1、PMC,部年度工作总结暨规划,半成品、成品库存,电芯状态,单位,A品,B品,08年库存,09年库存,K,K,K,K,1月,2月,3月,4月,5月,6月,7月,8月,9月,10月,11月,12月,385.63,349.11,339.50,320.60,311.96,408.17,378.60,349.55,320.11,365.33,399.64,110.18,131.66,125.22,122.26,124.39,125.41,121.92,117.74,91.26,100.71,114.80,442.37,436.78,381.28,431.50,539.47,533.17,459.36,4
2、61.73,397.73,456.73,475.52,495.80,480.77,464.71,442.86,436.35,533.58,500.52,467.29,411.37,466.04,514.44,半成品库存对比图,600,550,500,450,400,350,1月,2月,3月,4月,5月,6月,7月,8月,09年库存,08年库存,496,539,481,465,381,443,432,436,533,534,501,459,514,462,467,411,457,398,9月,10月,11月,12月,466,476,442,437,团结,正直,勤奋,2,2018,年已处理呆滞料,
3、料品编码,14-00406,400-01,69-4115,0001-01,5001-501417,114021-001,69-5106,0001-01,69-6106,0001-01,规格型号,铝箔,400mm,计量单,位,KG,数量,192,处理结果,已裁成,350mm,消耗,完,金额,77,库存原因,400,宽涂机用,不了,研发改工艺,造成,热缩管,HFT#1.5mm,保护板,铝塑膜,米,PCS,平方米,385,7000,480,已用完,处理消耗,2.6K,已用完,5184,2600,21120,黑线仔,0.6mm,PCS,32,线,长,40mm,红线仔,0.6mm,PCS,32,线,长,
4、40mm,合计金额,经品质确认不可,96,000,再使用已申请报,废,经品质确认不可,101,000,再使用已申请报,废,客户变更造,成,客户变更造,成,28904,元,团结,正直,勤奋,3,2018,年待处理的呆滞料,为,2008,年结存,品号,110061,002,规格,负极材料,石墨,FSNC-4,负极材料,石墨,CMG,SS03,高功率电解液,LD2120A,高功率电解液,LD-1349B,特殊电解液,LD-2173,SS01,绿色高温胶,25mm,透明高温胶,25mm,铝塑膜厚,150um,宽,23cm(ZY01,单位,KG,KG,KG,KG,KG,ROLL,ROLL,数量,50,2
5、9.9,36.8,28,23.47,31,5,57.5,呆料原因,研发购,研发购,研发购,研发购,工艺更改,高温电芯用,高温电芯用,单价,80,100,125,119.66,124,128.2051,290,44,业务订单取,消,业务订单取,库存金额,4000.00,2990.00,4600.00,3350.48,2910.28,3974.36,1450.00,2530.00,110061,005,110131,002,110131,003,110131,008,113011,005,113020,002,114021,002,114030,PET,保护膜,有粘性,宽度,001,10mm,厚度
6、,50um,长,200M,团结,正直,勤奋,114030,PET,保护膜,有粘性,宽度,ROLL,86,0.00,4,2018,年新产生呆滞物料,品号,115010-046,规格,单位,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,PCS,数量,408,31200,33010,820,347,448,924,5159,586,219,2315,300,2524,只有单一型号用,只有单一型号用,供应商赠送,业务员预估,呆料原因,业务订单更改,业务订单取消,业务订单取消,业务员预估,单价,3.7606,0.025,0.025,0.25,0.555,
7、0.47,0.48,0.23,0.08,0.4,0.2,0.27,库存金额,1534.32,780.00,825.25,205.00,192.59,210.56,443.52,1186.57,46.88,87.60,463.00,81.00,615.86,TPI-553450-1,8232AUFT+AO8822+PTC200+SS14+47K,UL1571#30AWG,长,40mm,两端剥线,1.5mm,镀,115050-002,锡,UL1571#30AWG,长,40mm,两端剥线,1.5mm,镀,115060-003,锡,116010-002,803030,胶壳,ABS,料(黑色,11601
