信件2(s-car)_第1页
信件2(s-car)_第2页
信件2(s-car)_第3页
信件2(s-car)_第4页
信件2(s-car)_第5页
已阅读5页,还剩1页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、微信公众号:资料小超市,更多人力资源资料供应商名称 上海浦泰汽配有限公司地址,邮政编码 上海浦东灵岩南路308号 200126电话号码 58412931日期 2004.01.05GM Supplier Quality EngineerGM供应商质量工程师 丁杰慧GM Release EngineerGM汽车公司发布工程师 刘 平General Motors Corporation通用汽车公司 上海通用汽车有限公司SUPPLIER MANUFACTURING ASSESSMENT OF DESIGN供应商设计的可制造性评估As required by General Motors, ABC Co

2、mpany held a manufacturing review of the Model Year-Part Name design on date.The review has led us to the following position:应通用汽车公司的要求,上海通用汽车有限公司在2004.01.05对控制支架BRACKET-CONTROL UNIT的设计的可制造性进行了评估。以下是我们此次评审的结果:(Select one 选择其一) Manufacturing is confident the design is manufacturable to GM required qu

3、ality levels, within PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements. There are no concerns to report.产品设计的可制造性方面可以达到GM要求的质量水平,并能满足PPAP的设计规范和能力要求。制造部门承诺

4、实现在GM供应商质量要求声明中所说明的达成0缺陷的目标。不存在需要汇报的问题。o Manufacturing has minor concerns about the design that have been reported to the design community and are described below. We are confident that the design will be modified to accommodate our issues and be manufacturable to GM required quality levels, within

5、PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements.有关设计的可制造性方面存在的一些较小的问题已经向设计部门进行了汇报。我们有信心在更改相应的设计后可以达到GM要求的质量水平,并满足PPAP的设计规范和能力要求。制造部门承诺实现在GM供应商质量要求声明中所说明

6、的达成0缺陷的目标。具体描述如下:o Manufacturing has major concerns about the design and we are not confident that we can produce this part at required quality levels. These concerns are described below.在设计的可制造性方面存在一些较大的问题,对于该产品我们没有信心能够生产出满足质量要求的产品。具体描述如下:During the design review, the following sources of data were

7、 reviewed prior to our look at the design:在设计评审的过程中,在审阅设计方案之前对下列的数据来源进行了评审:(Select items reviewed 评估条款选择)o Past 15 months of PR/RsPast 18 months of warranty过去15个月的PR/Rs过去18个月的售后质量Past 15 months of quality build issues Past 18 months of internal scrap reports过去15个月的质量问题过去18个月的内部废品报告Past 6 months of p

8、arts per million (PPM) dataCurrent process capabilities on existing equipment过去6个月的PPM 值现有设备的当前过程能力In our review, the manufacturing organization identified the following issues:在我们的评审中,制造部门确定了下列问题:Date Initiated开始日期Concern问题Responsible Person责任人Date Resolved解决日期(Select appropriate items 选择合适的条款)o Is

9、sues have been documented in the APQP Open Issues List问题已被记入APQP问题清单o The APQP Timing Chart has been updatedAPQP进度表已被更新o Resolutions to identified issues will allow the manufacturing process to achieve zero defects对指定问题的解决将使生产过程实现零缺陷_Supplier Chief EngineerSupplier Plant Manager供应商总工程师供应商工厂经理cc: GM

10、Supplier Quality Manager抄送:通用汽车公司供应商质量经理 Letter 2 信件2供应商名称 上海浦泰汽配有限公司地址,邮政编码 上海浦东灵岩南路308号 200126电话号码 58412931日期 2003.07.11GM Supplier Quality EngineerGM供应商质量工程师 丁杰慧GM Release EngineerGM汽车公司发布工程师 俞建新 何宇龙General Motors Corporation通用汽车公司 上海通用汽车有限公司SUPPLIER MANUFACTURING ASSESSMENT OF PROTOTYPE供应商PROTOT

11、YPE的可制造性评估As required by General Motors, ABC Company held a manufacturing review of the Model Year-Part Name prototype on date. The review has led us to the following position:应通用汽车公司的要求,上海浦泰汽车有限公司在2003.03.15对L-CAR/脚踏板FOOTREST-DRVR和雨感盖板COVER-W/S O/S DVRV SEN的样件的可制造性进行了评估。以下是我们此次评审的结果:(Select one选择其一

12、)Manufacturing is confident the design is manufacturable to GM required quality levels, within PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements. There ar

13、e no concerns to report.产品设计的可制造性方面可以达到GM要求的质量水平,并能满足PPAP的设计规范和能力要求。制造部门承诺实现在GM供应商质量要求声明中所说明的达成0缺陷的目标。不存在需要汇报的问题。o Manufacturing has minor concerns about the design, which have been reported to the design community and are described below. We are confident that the design will be modified to accommo

