版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Version 1.0Aug 2010RECONE PROCEDURE FOR CONE LOUDSPEAKERS Version 1.0Aug 2010MODELS This instructions is prepared for the following models:MODELRECONE KIT12F400B 8 OHRK 12F400B15F400MB 8 OHRK 15F400MB12N800MB 8 OHRK 12N800MB15N800MB 8 OHRK 15N800MB 18N1200B 8 OHRK 18N1200B18N1200BN 8 OHRK 18N1200BNV
2、ersion 1.0Aug 2010TOOLS AND SUPPLIES TOOLS AND SUPPLIES REQUIRED Soldering iron, solder, glue, plastic spacer, razor knife, tweezers, masking tape, epoxy glue (NOT SUPPLIED), cloth rags, methyl ethyl ketone (MEK), cotton swabs, and, if possible, audio oscillator and amplifier. MATERIALS SUPPLIED Tub
3、e of Beyma glue (blue color), Latex (white color), Plastic spacer, Moving parts, gaskets, dust cap.Version 1.0Aug 2010PREPARATIONUsing razor knife, remove old cone-coil assembly, and clean with MEK the surfaces, where suspension and surround will mount, of old parts and glue.Version 1.0Aug 2010PREPA
4、RATIONUnsolder the old voice coil leads from terminals.Version 1.0Aug 2010PREPARATIONUsing razor knife, remove old cone-coil assembly, and clean with MEK the surfaces, where suspension and surround will mount, of old parts and glue.Version 1.0Aug 2010PREPARATIONFold a piece of masking tape lengthwis
5、e around a piece of cardboard (70 mm x 25 mm x 1 mm), with adhesive side exposed and insert it in the air gap and rotate. Repeat this until tape remains clean when withdrawn. Check gap with magnifying light. Clean top plate and magnet of any debris.Version 1.0Aug 2010INSTALLATIONUsing the tube of Be
6、yma glue supplied, apply a bead of glue on frame surfaces where suspension and surround will mount, and also over the spider and surround. Wait for 3 minutes.Version 1.0Aug 2010INSTALLATIONInsert the plastic spacer into the new voice coil assembly, allowing overhang 10-12 mm below bottom of voice co
7、il. Slide spacer tube over the pole piece and down into gap, making sure tinsel leads on assembly are aligned properly with terminals on frame. Carefully guide voice coil assembly down spacer onto frame and into proper position.Take a small rag dipped in MEK and use it to press down on spider where
8、it joins the frame. Work back and forth to even out spider and secure bond on frame. Repeat for surround, working out bumps.Version 1.0Aug 2010INSTALLATIONSpread white glue over the surround using a brush, be careful not to put white glue over the gasket bed. Lay a bead of glue from the Beyma tube o
9、n gasket area. Wait for 5 minutes and place gasket segments on frame in proper position. The white glue can be put at the end of the repair (easier, but takes longer time)Version 1.0Aug 2010INSTALLATIONLay a bead of glue from the Beyma tube on gasket area. Wait for 5 minutes and place gasket segment
10、s on frame in proper position.Rotate down the device and allow glue 7-8 hours to dry Version 1.0Aug 2010INSTALLATION1. Use tweezers to guide tinsel leads through solder lugs. Allow enough slack for full cone excursion, but do not allow leads to touch. Solder leads to terminals and trim excess.Version 1.0Aug 2010INSTALLATIONOnce completely dry, remove plastic spacer and proceed to fix the dust cap. Apply a bead of glue (epoxi glue) on the junction on the dust cap and cone, or in the flange of the dust cap, and
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 46342-2025听力防护装备通用测试方法
- 商场物业费代缴合同协议2025年零售版
- 软件开发测试外包合同协议2025
- 2025年项目制员工的绩效评价方法考试试题及答案
- 2025年培训预算编制与控制考试试题及答案
- 大中专招生合作协议书
- 商铺门口摆摊合同范本
- 外卖店铺转让合同协议
- 土地专项管理合同范本
- 培训机构公司合同范本
- 2025年高校辅导员考试基础知识试题及答案
- 2025广东清远市纪委市监委纪律审查管理中心招聘17人考试参考题库及答案解析
- 紧固件包装培训知识总结
- DB51-T 3299-2025 数据资产登记规范
- 粘多糖贮积症课件
- 保密知识培训课件
- DB31T 1605-2025电动自行车充换电柜建设和消防安全管理要求
- GB/T 24460-2025太阳能光伏照明装置总技术规范
- 木工入场安全教育培训课件
- 园林消防安全培训教学课件
- 国家中医药管理局《中医药事业发展“十五五”规划》全文
评论
0/150
提交评论