1、Disaster Recovery PlanRoles and ResponsibilitiesDisaster Recovery Coordinator 1Damage Assessment Team 1Executive Team 1Restoration Team 2Operations Team 3Customer Support Team 3Salvage/Reclamation Team 4Administrative Support Team 4Disaster Recovery CoordinatorFunctions: The responsibility for plann
2、ing, coordinating, and managing this program is assigned to the Disaster Recovery Coordinator with assistance from technical advisors.Damage Assessment TeamFunction: The Damage Assessment Team assesses the extent of the damage to the Data Center, reports to the Executive Team, and makes a recommenda
3、tion on declaring a disaster.The major pre-disaster responsibility : Determine appropriate considerations/criteria for identifying the extent of the damage and the estimated duration of the outage.The disaster responsibilities and actions are:? Receive the first alert regarding the disaster.? Ensure
4、 that the XYZ COMPANY police/fire departments have been notified.? Coordinate with the police and/or fire department to provide for safety, security, and access to the damaged facility.? Notify the IT DEPARTMENS Director or alternate regarding the potential disaster.? Assess the damage to each area
5、of the computer facility.? Brief the Director or alternate, communicating the recommendation(s).Executive TeamFunction: The Executive Team officially declares that a disaster has occurred, authorizes the execution of the Disaster Recovery Plan, and oversees the execution of the plan during the emerg
6、ency.The pre-disaster responsibilities are:? Approve the IT DEPARTMENS Disaster Recovery Plan and all major or material modifications to the plan.? Establish primary and alternate disaster command posts, ensuring that the posts are adequately prepared for a disaster.The disaster responsibilities and
7、 actions are:? Notify the hot site and the off-site storage facility of a possible disaster.? Review the report of the Damage Assessment Team.? Declare a disaster:a) establish the command post and communications,b) activate the Functional Teams,c) inform the hot site of the disaster declaration, and
8、d) initiate the shipment of the backup materials to the hot site.? Notify the Key Executives.? Monitor the performance of the Disaster Recovery Teams and the execution and effectiveness of the Disaster Recovery Plan.? Keep senior XYZ GROUP management and the designated Information Officer/alternate
9、informed of material/sensitive matters.Restoration TeamFunctions: The Restoration Team brings the hot site/alternate XYZ COMPANY email systems to operational mode by managing the relocation of services to the hot site/alternate email processing site, initiating and managing the recovery procedures a
10、t the hot site, and responding to operational problems at the hot site. The Restoration Team also manages the relocation of services back to the Data Center.The pre-disaster responsibilities are:? Establish and maintain the recovery procedures for the hot site/email systems.? Manage and maintain the
11、 backup procedures.? Establish and maintain the disaster recovery data communications link to the hot site. ? Plan and conduct regular hot site/email recovery tests.The disaster responsibilities and actions are:? Coordinate recovery procedures with hot site personnel.? Restore the operating systems
12、environments on the hot site/alternate email processing site host systems.? Establish the data communications link to the hot site.? Verify the operating systems and all other system and communication software are working properly.? Restore the application/mailbox files.? Support the operations at t
13、he hot site by resolving problems and monitoring and maintaining the data communications link to the hot site.? Support operations at the alternate email processing site by resolving problems.? Manage the backup tapes that were sent to the hot site.? Ensure all required backups of the entire system
14、are completed in preparation for leaving the hot site.? Coordinate the return of the IT DEPARTMENS/customer media to the Data Center. ? Install all XYZ COMPANY system/messaging software at the Data Center.Operations TeamFunctions: The Operations Team assists in the recovery operations and manages th
15、e operations of the computer systems at the hot site.The pre-disaster responsibilities are:? Ensure that appropriate backups are made on the prescribed, rotating basis and are ready to be taken off-site.? Maintain current, up-to-date systems operations documentation, ensuring that this documentation
16、 is suitably stored off-site.The disaster responsibilities and actions are:? Provide assistance to the Restoration Team in the restoration of the system software and customer files, as required.? Run system and operation jobs, as required.? Implement and maintain a problem log.? Provide information
17、to the Customer Support Team regarding the status of the system, operations, and the customer jobs.? Effect the transfer of media and print output from the hot site to suitable customer pickup location(s).? Coordinate the shutdown of the hot site operations and the transfer back to the Data Center.C
18、ustomer Support TeamFunctions: The Customer Support team provides assistance to customers during the disaster from the time the disaster is declared until operations resume at the Data Center.The pre-disaster responsibilities are:? Advise and consult with application customers regarding their disast
19、er recovery requirements.? Assist application customers during disaster recovery tests.The disaster responsibilities and actions are:? Notify participating application customers that a disaster has been declared.? Advise customers of the disaster recovery system status, availability, and accessibili
20、ty.? Provide problem diagnosis and resolution guidance/assistance to application owners and their customers.Salvage/Reclamation TeamFunctions: The Salvage/Reclamation Team manages the restoration or rebuilding of the Data Center.The major pre-disaster responsibility is to maintain current copies of
21、equipment inventory lists, physical plant layout/diagrams (floor plans), and other pertinent documentation describing the IT DEPARTMENS production hardware configuration in a suitable offsite location.The disaster responsibilities and actions are:? After the Restoration Team has implemented recovery
22、 operations at the hot site, assess the damage to the Data Center and report the damage, with recommendations, to the Executive Team.? Organize the recovery of salvageable equipment, supplies and the physical plant.? Initiate, coordinate, and expedite construction and work requests to prepare the XY
23、Z COMPANY facility to receive equipment, supplies, tools, machinery, and utilities (electrical power, telephones, network connectivity, air conditioning, plumbing, water, gas, and HVAC).? Order and expedite replacements for unusable IT equipment.? Monitor the construction of the new/repaired facility, and the installation of all utilities and other essentials.? Monitor the installation of computers, peripherals, and other IT equipment.? Advise the Executive Team regarding status, progress, and schedules, and any problems associated with the construction/reconstruction and in
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 46410-2025风险管理风险预警
- GB/T 46247-2025风能发电系统基于地面遥测技术的风能资源测量
- 公司岗位聘用合同范本
- 创业加盟项目合同范本
- 双方合作养牛合同范本
- 共享大棚租赁合同范本
- 光盘加工供货合同范本
- 叉车销售买卖合同协议
- 合同增加项目补充协议
- 前台教务人员合同范本
- 学生会纪检部部长竞选
- DL∕T 411-2018 电力大屏幕显示系统通 用技术条件
- 【新教材】冀教版(2024)七年级上册英语期中复习:Unit 1-4+期中共5套测试卷汇编(含答案)
- 【难点突破】指数复合型函数的对称性(教师版)
- 甲乙双方合作合同协议范本
- 运用学习任务群理念助力学生轻松学拼音
- 第4课《社会主义基本经济制度》第三框《社会主义市场经济体制》课件(高教版2023·基础模块)
- T CEC站用低压交流电源系统剩余电流监测装置技术规范
- 全球及中国牛肉行业市场现状供需分析及市场深度研究发展前景及规划可行性分析研究报告(2024-2030)
- MOOC 社会心理学-西安交通大学 中国大学慕课答案
- 单细胞基因组学与转录组学分析
评论
0/150
提交评论