of its major, four screws, so the
17、 installation and disassembly is difficult, time-consuming and laborious. The damage frequency of the vibrator is relatively high, so it is easy to find the phenomenon of vibration leakage if it is not found, repaired or replaced in time. As the ordinary vibrator is not convenient to move, the numbe
18、r of one-time purchases is much larger than the fast type, so the cost is also increased. Ordinary type vibrator for low frequency vibration, damage to the template is relatively large, which not only increases the weight of the template but also increases the cost, but also 1.5KW vibrator beneath t
19、he beam flange is thick and there is insufficient implicit vibration force. Therefore, it is necessary to select the vibration parameters and structural dimensions of the vibrator reasonably according to the shape of the beam, the nature of the concrete and the construction conditions, so as to achi
20、eve the desired vibration effect.Notes on the use of attached high frequency vibrators and matching control cabinetsNotice of power control cabinet1, the shell must be reliable, grounding before use.2, the output electrical access to the device, whose first check the insulation, circuit and electric
21、 appliance is intact. The use of supporting special waterproof grounding, reliable before the power.3, the devices first boot, which is soft start, five or six seconds after full speed work. The boot button is started directly, and the current should be considered.4, the output frequency conversion,
22、 boot operation can change the frequency at any time, but not overload.Supporting the production of high frequency vibrator in order to ensure the performance and normal use.5, use should pay attention to ventilation, prevent high temperature (sun) and water drench.The use, maintenance, maintenance
23、and repair of high frequency vibrator1, the high frequency vibrator before use should check the insulation, with 500 volt megohm table of motor winding and Insulation check, the value shall not be less than 2 ohm, or its main 120 degrees with constant temperature drying box.2, the high frequency vib
24、rator parts are fixed in place, the screws are loose, check, confirm the error, you can test machine. When testing the machine, the vibrator must be on the soft object (sponge, etc.) and must not be placed directly on the concrete floor.3 、 the high frequency vibrator motor shaft can only be install
25、ed in horizontal direction, on the template must not allow a certain angle with the level.4. The high frequency vibrator wire is connected with the cable and is fixed on the handle of the motor, so as to avoid pulling the motor lead off when the motor is vibrating and pulling the cable, thereby caus
26、ing the lack of phase and burning the motor.5, in the operation found that screws loose, should promptly stop vibration and power cut, to prevent vibration wounding.6, high frequency vibrator to damp, strictly prohibit water, such as water after drying must be used again.7, should be normal inspecti
27、on of power lines, sockets, plug switches, wiring is loose, safe, ensure good contact safety.8, after the vibrator is used, the appearance must be carefully cleaned, to ensure good heat dissipation, and placed in a dry ventilated place, so that the next use.Notes on the use of high frequency vibrato
28、rsNotes on the use of high frequency vibrators1. before use should check the insulation, with 500 volt megohm table of motor winding and Insulation check, the value shall not be less than 2 ohm, or its main 120 degrees with constant temperature drying box.2, the motor parts are fixed in place, screw
29、s are loose, check, confirm the error before you can test machine. When testing machines, vibrators must be placed on soft objects (sponges, etc.) and must not be allowed to be tested on cement grounds.3, the vibrator motor shaft can only be installed in horizontal direction, on the template must no
30、t allow a certain angle with the level.4, vibration motor lead wire and cable connection, fixed on the handle of the motor, so as to avoid the motor vibration and drag cable lead motor lead broken, resulting in lack of phase,Burn out motor.5, in the operation found that the screw loose should be in
31、time, finally tight, to prevent the motor into moistureproof.6, should be normal inspection of power lines, sockets, plugs, switches, wiring is firm and safe, ensure good contact.High frequency vibrator base mountingThe benefits of high frequency vibrators in combination with the control cabinetDo y
32、ou know the benefits of using a high frequency vibrator in combination with a control cabinet? It is mainly used in the prefabrication of large concrete components, and can work in harsh conditions. It is reliable, energy-saving, light weight, easy to operate and so on. The companys products cost-effective
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 建设银行2025黔南布依族苗族自治州秋招群面案例总结模板
- 工商银行2025双鸭山市秋招英文面试题库及高分回答
- 2025年3D打印技术的产业革命
- 2025年3D打印的快速原型制作技术
- 工商银行2025泉州市秋招笔试EPI能力测试题专练及答案
- 交通银行2025衡水市结构化面试15问及话术
- 邮储银行2025玉林市半结构化面试15问及话术
- 建设银行2025临汾市秋招笔试创新题型专练及答案
- 农业银行2025信阳市金融科技岗笔试题及答案
- 文化创意设计产业园入园合同5篇
- 体验单元 《分类与打包》课件 2025-2026学年大象版科学二年级上册
- 公司成立后追认合同范本
- QC/T 262-2025汽车渗碳齿轮金相检验
- 2025年交通安全问答试题及答案
- 电子厂安全考试题库及答案大全
- 导管相关性血流感染预防策略
- 2025年七年级语文上册常考必背重点知识梳理总结
- 《管理学基础与实务》 课件 曾宪达 第1-5章 管理与管理者- 目标与计划
- 茶艺知识讲座课件
- 股份赠予员工协议书模板
- 合成氨设备管理培训课件
评论
0/150
提交评论