8、0-008,胶壳,D09-6 ABS,内注钢片,0.15 ROHS,116010-009,TW188,胶壳,ABS,料(黑色,116010-010,858,胶壳,ABS,料(黑色,116020-002,858,专用钢片,116020-014,铝,片,29.6*27.85*0.15mm,单面带胶,116020-015,D09-6,专用钢片,U,型,72.5*37.65*0.15,不锈钢,112011-002,铝极耳,2mm*4.5mm*0.1mm,长,80mm,XT01,112011-011,铝极耳,5mm*6.5mm*0.1mm,长,65mm,XT01,112021-002,镍极耳,2mm*4
9、.5mm*0.1mm,长,80mm,XT01,只有单一型号用,0.244,112021-011,镍极耳,5mm*6.5mm*0.1mm,长,65mm,XT01,116020-020,五金片,803030,专用正负极接触片,磷铜镀金,4.16*2.7*0.15mm,合计金额,PCS,PCS,300,400,只有单一型号用,业务员预估,0.3,0.08,90.00,32.00,团结,正直,勤奋,6794.15,元,5,2018,年原材料耗用量,单位:KG/M2,原材料出库数,铝塑膜,钴酸锂LC400,电解液LD-134B,SAG23,隔离膜UB( 20U,隔离膜EN( 20U,1月,1,080,3
10、87,400,127,3,658,0,2月,3月,4月,4,358,2,019,1,200,275,14,332,6,487,5月,3,240,1,303,800,439,4,427,9,794,6月,720,560,600,424,1,004,4,715,7月,720,814,200,171,2,078,5,023,8月,4,440,2,238,1,200,888,9,600,6,336,9月,4,740,1,606,800,1,543,14,208,6,912,10月,3,204,1,728,1,400,362,8,202,7,488,11月,2,040,1,605,800,263,11,
11、095,6,769,12月,4,560,2,790,1,400,2,843,21,967,5,921,720,2,200,729,1,404,200,600,294,287,5,559,10,347,127,2,031,1月,2月,3月,4月,5月,6月,7月,8月,9月,10月,25,000,20,000,15,000,10,000,5,000,0,1月,铝塑膜,2月,3月,4月,5月,6月,SAG23,7月,8月,9月,10月,11月,12月,钴酸锂LC400,电解液LD-134B,隔离膜UB( 20U,隔离膜EN( 20U,团结,正直,勤奋,6,物料达成情况(原材料,月份,项目,采购批数
12、,按期到货批数,目标值,交期达成率,原因分析,纠正措施,结果,1月,10,10,99,100,2月,20,20,99,100,3月,42,42,99,100,4月,57,52,99,91,5月,29,27,99,93,6月,33,33,99,100,7月,26,26,99,100,8月,57,56,99,98,隔膜来,料不良,退货,OK,9月,59,59,99,10月,46,46,99,11月,29,29,99,12月,55,55,99,合计,463,455,99,98,100,100,100,100,隔膜来,隔膜来,料不良,料不良,退货,OK,退货,OK,原材料交期达成率,70,60,50,
13、40,30,20,10,0,1月,2月,3月,4月,5月,6月,7月,91,93,100,100,100,100,采购批数,目标值,按期到货批数,达成率,102,100,98,100,100,100,100,100,98,96,94,92,90,8月,9月,10月,11月,12月,99,7,物料达成情况,PACK,材料,月份,项目,1月,43,33,95,77,2月,38,32,95,84,3月,138,125,95,91,4月,153,142,96,93,5月,6月,116,85,111,82,96,96,96,96,7月,106,102,97,8月,166,151,97,9月,233,21
