




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Hong Kong-Zhuhai-Macao Bridge to make the world convenient 姓名 日期 Contents 4、The Immersed Tube Tunnel 2、Features and Difficulties 5、The Significances 1、Brief Introduction 3、Two Artificial Islands 3. 工程总体方案 lThe first major combined bridge and tunnel sea-crossing project in China. lCost approximately
2、RMB 105 billion. lConstruction began in 15 December 2009 at Zhuhai. lWill reduce travel time from Hong Kong to Macau or Zhuhai from over three hours to just half an hour. 1. Brief Introduction Hong KongZhuhaiMacau Bridge: the worlds longest sea-crossing bridge, one of the most challenging constructi
3、ons of its kind undertaken in the world to date. l Two artificial islands l An immersed tube tunnel l The Y-shaped bridge 1. Brief Introduction l Total lenght: 49.97 kilometers l Underwater tunnel: 6.7 kilometers l Bridge over the sea: 23 kilometers Macau Link Road Zhuhai Link Road Offshore Bridge-a
4、nd- Tunnel HK Link Road HK port 1. Brief Introduction 1.the life span of the bridge is set at 120 years. 2.It reportedly can stand magnitude-8 earthquake, scale-16 typhoon as well as the collision with a 300,000-ton ship 1. Brief Introduction this project features a design-and-build contract, coordi
5、nation of the three regional governments in the construction and management, and close attention from the society. Moreover, there are environmental constraints as the alignment runs across the national conservation area for the Chinese white dolphins, as well as complicated navigation traffic condi
6、tions as the route crosses the busiest shipping area of the Lingding Sea. 2.Features and Difficulties Hong Kong-Zhuhai-Macao Bridge is the national key project featured with strategic significance, large involvement, highly difficult level of construction, long construction time, high requirement on
7、 technical design and environmental protection, many participant parties, complex management and coordination. 2.Features and Difficulties 3. Two Artificial Islands the West Artificial Islandthe East Artificial Island The East Island has 59 round steel cylinders圆钢筒. The West Island has 61 round stee
8、l cylinders. The diameter of a single cylinder is 22.0m, and the cylinder wall is 16mm thick. The height of round steel cylinder is 40.5m to 50.5m. The round steel cylinder weighs 445t to 507t. 3. Two Artificial Islands 4. The Immersed Tube Tunnel The water resistance ratio must be limited to 10% to
9、 prevent accumulation of sediment at the Lingdingyang Channel, otherwise it will impose serious impact on the Pearl River flow path and flood-discharge capacity, according to a government report. Due to the long distances between the cities, the project is actually a series of bridges and tunnels, c
10、onnected by artificial islands,this was the first time China has built an immersed tube tunnel (沉管隧道)in open waters. The 33 tubes will compose a 5.6-kilometer immersed-tube tunnel, which is designed to be an important part of the bridge. Each of the tube, with a weight of 80,000 tons and a length of
11、 180 meters, takes about two months to build. 4. The Immersed Tube Tunnel 5.The Significances British newspaper “The Guardian” named the megastructure one of its “seven wonders of the modern world near completion.” It will be the first new land transport link between the east and west coasts of the
12、Pearl River, The bridge will benefit the economic development of the whole of the Delta. The bridge will create a regional transport network, improving upon what is considered to be a weak land transport network currently in place The End! Thanks for your attention! Contents 4、The Immersed Tube Tunn
13、el 2、Features and Difficulties 5、The Significances 1、Brief Introduction 3、Two Artificial Islands Hong Kong-Zhuhai-Macao Bridge is the national key project featured with strategic significance, large involvement, highly difficult level of construction, long construction time, high requirement on tech
14、nical design and environmental protection, many participant parties, complex management and coordination. 2.Features and Difficulties The water resistance ratio must be limited to 10% to prevent accumulation of sediment at the Lingdingyang Channel, otherwise it will impose serious impact on the Pear
15、l River flow path and flood-discharge capacity, according to a government report. Due to the long distances between the cities, the project is actually a series of bridges and tunnels, connected by artificial islands,this was the first time China has built an immersed tube tunnel (沉管隧道)in open waters. The 33 tubes will c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 公司退股申请协议书范本
- 人造棉库存出售合同范本
- 合伙人开店协议合同范本
- 公司项目员工投资协议书
- 五谷杂粮出售协议合同书
- 厂房承包给别人合同范本
- 企业股份合同协议书范本
- 农民工贷款购车合同范本
- 原材料代理收购合同范本
- 农村租地种玉米合同范本
- 2025-2030年中国城市更新行业市场深度调研及市场前瞻与战略布局策略研究报告
- 应急响应第一人考试试题及答案
- 门窗店入股合同协议书
- T/CIE 171-2023企业级固态硬盘测试规范第7部分:功耗能效测试
- 2025年采购管理专业考试题及答案
- 实验室安全操作规程
- 2025-2030中国DCS控制系统行业市场现状分析及竞争格局与投资发展研究报告
- 叉车基本技能培训课件
- 2024初级注册安全工程师笔试真题解析
- 高三数学教学经验交流发言稿
- 沪科版八年级物理上册教学计划(含进度表)
评论
0/150
提交评论