1、LOGONavajo Generating Station主讲人:牛兰利Contents introduction1History2 Design and specifications3Performance4Environmental controls6Economic aspects5IntroductionIntroductionIntroductionNavajo Generating Station is a 2250 megawatt coal-fired powerplant. This plant provides electrical power to customers i
2、n Arizona, Nevada and California. It also provides the power for pumping Colorado River water for the Central Arizona Project, supplying about 1.5 million acre feet (1.85 km3) of water annually to central and southern Arizona. As of 2013 permission to operate as a conventional coal-fired plant is an
3、ticipated until December 22, 2044. The Navajo Generating Station is the United States of Americas third largest emitter of carbon dioxideIntroduction it locates on the Navajo Indian Reservation, near Page,Arizona, United States Historyin 1950s and 1960s designin 1970 start in 1974units 1 completed i
4、n 1974units 2 completed in 1974units 1 completed NGSbuildingDesign and specifications The plant has three identical 750 MW steam electric generating units. Major components of each unit include a boiler, turbine, generator, closed-cycle cooling system, and environmental control equipmentDesign and s
5、pecificationsThe boilers are tangentially fired, balanced draft, reheat type steam generators, supplied by Combustion Engineering Designed for supercritical operation, each boiler supplies up 5,410,000 pounds of steam per hour to the turbines at 3500 psi (241 bar) and 1000 F (537 C)The main turbines
6、 are General Electric (GE) tandem compound reheat turbines, each directly coupled to a generator and designed to rotate at 3600 rpm.The plant uses about 26,000 acre feet (32,000,000 m3) of water per year from Lake Powell, or about 1/2 gallon (1.9L) per kWh, mainly for cooling water and scrubber oper
7、ationThe coal is hauled 75 miles from mine silos to the plant by the BM&LP electric railroad that is owned and operated by the plantPerformanceThe gross capacity is 2409.3 (MW) or 803.1 MW per unitA net nameplate capacity of 2250 MW or 750 MW per unitthe rated power output leaving the plant through
8、the transmission linesEconomic aspects NGS has 538 employees, and pays about $52 million per year in total wages NGS being the sole source of revenue for the mine. The plant and mine annually pay out about $100 million in direct wages and $50 million in leases and royalties NGS and Kayenta Mine paym
9、ents in 2012 accounted for about a quarter of the Navajo Nations revenues, and 65% of the Hopi Tribes revenues, resulting in about 850 direct tribal positionsEnvironmental controlsFlue gas emissions Prior to installation of the scrubbers, SO2 emissions were about 71,000 tons per year Prior to 2009 w
10、hen installation of the new burners began, NOx emissions were about 34,000 tons per yearEnvironmental controlsEnvironmental controls Fly ash particulate is removed from the flue gas by hot-side electrostatic precipitators (ESPs) and SO2 scrubbers. The ESPs, constructed as part of the original plant,
11、 remove 99% of particulate. Scrubbers remove an additional 50% of what remains in the flue gas after passing through the ESPsEnvironmental controlsWastewater handlingNGS was built with one of the first zero liquid discharge (ZLD) systems in a power plant, recovering all cooling tower blow-down and r
12、unoff from developed areas of the site。 The waste water is processed through three brine concentrators and a crystallizer, which remove the solids and produce distilled water for re-use within the plant Several lined ponds are used in conjunction with the ZLD system to capture and regulate the flow of waste water to the systemEnvironmental controlsByproducts handling The plant sells about 500,000 tons of fly ash per year for use in the manufacture of concrete and Flexcrete insulating block building product Bottom ash and gypsum, a byprodu
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025内蒙古赤峰市元宝山区事业单位通过“绿色通道”引进高层次人才10人模拟试卷及答案详解1套
- 业务活动文档管理与存档方案
- 2025年宁波前湾新区卫生系统公开招聘事业单位工作人员18人考前自测高频考点模拟试题及答案详解(历年真题)
- 2025年变频装置项目提案报告模范
- 2025广东广州市越秀区农林街道办事处招聘辅助人员1人模拟试卷完整答案详解
- 培训需求分析与课程设置工具
- 员工绩效考核方案人力资源管理工具
- 2025北京大兴区兴丰街道招聘临时辅助用工人员4人考前自测高频考点模拟试题附答案详解
- 金融服务行业守秘承诺书5篇
- 2025辽宁沈阳汽车有限公司招聘8人模拟试卷及一套答案详解
- 学习弘扬枫桥精神与枫桥经验PPT枫桥经验蕴含的精神和内涵PPT课件(带内容)
- 内科学-中毒总论
- 测量员岗前培训试题
- GB/T 7562-2018商品煤质量发电煤粉锅炉用煤
- T∕IAC CAMRA 20.3-2022 事故汽车维修工时测定及应用规范 第3部分:拆装工时
- DB31T 680.8-2019 城市公共用水定额及其计算方法 第8部分:公共管理和社会组织(机关单位)
- 智能制造 增材制造技术课件
- 中国古代数学中的数学文化课件
- 锚的作用与锚泊解析课件
- FHLG20型高频高压发生器说明书
- 国家自然科学基金资助项目结题报告模板(可编辑版)
评论
0/150
提交评论