14、5,97,10月,11月,12月,合计,247,1604,107,167,242,1509,98,98,98,96.5,98,98,110,100,90,80,70,60,94,109,170,采购批数,按期到货批数,目标值,交期达成率,40,20000,16000,35,18000,30,14000,25,12000,10000,20,15,8000,10,6000,5,4000,2000,95,85,75,65,原因分析,纠正措施,结果,1,0.95,0.9,胶壳品质,保护板,保护板,0.85,胶壳品,不稳定,胶壳,胶壳,质不稳,标贴交期,品质不,品质不,定,过短,稳定,稳定,辅导供应,辅
15、导供,辅导供,商、交期,换厂商,应商,应商,加长,96,91,92,98,110,40,20000,1,100,35,18000,90,30,14000,0.95,25,12000,10000,0.9,80,20,15,8000,70,16000,10,6000,保护板,保护板,保护板,0.85,60,5,4000,2000,95,85,75,65,胶壳,胶壳,胶壳,品质不,品质不,品质不,稳定,稳定,稳定,辅导更,辅导供,辅导供,换供应,应商,应商,商,OK,采购批数,目标值,OK,PACK,材料交期达成率,300,250,200,150,100,50,0,95,91,84,77,93,96
16、,96,96,91,按期到货批数,达成率,92,98,98,100,98,95,90,85,80,75,1月,2月,3月,4月,5月,6月,7月,8月,9月,10月,11月,12月,团结,正直,勤奋,8,上半年主要原材料价格走势图,上半年原材料价格趋势,700,PVDF,628.3,600,534.7,500,476.2,钴酸锂,镍带,联合铜箔,负极材料,SBR乳液,锰酸锂,铝箔,石墨,宇部隔膜,ENTEK隔膜,极耳,极耳,602.6,596.7,585.0,铝镍钴锰,561.6,503.1,432.9,561.6,503.1,432.9,CMC,梅雁铜箔,电解液,导电碳墨,铝塑膜,509.0
17、,450.5,438.8,503.1,438.8,503.1,432.9,400,384.6,403.7,370.6,403.7,370.6,397.8,370.6,397.8,370.6,397.8,371.6,300,260,217,190,265,217,190,170,238,217,185,150,265,248,248,NMP,负极材料,178,150,166,150,200,宇部隔膜,ENTEK隔膜,极耳,100,0,1,2,3,4,5,6,11.0,极耳,9,下半年主要原材料价格走势图,下半年原材料价格趋势表,600,550,500,450,432.9,432.9,432.9,
18、432.9,432.9,561.6,561.6,561.6,561.6,561.6,PVDF,铝镍钴锰,钴酸锂,镍带,联合铜箔,负极材料,SBR乳液,锰酸锂,铝箔,NMP,负极材料,宇部隔膜,ENTEK隔膜,极耳,极耳,503.1,503.1,503.1,503.1,503.1,CMC,梅雁铜箔,电解液,3,7,2,5,9,3,7,2,5,9,3,7,4,5,9,3,7,4,5,9,400,350,300,2,7,0,2,6,5,2,5,0,2,4,7,2,0,0,1,7,0,2,0,0,1,7,0,2,6,5,导电碳墨,铝塑膜,铝箔,石墨,宇部隔膜,ENTEK隔膜,极耳,极耳,250,200
19、,1,8,0,2,0,0,1,8,5,1,6,8,1,6,5,150,100,50,0,1,0,7,8,2,82,5,5,4,4,2,25,5,7,4,1,5,5,1,2,1,0,6,8,8,88,6,5,1,0,6,9,0,88,6,5,1,0,6,9,0,6,5,86.5,5,5,4,4,2,7,2,5,7,4,1,5,4,25,1,0,6,9,0,6,5,88,5,5,4,4,2,7,2,5,7,4,1,4,5,25,5,5,4,4,25,5,5,4,4,2,9,5,2,5,7,4,1,5,5,3,25,2,9,5,2,5,7,4,1,5,5,10,09,年各账期采购额及图示汇总,账期,
20、第一季度采购额,第二季度采购额,第三季度采购额,第四季度采购额,年度总结,百分比,当月,7,天,当月,15,天,当月,30,天,45,天内,月结,30,天,月结,60,天,月结,90,天,2290.6,4770.0,7184.5,3900.0,235672.9,218506.0,415834.5,158916.1,147964.0,0.0,0.0,0.0,4660.2,4660.2,0.0,0.0,2450554.3,2611162.3,874879.7,903322.9,29791.9,115467.6,60656.9,16644.6,分期,COD,合计,7435787.1,4563914.
