1、blind board operational security requirements 1. blocking blind board operations required to handle blocking blind board operating license, no blocking blind board operating license are not allowed to smoke blocking blind board operations. 2. it is strictly prohibited to alter, lent the blocking bli
2、nd board operating license. content conversion and expansion of operations or transfer jobs site, again for blocking blind board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right
3、 to refuse to work. 4. toxic gas piping, equipment blocking blind board, non-irritant gas pressure should be less than 200 mm hg; irritant gas pressure should be less than 50 mm hg; gas temperature should be less than 60 degrees. 5. technical department responsible for drawing blind location map, nu
4、mbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind board work, and to designate a person respons
5、ible for monitoring. guardians are advised by experienced officers. , guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. guardians must adhere to the scene, and emergency treatment. job guardian sha
6、ll not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and environment department, is responsible for personnel. involving the entire production system, head of the technical department must be present. 8. in place
7、s where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind board operation shall follow the provisio
8、ns of license for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind board
9、 operations. when plugging multiple blind, blind to blind location map and plates number by construction general manager, unity of command assignments. 12. signs in each blocking blind board shows that blind location. (c) the blocking blind board permits the management of 1. . blind location map, im
10、plement security measures, after the approval of the technical department, assignment units (staff) to confirm. job complex, dangerous places required security audits of the department of environmental protection, the company in charge of safety vice president for approval. 4. approve a good blockin
11、g blind board operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical check, activity handed the blind location technology. 6. work permits management should establish the ticket file (inventory), the ticke
12、t is kept for 3 years. the lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of accidents, the system is formulated. second, the scope of application of this system applies to all companies within
13、the lifting operation. third, lifting a license of graded credit three levels of management: (i) general equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, technology review, workshop director for approval; (b) the rules of weight equal to or greater than 1 ton less tha
14、n 10 tons of weight lifting, hoisting, approved by the workshop, equipment management department for approval. (c) of over 10 tons and heavy lifting operations projects or construction under the special conditions, shall prepare lifting plan, permit to work submitted to company executives and safety
15、 equipment, the joint security sector review competent after assistant general manager approval. four, lifting safety requirements 1. lifting weights greater than or equal to 10 tonnes of the object and the subject of civil engineering structures, hoisting construction plan shall be prepared. load i
16、s less than 10 tonnes, but small complex shapes, stiffness, length-diameter ratio, precision precious, under the special conditions of construction, should also prepare construction programmes. hoisting construction programmes examined by the project authorities, submitted to the competent vp approv
17、al to be implemented. 2. lifting operations must set up the alert line and set up special care, guardianship personnel must wear armbands, lifting regional staff out of bounds; 3. lifting operations must be provided for lifting loads, slings, rigging and economic calculation options, do not overload
18、. when lifting heavy objects close to or reach the rated lifting capacity, check brakes, low height, short stroke after the load test, then smoothly lifted. large and medium sized equipment before lifting, load test should be carried out. try hanging height for about 0.2m and then conduct a reliabil
19、ity check (including the selection and calculation of safety factor). overload lifting is strictly prohibited. 4. before lifting must pad the wood and the wood used must be of adequate size (be sure to over 1 m); when lifting requires fire escape, you must contact the circuit breaker in accordance w
20、ith the provisions; 5. lifting operations must be run on all kinds of hoisting machinery parts, safety devices as well as slings, rigging a detailed security checks, security devices for lifting equipment is sensitive and reliable, no illness. must try before lifting crane, confirmed before they can
21、 work. 6. lifting operations, removed platform guardrail must be restored (the bolt activity fence removal is strictly prohibited); 7. lifting operations, should have adequate lighting at night, outdoor . 16, lifting the approval procedure is not complete, security measures are not 目目 录录 1.1 系统组成3 1
22、.2 8086 实验机性能特点3 1.3 基本实验项目4 第二章第二章 系统配置和安装系统配置和安装55 2.1 usb 驱动安装5 2.2 软件安装7 2.3 硬件安装7 2.4 如何进行微机外围接口实验7 2.5 8086 串行软件介绍8 第三章第三章 实验机模块原理实验机模块原理1111 3.1 可编程并行口 8255 模块11 3.2 双色 led 灯模 块11 3.3 单色 led 灯模 块11 3.4 电位器11 3.5 分频器模块12 3.6 单脉冲电路12 3.7 步进电机驱动电路12 3.8 a/d 转换器模块12 3.9 d/a 转换器模块13 3.10 8251 可编程串
23、行通讯模块13 3.11 可编程定时/计数器模块13 3.12 8259 中断控制器实验模块14 3.13 开关量输入实验模块14 第四章第四章 软件实验部分软件实验部分1515 实验一 两个多位十进制数相减实验15 实验二 两个数相乘的实验19 实验三 bcd 码相乘实验20 实验四 字符匹配程序22 实验五 字符串匹配程序23 实验六 从键盘输入数据并显示25 实验七 字符和数据的显示程序27 实验八 响铃程序30 实验九 接收年、月、日信息显 示31 实验十 字母的大小写转换35 实验十一 保留最长最短行输入字符38 实验十二 计算机钢琴的程序41 blind board operati
24、onal security requirements 1. blocking blind board operations required to handle blocking blind board operating license, no blocking blind board operating license are not allowed to smoke blocking blind board operations. 2. it is strictly prohibited to alter, lent the blocking blind board operating
25、license. content conversion and expansion of operations or transfer jobs site, again for blocking blind board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right to refuse to work.
