




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、築池網fhulo ng.Gom建设工程设计合同Construetion Project Design Contract项目名称:Project Name:项目建设地点:Project Locatio n:合同编号:Con tract No.:设计证书等级:Grade of Desig n Lice nse:委托方:Clie nt:承接方:Desig n Firm:签订日期:Sig ned on:委托方(甲方):Client (Party A):承接方(乙方):Design Firm (Party B):築池網 fhulong. Gom甲方委托乙方承担XX项目(一期)工程设计,经双方协商一致,签
2、订本合同。This Con tractParty A en trusts Party B to un dertake the desig n for .is made by the two parties after their mutual agreeme nt.第一条本合同依据下列文件签订Articled This Con tract is made on the basis of the followi ng docume nts:1.1中华人民共和国合同法、中华人民共和国建筑法和建设工程勘察设计 市场管理规定。1.1 The Con tract Law of the Peoples R
3、epublic of Chin, The build ing regulati ons of the Peoples Republic of China and The developmental Law of the Peoples Republic of Chi na.1. 2国家及地方有关建设工程勘察设计管理法规和规章。1.2 Releva nt Build ing & Desig n Codes and Regulati ons of the State and of the Shan ghai Muni cipality1. 3建设工程的相关批准文件。1.3 The approval
4、 docume nts that are required for this con struct ion project.第二条 本合同工程设计项目的名称、地点、规模、投资、内容及标准Article2 The name, location, size, investment sum, function, design contents and sta ndards:2.1工程项目的名称:XX项目(一期)2.1 Project n ame:2.2 1程项目的地点:2.2 Project locatio n:2.3 1程项目的规模:总建筑面积约 平方米(其中地下面积约 平方米), 高度米。2.3
5、 Project size: The total floor aream2 (of which the floor area ofisapproximately2the underground area is m), the total height is m .2. 4工程特征及附注说明:商业办公综合楼2.4 Project features & remarks: A commercial cum office buildi ng complex2.5 1程项目的投资总额:控制在亿元人民币以下2.5 Project in vestme nt in total:C on trolled Wit
6、h in millio n yua n RMB2.6 1程项目的设计内容及标准:红线内的建筑、结构、机电、总体设计(包括3000卅人防设计,不包括精装修设计、园艺设计和艺术泛光照明等专业设计),施工图设计约为70000川(不包括五层到七层的S0H0区域)。2.6 Desig n requireme nts and scope of work: The scope of work shall in elude master pla nning and build ing desig n that are located with in the boun dary line. For build
7、ing desig n it shall comprise of the architectural, structural & M/E work, (in clud ing 3, 000m of Air- raid shelter design, but excluding other specialists design, such as the Luxurious Interior Design, Landscaping Design and Facade Flood Lighting Design)The total floor area during the working draw
8、ing stage is 70,000 m2(excluding the SOHO Area, which is starting from the fifth floor level to the seventh floor level)第三条 甲方向乙方提交的有关资料及文件(见下表)Article3 Releva nt docume nts which shall be issued by Party A to Party B:序号资料及文件名称份数提交时间备注S/NXame of documentsCopiesSubmission DateRemarks1政府批文1全套Governmen
9、t Approval DocumentsFull set2设计任务书1)esign Instructions3规划红线图1lan of Property Line4水、电、气源落实情况说明1)esign Information of Utilities (water,electricity & gas supply etc.)5规划设计要求1Requirements from the Government6地址勘探报告Soil Investigation Report17原打入桩的资料Design Information of As Built pilings18概念方案Concept Des
10、ign Information1第四条 乙方向甲方交付的设计文件(见下表)Article4. Desig n docume nts which shall be submitted by Party B to Party A(listed as follows):序号设计文件名称阶段份数提交时间备注S/NDesign DocumentsPhaseCopiesSubmission DateRemarks1方案设计文件方案1030天内Schematic Design DocumentsSchematicWithin 30 days2初步设计文件扩初1530天内D D DocumentsE. P.
