远洋船舶 简介_第1页
远洋船舶 简介_第2页
远洋船舶 简介_第3页
远洋船舶 简介_第4页
远洋船舶 简介_第5页
已阅读5页,还剩77页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Ocean Engineering ShipOcean Engineering Ship IntroductionIntroduction Ocean Engineering Ship Introduction 1.Basic functions 2.Ships parameters 3.Ship building (construction) 4.Inspection & Classification 5.Major equipments 6.Construction site Main Contents Basic Functions and Features Self-floating

2、feature:12kn,5000nm; Floating crane capability:800t,water depth 5.5- 200m; Transport Capability:Net 6465t,3100m2,15t/m2 Base Feature:depeth in water 5 to 9.5m Life Suppot:for 1 month time of 222 people External power:2000-5000kW,400V50Hz, Other Fnctions: trenching, pipe laying, fire rescue, salvage,

3、 etc. Advantages of Vessles Structure Large flat and up-inclined fold structure ensure stability of vessels. Doubble layer structure for broadside, ends, propulsion and bottom fuel tanks, bunker oil tank built in the protected area, which ensure safety. Bow, Propeller and outside area are constructe

4、d in 25mm board-thicker than regular vessels, which enables strength of the vessles. Other areas are constructed in 17-22mm board. Great anti-wind and anti-collision capability, high in security and reliability. Vessle Datas Flag State:China Overall length:146.16m Homeport:Tianjin China Width:40.00m

5、 Moulded Depth:10.75m Designed Draft:5.5m IMO:9662473 Scantling Draft:7.5m MMSI:413304410 Total Tonnage:21553t Navigation Area: unlimited Net Tonnage:6465t Degree of Automation:CCS AUT-0 Date of Construction: from December of 2011 Complition Date:Feburary of 2014 Features Fuel tank capacity:1950m3 D

6、iesel storage capacity:380m3 Freshwater storage capacity:2220m3 Ballast water tank capacity:44100m3 Helicopter platform:21m,12.0t,Model S92 Fuel consumption:1.96t/h,5 engines at full load Deck area:3100m2 Deck load:15t/m2 Vessels Parameters Environmental conditionsEnvironmental conditions: : Maximum

7、 ambient air temperature in summer:40, 60% relative humidity Minimum outside air temperature in winter:-20 Maximum summer water temperature:32 Minimum winter water temperature:-2 Operation conditionsOperation conditions: : Wind velocity:36m/s Current speed:2kn Wave height:8m Major equipment -800 ton

8、 crane Doubble hook full swing: 800t28m Single hook full swing: 500t28m Lifting height:-13103m Small hook lifting:100t, Small hook swing:27m, Small hook lifting height: -13118m Pitch Speed:full load 11/min Rotation speed:0.125- 0.25rpm Major equipment -60 ton crane Main hook lifting:60t Rotation dia

9、meter of main hook:10.5-42m Small hook lifting:5t Small hook rotation: 12.5-45m Hanging high:70m Major equipment - turbine equipment Main generator sets: Wartsila9L20,61700kW Emergency generator:1180kW Transformer:10sets,11420kVA Compressor:290m3/h,3MPa Ballast pump:41750,3bar Sea water pump:3450m3/

10、h,3bar Fresh water pump:3260m3/h,3bar Central cooler:26000kw Boiler:12000kg/h,0.7MPa Major equipment - electric propulsion system Schottel ZAzimuth thruster,23250kW Propulsion motor:23250kW Electric propulsion system: Siemens frequency control system Major equipment - mooring equipment Anchor:2 7425

11、kg,Self-righting high holding power anchors Windlass:278; Anchor chain:24 27.5m/section; The positioning anchor: Delta anchor 8 12000kg Anchor cable:2200m 8 76mm steel cable Wind resistance performance:36m/s Lifejacket:310 units bunker clothing:6 Liferaft:1630person;16person Foam tank:0.8m3,0.6-1.2M

12、Pa Lifeboat:260person,492person Fire Pump:2100m3/h,0.85MPa,275m3/h,0.85MPa Fire monitor:180m3/h,1.3MPa, 290m3/h,3MPa Major equipment - fire rescue Construction-Vessel launching Launched in October 2012 Constrution-Installation of crane Installation of 800t crane Inspection & Classification China Classification Society monitored the entire construction and testing. Classification mark: CSA Box On Bottom Offshore Wind Turbine Service Unit,IWS,Loading Computer (S,I,D), Lifting Appliance,HELDK,UT- 0,Self-Proopelled Vessle safety managem

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论