26、 4. toxic gas piping, equipment blocking blind board, non-irritant gas pressure should be less than 200 mm hg; irritant gas pressure should be less than 50 mm hg; gas temperature should be less than 60 degrees. 5. technical department responsible for drawing blind location map, numbers the blind, co
27、nstruction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind board work, and to designate a person responsible for monitoring
28、. guardians are advised by experienced officers. , guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. guardians must adhere to the scene, and emergency treatment. job guardian shall not leave the jo
29、b site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and environment department, is responsible for personnel. involving the entire production system, head of the technical department must be present. 8. in places where inflammable
30、 and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind board operation shall follow the provisions of license for w
31、orking at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind board operations. when p
32、lugging multiple blind, blind to blind location map and plates number by construction general manager, unity of command assignments. 12. signs in each blocking blind board shows that blind location. (c) the blocking blind board permits the management of 1. . blind location map, implement security me
33、asures, after the approval of the technical department, assignment units (staff) to confirm. job complex, dangerous places required security audits of the department of environmental protection, the company in charge of safety vice president for approval. 4. approve a good blocking blind board opera
34、ting license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical check, activity handed the blind location technology. 6. work permits management should establish the ticket file (inventory), the ticket is kept for 3 yea
35、rs. the lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of accidents, the system is formulated. second, the scope of application of this system applies to all companies within the lifting operati
36、on. third, lifting a license of graded credit three levels of management: (i) general equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, technology review, workshop director for approval; (b) the rules of weight equal to or greater than 1 ton less than 10 tons of weight
37、 lifting, hoisting, approved by the workshop, equipment management department for approval. (c) of over 10 tons and heavy lifting operations projects or construction under the special conditions, shall prepare lifting plan, permit to work submitted to company executives and safety equipment, the joi
38、nt security sector review competent after assistant general manager approval. four, lifting safety requirements 1. lifting weights greater than or equal to 10 tonnes of the object and the subject of civil engineering structures, hoisting construction plan shall be prepared. load is less than 10 tonn
39、es, but small complex shapes, stiffness, length-diameter ratio, precision precious, under the special conditions of construction, should also prepare construction programmes. hoisting construction programmes examined by the project authorities, submitted to the competent vp approval to be implemente
40、d. 2. lifting operations must set up the alert line and set up special care, guardianship personnel must wear armbands, lifting regional staff out of bounds; 3. lifting operations must be provided for lifting loads, slings, rigging and economic calculation options, do not overload. when lifting heav
41、y objects close to or reach the rated lifting capacity, check brakes, low height, short stroke after the load test, then smoothly lifted. large and medium sized equipment before lifting, load test should be carried out. try hanging height for about 0.2m and then conduct a reliability check (includin
42、g the selection and calculation of safety factor). overload lifting is strictly prohibited. 4. before lifting must pad the wood and the wood used must be of adequate size (be sure to over 1 m); when lifting requires fire escape, you must contact the circuit breaker in accordance with the provisions;
43、 5. lifting operations must be run on all kinds of hoisting machinery parts, safety devices as well as slings, rigging a detailed security checks, security devices for lifting equipment is sensitive and reliable, no illness. must try before lifting crane, confirmed before they can work. 6. lifting o