11、D.Within 30 days3初步概算文件扩初27天内Preliminary EstimateE. P. D.Within 7 days4施工图设计施工图15桩位图扩初批准后15天Working DrawingsConstructionThe piling drawings will be submittedDocumentswithin 15 daysafter the D. DApproval其余扩初批准后60天The rest of the drawings will besubmitted within 60 days after theD. D. Approval5光盘文件施工图
12、1待定CD filesC. D.To Be DecidedNotes: The design documents shall be prepared in compliance with the Regulations on detail requireme nts of desig n docume nts for con strueti on project (issued by Mini stry of con struet ion dated in April, 2003).第五条设计费用及支付方法Article 5. Desig n fee and the mode of payme
13、 nt:5. 1甲方应支付本合同项目的设计费为 。(含所有乙方应缴纳的税费及其它政府规定应由乙方交纳的款项)5.1 Party A shall pay the design fee of RMB yuan for this project to Party B (this fee shall in elude taxes and all other duties that should be paid by Party B as required by the gover nment regulati on s).5. 2支付方法(见下表):5.2 The payme nt method is
14、 (listed as the followi ng):序号S/N阶段Phase金额(元)Amount(yuan)说明Remarks1方案阶段合同签订后30日内Schematic design30 days after Contract is signed2扩初阶段扩初批准后30日内Design Development30 days after D. D Approval3施工图阶段施工图提交审图后30日内Construction Document30 days after the C D Approval bythe Authority4施工配合总包施丄合同签id后30 11内施工配合Con
15、struction30 days after the main contractor has585, 000. 00coordinationbeen awarded兀工程开工后,按季度分五期支付,每次支付70, 000. 00元5 installment payment shall bemade quarterly throughouttheentire constructionperiodEachinstallment amounting to7, 000. 005竣工验收阶段竣工验收后The Completion &After the completion and handingHandi
16、ng over stageover of the project第六条双方责任Article6 Resp on sibilities of both parties:6. 1甲方责任6.1 Responsibilities of Party A:6. 1. 1甲方按本合同第三条规定的内容,在规定的时间内向乙方提交资料及文件,并对 其完整性、正确性及时限负责。甲方提交上述资料及文件超过规定期限15天以内,乙方按本合同第四条规定交付设计文件时间顺延;超过规定期限15天以上时,乙方有权重新确定提交设计文件的时间。6.1.1 Accord ing to the contents stated in A
17、rticle 3 of this Con tract, Party A shall submit materials and documents to Party B within the stipulated time as described and shall be responsible for the completeness, correctness and validity of such materials and docume nts In the eve nt that Party A has delayed the issua nee of such materials and documents, but not exceeding 15 days from the stipulated time, Party B could con seque ntly postp one the submittai of the desig n docume nts as stipulated in Article 4 of this Contract.In case that Party A has delayed
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 培训学校母亲节
- 2026届湖南省娄底市娄星区英语九上期末教学质量检测模拟试题含解析
- 足球培训机构合作
- 2026届北京市海淀中学化学九年级第一学期期末达标检测试题含解析
- 北京延庆县联考2026届英语九年级第一学期期末监测模拟试题含解析
- 2026届重庆市南开中学化学九上期中考试模拟试题含解析
- 湖北省武汉市楚才中学2024-2025学年八年级上学期10月月考物理试题(无答案)
- 河北省沧州市盐山中学2025-2026学年八年级上学期第一次月考物理试题(含解析)
- 导游工作十道面试题及答案
- 2025年事业单位工勤技师考试题库(附答案)
- 贵州贵州贵安发展集团有限公司招聘考试真题2024
- 跨境人民币合同协议
- 三方散伙协议合同协议
- 产程中饮食管理
- 小学生语言文明教育课件
- 出科考核规范
- 日结工资合同(2025年版)
- 免疫定性实验性能验证
- 在线网课学习课堂《人工智能(北理 )》单元测试考核答案
- 第24课《古诗词五首:十五从军征 》课件 2024-2025年统编版语文九年级下册
- 设备质量检测报告模板
评论
0/150
提交评论