21、2,130341.9,3559631.7,54076.9,0.0,15000.0,651948.2,5761069.5,1706664.0,2841215.7,856291.7,4017461.6,11968870.8,1775078.7,5667046.7,18145.1,1028929.4,147964.0,0.06,3.47,0.50,9320.4,13664001.8,4341158.3,222561.0,199418.8,10004120.1,29635618.8,0.03,46.11,14.65,0.75,0.67,33.76,当月7天, 0.06,COD, 33.76,当月15天
22、, 3.47,当月30天, 0.50,45天内, 0.03,当月7天,当月15天,当月30天,45天内,月结30天,月结60天,月结90天,分期,COD,分期, 0.67,月结90天, 0.75,月结60天, 14.65,月结30天, 46.11,团结,正直,勤奋,11,原材料、设备、模具、辅料,PACK,总额汇总,材料类别,第一季度采购额,第二季度采购额,第三季度采购额,第四季度采购额,年度总结,百分比,原材料,6,464,455.93,3,116,010.20,9,125,843.02,4,572,696.48,23,279,005.63,78.55,设备仪器,152,761.56,33,
23、239.98,34,460.96,65,160.57,285,623.07,0.96,工模夹具,49,572.86,80,671.90,84,911.75,2.97,辅料,229,933.14,153,520.08,63,007.09,1.88,PACK,496,049.97,985,560.80,786,912.00,13.95,配件,43,013.63,合计,7,435,787.09,194,911.25,4,563,914.21,94,358.84,1.69,原材料,设备仪器,工模夹具,辅料,PACK,配件,5,667,046.73,663,930.00,111,049.29,1,865
24、,796.85,167,790.72,11,968,870.84,879,086.51,557,509.60,4,134,319.62,500,074.44,29,635,618.87,原材料, 78.55,配件, 1.69,PACK, 13.95,设备仪器, 0.96,辅料, 1.88,工模夹具, 2.97,团结,正直,勤奋,12,2018,年采购金额各部门分布状况,部门,第一季度,采购额,第二季度,采购额,第三季度,采购额,第四季度,采购额,年度总结,百分比,PMC,7,145,014.50,4,236,448.10,11,702,284.20,5,444,515.86,28,528,26
25、2.66,96.263,工程,63,253.12,管理,52,530.09,品质,7,272.66,30,349.00,9,581.03,6,710.52,生产,业务,财务,321.15,0.00,1,085.00,3,650.78,5,056.93,0.017,采购,281.00,230.00,195.00,203.54,909.54,0.003,技术,707.62,843.00,940.87,231.07,2,722.56,0.009,研发,9,594.33,37,491.70,18,607.34,22,068.89,87,762.26,0.296,合计,7,435,787.09,4,56
26、3,914.10,11,968,870.84,5,667,046.69,29,635,618.72,138,388.93,18,423.69,18,147.80,22,744.38,35,865.90,43,115.90,865.00,0.00,126,558.10,70,730.50,196,316.64,16,251.38,130,323.42,23,476.71,516,451.28,162,988.68,53,913.21,215,147.01,62,404.59,1.743,0.550,0.182,0.726,0.211,2009年度各部门采购额状况,PMC,96.26,PMC,管理
27、,工程,品质,业务,采购,研发,研发,0.30,技术,0.01,业务,0.21,采购,0.00,财务,0.02,品质,0.18,生产,0.73,工程,1.74,管理,0.55,生产,财务,技术,13,2019,年工作计划,2019,年度工作规划,1,6,物料需求滚动预测,针对主要进口原材料,PMC,每月制作三个,滚动需求给采购通知厂商备料,PMC,部,2019,年,1,7,物料损耗控制,各工段建立作业不良记录及批次结算损,耗情况,生产部,2019,年,1,8,物,流,管,理,方,面,生产计划与交期保障,PMC,结合订单、人力及设备配置。合理制,定计划及掌握资源配置,确保交期,PMC,部,201