44、perations, removed platform guardrail must be restored (the bolt activity fence removal is strictly prohibited); 7. lifting operations, should have adequate lighting at night, outdoor . 16, lifting the approval procedure is not complete, security measures are not2 实验十三 排序实验43 实验十四 学生成绩名次表实验46 实验十五 设
45、置光标的实验50 实验十六 清除窗口的实验51 实验十七 计算 n!的实验-52 实验十八 写文件实验55 实验十九 读文件实验59 实验二十 显示目录的实验62 第五章第五章 硬件实验部分硬件实验部分6464 实验一 双色灯实验64 实验二 开关状态显示实验67 实验三 8279 键盘显示实验68 实验四 定时器/计数器实验71 实验五 a/d 转换实验72 实验六 d/a 转换实验73 实验七 8259a 硬件中断实验74 实验八 直流电机驱动实验79 实验九 步进电机驱动实验82 实验十 8253 计数器实验86 实验十一 力测量实验88 实验十二 温度测量实验90 实验十三 8237d
46、ma 实验(用 dma 进行存贮器到存贮器传送数据)93 实验十四 8237dma 实验(用 dma 进行存贮器到 io 设备传送数据)96 实验十五 8251 可编程串行通讯实验98 实验十六 以循环方式工作的单机“8259 中断”实 验100 实验十七 8251“自发自收”实 验101 实验十八 继电器控制实验103 附录一附录一 直流电机参数直流电机参数105105 附录二附录二 步进电机参数步进电机参数105105 附录三附录三 电阻应变计(压力传感器)参数电阻应变计(压力传感器)参数105105 附录四附录四 热每电阻参数对应表热每电阻参数对应表105105 blind board
47、operational security requirements 1. blocking blind board operations required to handle blocking blind board operating license, no blocking blind board operating license are not allowed to smoke blocking blind board operations. 2. it is strictly prohibited to alter, lent the blocking blind board ope
48、rating license. content conversion and expansion of operations or transfer jobs site, again for blocking blind board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right to refuse t
49、o work. 4. toxic gas piping, equipment blocking blind board, non-irritant gas pressure should be less than 200 mm hg; irritant gas pressure should be less than 50 mm hg; gas temperature should be less than 60 degrees. 5. technical department responsible for drawing blind location map, numbers the bl
50、ind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind board work, and to designate a person responsible for mon
51、itoring. guardians are advised by experienced officers. , guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. guardians must adhere to the scene, and emergency treatment. job guardian shall not leave
52、 the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and environment department, is responsible for personnel. involving the entire production system, head of the technical department must be present. 8. in places where infl
53、ammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind board operation shall follow the provisions of licens
54、e for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind board operations.
55、 when plugging multiple blind, blind to blind location map and plates number by construction general manager, unity of command assignments. 12. signs in each blocking blind board shows that blind location. (c) the blocking blind board permits the management of 1. . blind location map, implement secu
56、rity measures, after the approval of the technical department, assignment units (staff) to confirm. job complex, dangerous places required security audits of the department of environmental protection, the company in charge of safety vice president for approval. 4. approve a good blocking blind boar
57、d operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical 华中科技大学 - - 惠世科技教育产品之计算机技术系列微机接口实验教材 check, activity handed the blind location technology. 6. work permits management should establish the ticket fil
58、e (inventory), the ticket is kept for 3 years. the lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of accidents, the system is formulated. second, the scope of application of this system applies
59、to all companies within the lifting operation. third, lifting a license of graded credit three levels of management: (i) general equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, technology review, workshop director for approval; (b) the rules of weight equal to or gre
60、ater than 1 ton less than 10 tons of weight lifting, hoisting, approved by the workshop, equipment management department for approval. (c) of over 10 tons and heavy lifting operations projects or construction under the special conditions, shall prepare lifting plan, permit to work submitted to compa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 联名推广协议书
- 砂石提成协议书
- 京喜协议书价
- 特色小镇 协议书
- 商标注册委托代理协议书
- 光伏地块投资协议书
- 临床医学专业医学影像学习题集
- 2025年短视频打赏合同协议
- 2025餐饮技术入股合同协议书协议合同协议书书
- 2025年短视频MCN机构合同协议(内容制作)
- 2025中国K12课外辅导市场消费特征与行业趋势研究报告
- 2026年北京市高考语文总复习:专题11 文学类文本阅读(选修上册课内阅读)(解析版)
- 医美医疗安全防范课件
- 物业小区电梯故障应急预案
- 2025年烟草制品购销员二级(复核)练习题
- 2021新《安全生产法》培训课件
- 2025年广州公务员行测真题【完整+答案+解析】
- 山脚树煤矿924事故调查报告
- 2025年一级建造师《(机电工程)管理与实务》考试真题及答案
- 2025年食品安全考试试题(答案+解析)
- 论文写作讲座课件
评论
0/150
提交评论