14、date our issues and be manufacturable to GM required quality levels, within PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements.有关设计的可制造性方面存在的一些较小的问题已经向设计部门

15、进行了汇报。我们有信心在更改相应的设计后可以达到GM要求的质量水平,并满足PPAP的设计规范和能力要求。制造部门承诺实现在GM供应商质量要求声明中所说明的达成0缺陷的目标。具体描述如下:o Manufacturing has major concerns about the design and we are not confident that we can produce this part at required quality levels. These concerns are described below.在设计的可制造性方面存在一些较大的问题,对于该产品我们没有信心能够生产出满

16、足质量要求的产品。具体描述如下:During the design review, the following sources of data were reviewed prior to our look at the design:在设计评审的过程中,在审阅设计方案之前对下列的数据来源进行了评审:(Select items reviewed 评估条款选择)o Evaluation of design changes promised during Listing of the prototype manufactures difficulties in assessment of desi

17、gn phase producing the prototype parts对设计阶段评估期间承诺的设计更改的评估 在样件制造过程中遇到的困难的清单o Past PR/R performanceConcerns and action plan from the prototype build过去的PR/R表现关于样件制造的问题和行动计划Recent internal scrap reportsPrototype PR/R recovery plans最近的内部废品报告样件 PR/R恢复计划In our review, the manufacturing organization identif

18、ied the following concerns that need attention:在我们的评审中,制造部门确定了以下需要加以注意的问题:Date Initiated开始日期Concern问题Responsible Person负责人Date Resolved解决日期(Select appropriate items 选择合适的条款)o Issues have been documented in the APQP Open Issues List问题已被记入APQP问题清单o The APQP Timing Chart has been updatedAPQP进度表已被更新o Re

19、solutions to identified issues will allow the manufacturing process to achieve zero defects对指定问题的解决将使制造过程实现零缺陷_Supplier Chief EngineerSupplier Plant Manager供应商总工程师供应商工厂经理cc: GM Supplier Quality Manager抄送:通用汽车公司供应商质量经理Letter 3信件3供应商名称 上海浦泰汽配有限公司地址,邮政编码 上海浦东灵岩南路308号 200126电话号码 58412931日期 2003.07.11GM

20、Supplier Quality EngineerGM供应商质量工程师 丁杰慧GM Release EngineerGM汽车公司发布工程师 俞建新 何宇龙General Motors Corporation通用汽车公司 上海通用汽车有限公司SUPPLIER MANUFACTURING ASSESSMENT OF MANUFACTURING PROCESS CAPABILITY AND PRODUCTION READINESS供应商制造能力和生产准备的可制造性评估As required by General Motors, ABC Company held a manufacturing rev

21、iew of the Model Year-Part Name manufacturing process on date. The review has led us to the following position:应通用汽车公司的要求,上海浦泰汽车有限公司在2003.08.15对L-CAR/脚踏板FOOTREST-DRVR和雨感盖板COVER-W/S O/S DVRV SEN的样件的可制造性进行了评估。以下是我们此次评审的结果:(Select one选择其一)Manufacturing is confident the design is manufacturable to GM re

22、quired quality levels, within PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements. There are no concerns to report. 产品设计的可制造性方面可以达到GM要求的质量水平,并能满足PPAP的设计规范和能

23、力要求。制造部门承诺实现在GM供应商质量要求声明中所说明的达成0缺陷的目标。不存在需要汇报的问题。o Manufacturing has minor concerns about the design that have been reported to the design community and are described below. We are confident that the design will be modified to accommodate our issues and be manufacturable to GM required quality level

24、s, within PPAP design specifications, and within PPAP capability requirements. Manufacturing is making a commitment to achieve zero defects as specified in the GM Supplier Quality Statement of Requirements.有关设计的可制造性方面存在的一些较小的问题已经向设计部门进行了汇报。我们有信心在更改相应的设计后可以达到GM要求的质量水平,并满足PPAP的设计规范和能力要求。制造部门承诺实现在GM供应商

25、质量要求声明中所说明的达成0缺陷的目标。具体描述如下:o Manufacturing has major concerns about the design and we are not confident that we can produce this part at required quality levels. These concerns are described below.在设计的可制造性方面存在一些较大的问题,对于该产品我们没有信心能够生产出满足质量要求的产品。具体描述如下:As a result of this analysis, the formal transfer

26、of primary responsibility from engineering to manufacturing is as follows:作为此次分析的结果,反映了由工程部向制造部的正式的职责转移,具体描述如下:(Select one选择其一)o Manufacturing accepts responsibility to meet required quality levels. The APQP Open Issues List and Timing Chart have been updated.制造部门接受满足质量要求的职责。APQP问题清单和进度表已得到更新。o At this point, the engineering community recognizes the scope of unresolved engineering concerns and is committing the following engineering resources to the plant manager until the issues are resolved. Manufacturing acceptance

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论