Incoming Inspection_第1页
Incoming Inspection_第2页
Incoming Inspection_第3页
Incoming Inspection_第4页
Incoming Inspection_第5页
已阅读5页,还剩3页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、company namecompany group, division, locationdocument title: incoming inspectiondocument number:document numberdocument filename:document filenamecontrolled copy/ master copystamp hereotherstamp hererevision levelrevision datedco/econumberdescription of revisionrevision authordraftdd/mm/yyyy-00000dr

2、aftauthor name1.00dd/mm/yyyy-00000initial releaseauthor nametable of contents1.0purpose32.0scope33.0definition of terms33.1goods33.2production material33.3process material33.4inspection criteria34.0responsibilities34.1quality assurance (qa)34.2shipping/receiving34.3engineering35.0references36.0proce

3、dure46.1first article inspection (if applicable)46.2documentation verification46.2.1verify engineer drawings and specifications46.2.2verify material identification label accuracy46.2.3verify certification receipt and accuracy46.2.4verify markings and packaging46.2.5verify approved supplier status46.

4、2.6verify receipt record (rr) accuracy and completeness56.2.7verify expiration date56.3inspect material56.3.1material inspected at the supplier56.3.2inspect at incoming inspection56.3.3accept56.3.4reject56.3.5release prior to inspection56.4disposition66.4.1accepted material66.4.2rejected material67.

5、0flow chart77.1incoming inspection flow chart78.0appendix88.1guidelines for writing inspection criteria81.0 purposethis document establishes an inspection system and documentation requirements for incoming (received) material requiring inspection.2.0 scopethis procedure applies to production and pro

6、cess material received at the facilities of company name. this procedure also may be applied to other received materials at the discretion of the purchasing requisitioner.3.0 definition of terms3.1 goodsmaterial with utility and/or intrinsic value purchased by, internally produced by, and/or supplie

7、d to a company.3.2 production materialmaterial that becomes part of a shippable product.3.3 process materialmaterials that are required in the manufacturing process, but do not become part of the shippable product.3.4 inspection criteria the criteria used to inspect and accept or reject production a

8、nd process material. inspection criteria must define the attributes or features to inspect, the sampling plan, and the accept/reject criteria.4.0 responsibilities4.1 quality assurance (qa)quality assurance is responsible for the timely inspection of incoming material, and for notifying inventory whe

9、n incoming inspection is complete. quality assurance is also responsible for determining incoming material inspection criteria which are adequate and appropriate for the material being inspected, taking into account recommendations from engineering.4.2 shipping/receiving shipping/receiving is respon

10、sible for all normal receiving activities, including material receipt, creation of a receipt record (rr), and location of material requiring inspection at incoming inspection (along with all certifications, test results and other related documentation for the shipment). when material requiring incom

11、ing inspection has been received, receiving moves it to incoming inspection.shipping/receiving is also responsible for moving and properly locating material after inspection, based on inspection results.4.3 engineeringengineering is responsible for recommending key attributes to inspect for all comm

12、ercial items and customdesigned items released by engineering.5.0 referencesmaterial review boardfirst article inspectionacceptance sampling plansquality recordspart history recordfirst article inspection data sheetinspect inquiry for non-inventory parts6.0 procedurenote: before opening any packages

13、 and handling material review and follow all handling precautions in the inspection criteria for the material.when notified that material that requires inspection has been received, gather relevant documentation for the material, which may include inspection criteria, component specification, purcha

14、se order, vendor history, and certificate of compliance or test. documentation may be paper or electronic format.6.1 first article inspection (if applicable)if first article inspection is required, perform according to the first article inspection procedure. see that procedure for guidelines on when

15、 to perform first article inspection.if first article inspection is not required, continue with this procedure.6.2 documentation verificationbegin an inspection report (first article or part history record) for the material. record item number, item description, revision (if applicable), date receiv

16、ed, quantity received, lot number, purchase order (po) number, supplier id, and inspection document(s) and revision. record the following documentation verification results on the inspection report.6.2.1 verify engineer drawings and specificationsverify that the engineering drawings and specificatio

17、ns used for inspection are at the appropriate revision level.6.2.2 verify material identification label accuracycompare the documentation and the material received to the material identification label(s), to assure that each label is accurate. have shipping/receiving correct any label discrepancies.