28、9,年,1,9,优质供应商导入,持续导入品质可靠,管理规范厂商。审,核合格供应商才可以交易,采购,2019,年,2,0,采购成本控制,完善报价比价系统。主要机种每月检讨,成本异动情况,采购,2019,年,2019,年原材料月用量,材料名称,单位,1,月,2,月,3,月,4,月,5,月,6,月,7,月,8,月,9,月,10,月,11,月,12,月,月产能,钴酸锂,三元锂,NMP,铜箔,铝塑膜,隔离膜,FSN-1,电解液,Kg,Kg,Kg,Kg,Kg,Kg,350000,250000,350000,400000,500000,450000,450000,550000,600000,550000,7
29、50000,850000,2618,2618,2349,1421,6930,30800,2482,2100,1870,1870,1678,1015,4950,22000,1773,1500,2618,2618,2349,1421,6930,30800,2482,2100,2992,2992,2684,1624,7920,35200,2836,2400,3740,3740,3355,2030,9900,44000,3545,3000,3366,3366,3020,1827,8910,39600,3191,2700,3366,3366,3020,1827,8910,39600,3191,2700,
30、4114,4114,3691,2232,10890,48400,3900,3300,4488,4488,4026,2435,11880,52800,4254,3600,4114,4114,3691,2232,10890,48400,3900,3300,5610,5610,5033,3044,14850,66000,5318,4500,6358,6358,5704,3450,16830,74800,6027,5100,采购部,2019,年计划,2/4,序,项目,号,目标,具体措施,所有需报价的材料必须提供完整的成本分解表,以确保报价准确性,除个,别以市,场行情,而定的,除外,下降10,报价单需有
31、明确的付款条件,税额等,每种物料至少有2-3家供应商的议价及比价,比价议价需选择品质、价格、交期、等相关条件符合公司要求的,供应商进行议价,议价时采购人员须先将材料进行成本分析,拟定目标价同供应商进行议价,对于独家开发独家占有技术之供应商议价时,采购人员议价目标,无法达成时,可申请协助,每月采购提出所负责物料的降价计划,对所有的PACK材料报价时,采购员必须要求供应商提供详细的成本分析,不断导入有竞争优势供应商进行询价比价议价,PACK,材料,下调5,寻找性价比高的材料,来替代单价高昂的材料,4,成本,10,协同研发推动部分材料的标准化、简单化、易购化,控制,要求财务每月提出准确的付款计划,制定合理 COST DOWN 奖励制度,争取在2010年PACK每款材料在原单价的基础上能再降低5%以上,方霞黄,持续,培梅,方霞,持续,黄培梅,负责人,完成,时间,3,电芯,材料,成本,控制,17,采购部,2019,年计划,3/4,序,项目,号,目标,具体措施,新机种开模时,采购谨慎选择优质供应商配合,严格执行与供应商,签订开模协议,签订后统一归档,存放到采购部专用文件柜保管,模具开好后材料承认OK后,模具经工程验收合格后同供应商签订,每一款,模具验收报告同时签订模具保管合同和模具签收单此3份,模具,模具备,单
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- T/CAAMTB 36-2021“领跑者”标准评价要求 半挂牵引车
- T/CASME 2012-2025基于智能融合终端的三相不平衡综合治理系统
- T/BWEA 4-2025大中型泵站设备养护维修规程
- 2026年秋招:东莞交投集团面试题及答案
- T/AIMC 002.1-2021带卸液泵小型液化石油气(商品丙烷)汽车罐车信息化管理系统 第1部分:总体架构
- 广东清远市英德市2025-2026学年七年级下学期7月期末道德与法治试题(含答案)
- 2026年贵州省人教版七年级数学上册第一章整数练习题
- 幼儿园中小学交通安全教育主题班会课件
- 北师大版六年级数学上册《营养含量》
- 陕西省渭南市三贤中学2027届高三上学期9月第一次月考生物试卷(含答案)
- 桂林市赛路纳科技有限公司生物基纳米纤维素研发基地项目环评报告
- 森林消防员初级理论知识考试大纲及模拟题
- 《音响设备原理与维修》课件-第五章 功率放大器
- 卫生院安全生产责任清单
- 旋翼机的飞行原理
- 《医疗机构医疗质量安全专项整治行动方案》解读课件
- 律师事务所业务紧急预案管理制度
- 学堂在线 英文科技论文写作与学术报告 期末考试答案
- 《糖尿病治疗新进展》课件
- 《铁路机车运用管理规则》
- DB45T 1625-2024 地质灾害危险性评估规程
评论
0/150
提交评论