18、6.2.3 verify certification receipt and accuracyverify that material certification was received. assure that the certification matches the material received. notify purchasing immediately if certification is missing or incorrect as required. qa will contact the vendor and request a faxed copy of the

19、certification. reject material for which certification cannot be obtained.6.2.4 verify markings and packagingverify all material markings and/or packaging required by the drawing, component specification or purchase order.6.2.5 verify approved supplier statusverify that the material was purchased fr

20、om an approved supplier. verify that manufacturer and manufacturer part number and/or supplier and supplier part number are identical to those listed in the component specification.6.2.6 verify receipt record (rr) accuracy and completenessverify that the attached receipt record is accurate and compl

21、ete.6.2.7 verify expiration datefor material with a finite shelf life, verify that the correct expiration date has been recorded on each package. record the expiration date on the part history report or first article inspection report.6.3 inspect material6.3.1 material inspected at the suppliera com

22、pany name onsite inspector or quality assurance may inspect and accept material at the supplier prior to shipment to company name. any such material received properly labeled as accepted and accompanied by (or received separately) a completed part history record or first article inspection report fr

23、om the inspector, has passed incoming inspection and need not be reinspected. go to disposition of accepted material in this procedure to properly disposition material accepted at the supplier.6.3.2 inspect at incoming inspectioninspect the material according to its inspection criteria.inspection cr

24、iteria are found in the part history file and may be determined by quality assurance and/or engineering. randomly select any samples. record inspection results on the inspection report, attaching additional sheets as necessary, and numbering each sheet page _ of _.” highlight any nonconformities.6.3

25、.3 accepta shipment of material is accepted if document verification is satisfactory, and the material meets or exceeds all of the acceptance criteria in the inspection criteria. for sample inspection, acceptance criteria is met if the number or percentage of nonconformities found in the sample is l

26、ess than or equal to the acceptance number for the sampling plan. disposition as nonconforming material any sample material found with nonconformities.6.3.4 rejecta shipment of material is rejected if document verification is not satisfactory, or if the material does not meet one or more of the acce

27、ptance criteria in the inspection criteria. for sample inspection, acceptance criteria is not met if the number or percentage of nonconformities found in the sample is greater than or equal to the rejection number for the sampling plan.6.3.5 release prior to inspectionin rare instances, a shipment o

28、f material will be needed by production before incoming inspection is complete. at the discretion of the quality assurance director, part or all of the shipment (less samples retained by quality assurance for inspection) may be released to production, providing a positive recall system is in place t

29、o identify and recover the shipment if it is rejected when inspected. lot tracing the shipment to all stocking locations and assemblies is one positive recall method.6.4 disposition6.4.1 accepted materialcomplete the inspection report and receipt record, including quantity accepted, quantity rejecte

30、d, page numbering. date, initial, and stamp the report. attach material certifications to the report if applicable.status the material accepted by attaching the appropriate material label and making entries in dataworks.retain (file) the inspection report and the supplier history form (ref qualityre

31、cords).move material to inventory as required. 6.4.2 rejected materialcomplete the inspection report, including quantity accepted, quantity rejected, ncmr number (see material review board procedure), page numbering, and date and initial the report. attach material certifications to the report.compl

32、ete a manual ncmr form.status the material rejected by attaching the appropriate material label and making entries in dataworks.record the electronic ncmr number (from dataworks) on the manual ncmr form.retain (file) the inspection report and the supplier history form (ref quality records). note: re

33、jected incoming material will be dispositioned by the material review board (mrb). since the inspection report contains information needed by the mrb, to save time, mrb paperwork may be initiated before filing the inspection report.rejected material must be quarantined in the mrb room. 7.0 flow char

34、t7.1 incoming inspection flow chart8.0 appendix8.1 guidelines for writing inspection criteriainspection criteria are to verify that material meets engineering specifications. inspection criteria cannot impose new design requirements or workmanship standards on the material.engineering and quality en

35、gineering are responsible for writing inspection criteria and to: select the attributes to be inspected and the sampling plan for each attribute. see acceptance sampling plans for the list of available sampling plans. select or recommend inspection equipment and conditions. for material that may be damaged by handling or storage during inspection (i.e. static, temperature, or humidity sensitive material, or clean material), handling precautions must be specified. when selecting attribute

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论