1、工程承包合同中英文工程承包合同contract of construction project合同编号: contract number:工程名称: project name:发包方甲方:工程设计参谋北京有限公司employer (party a): international consulting engineers ( beijing) limited承包方乙方:中寰艺高建筑装饰工程有限公司contractor (party b): zhong huanyigao building decoration engineering co. , ltd依据中华人民共和国合同法和建筑安装工程承包合
2、同条例及有关规定,为明确双方在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。in order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with the prc contract law and construction engineering contract regulations and relevant provisions, agr
3、ee to sign this contract.第一条工程工程article 1, project item1工程地点: ,project site:2工程范围: scope of project3工程造价:人民币元整 (该造价为包工包料价)3, project cost: pmb yuan only(cost of this contract is the contract price for labor and materials)其次条施工预备 article 2, preparation for construction1甲方帮助乙方办理临时水电及垂直运输,供应建筑图纸及有关隐藏障碍
4、物的资料。party a shall assists party b to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .2乙方:. party b:负责施工区域的临时设施、水电管线的铺设、管理、用法和修理工作; be responsible for the works of laying, management, use a
5、nd maintenance of the temporary facilities, water and electricity pipeline in the construction area.组织施工管理人员和材料、施工机械进场;organize construction management staff and construction materials, construction machinery enter the site.负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾搜集处。be responsible for keeping public pl
6、aces clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.第三条工程期限 article 3 period of construction1依据工期和用法需要,商定工程总施工期为天日历天,自年月日开工至年月日完工1. according to the period of construction and the use need, the total co
7、nstruction period agreed shall be days (calendar days), start from the date of and complete on the date of .2如遇以下状况,经甲方现场代表签证后,工期相应顺延:construction period shall be prolonged upon party a site representative's confirmation when the matters occur as follows.按施工预备规定,甲方未帮助乙方办理临时水电及垂直运输,影响进场施工;accordi
8、ng to the requirements of construction preparation, party a fail tot assist party b to apply for temporary water and electricity and vertical transportation and have an impact on party b construction;因甲方提出增减工程而造成重大设计变更,因此影响进度;the material modification or change of design due to the party a s require
9、ment of addition or deletion of project have the effect of hindrance on the progress of works.未按合同规定拨付预付款、工程款而影响施工;party a fail to pay the advance payment and construction cost to party b and impact the construction progress;人力不行抗拒的因素而延误工期。the delay of schedule of construction due to force majeure.第
10、四条工程质量article 4 the quality of project一本工程质量经双方讨论要求到达双方商定之验收标准。the quality of project should achieve the requirements of acceptance agreed by both parties.二乙方必需严格根据施工图纸、说明文件和国家颁发的建筑工程标准、规程和标准进展施工,并承受甲方的监视。party b should carry on the construction in strict accordance with drawing, specification file
11、and regulations and specifications authorized by the competent authorities and be under the supervision of party a.三乙方在施工过程中必需遵守以下规定:party b should, during the construction, comply with the provisions as follows: 1由乙方供应给甲方的全部材料必需经甲方同意方可用法,未按要求购置严禁用法;all materials provided by party b should be subjec
12、t to the approval of party a prior to use,and none of the same being bought without conformity with party a requirements can be used.2隐藏工程必需经甲乙双方检查,方可进展下一道工序;the concealed works should be checked by both parties before the next progress;3工程开工后,乙方按规定对工程实行保修,保修时间自通过开工验收之日算起,保修期一年。party b shall take th
13、e liability of maintenance following the complete of works. the period of maintenance shall be one year from the day of acceptance of complete.第五条工程价款的支付与结算article 5 payment and settlement of the contract price合同总价× 50 %, 即元the total contract price × 50%, which is yuan.中期款the payment of me
14、dium-term工程进度过半三日内within 3 (three) days after the progress more than half.合同总价× 40 %, 即元the total contract price × 40%, which is yuan.尾款final payment开工验收结算后七日内within 7 (seven) days after the completion acceptance and settlement.合同总价× 10 %, 即元the total contract price × 10%, which
15、is yuan.第六条施工与设计变更article6 the modification of construction and design 一乙方交付的设计图纸、说明和有关技术资料,作为施工的有效根据,开工前由甲方组织签字认同,作为施工的补充根据,甲、乙双方均不得擅自修改。. design drawing, illustration and relevant technical data consigned by partyb are the basis for construction and shall be confirmed by party as signature, which
16、is deemed as the supplementary basis and shall be modified by anyparty without authorization.二施工中如发觉因甲方要求而发生的设计错误或严峻不合理的地方,乙方应准时以书面形式通知甲方,由甲方准时会同乙方等有关单位讨论确定修改看法或变更设计文件,乙方按修改或变更的设计文件进展施工。假设发生增加费用包括返工损失、停工、窝工、人员和机构设备调迁、材料构配件积压的实际损失由甲方负责,并调整合同造价。if and when any error or material unreasonable problem of
17、 design due to party as requirement, party b shall notify party a promptly in writing and decide the amendment or modification of the design documentation by the consultation and negotiation between parties and units concerned. party b shall carry out construction according to the design documents m
18、odified or changed. if project cost increase (including the actual loss of rework loss, stoppage or slowdown, personnel and machine equipment relocated, material structures, fixtures backlog), shall be responsibility by party a, and be adjusted the contract price together with party b.三乙方在保证工程质量和不降低
19、设计标准的前提下,提出修改设计、修改工艺的合理化建议,经甲方、设计单位或有关技术部门同意后实行施行。any reasonable suggestion on the modifications of design and craft proposed by party b, subject to the quality and without reducing standards of design, could be carried out upon the approval of party a, design unit or concerned technical department.
20、四甲方如需设计变更,必需作出正式修改通知书和修改图纸,乙方才予施行。重大修改和增加造价时,必需另行协商,乙方才予施行。party a should, if any necessary design change, make the formal amendment and modify drawings for party bs implementation. material changes and cost increased must be negotiated by both parties before party b implement the same.第七条工程验收articl
21、e 7 acceptance of project一工程施工中地下工程、构造工程必需具有隐藏验收签证、试水、抗渗等验收合格记录。甲方须准时办理验收签订手续。the underground engineering, structural engineering in the construction of project should be checked and with issue of certificate and the record of acceptance of water test, anti-permeability and so on. party a should dea
22、l with the acceptance signed formalities timely.二工程开工验收后,甲方才可用法party a can use the project after completion acceptance在规定的保修期内,凡因施工造成的质量缺陷应由乙方无偿保修。其保修条件、范围和期限按城乡建立环境爱护部84城建字第79号通知印发的建筑工程保修方法试行执行。in the provision warranty period, any construction quality defects, party b should make maintenance free
23、of the quality defect due to construction, the scope and duration carry out according to the issuance of cheng jian no. 79 notification " construction engineering guarantee measures (trial) "by urban and rural construction and environmental protection department (84).第八条违约责任article 8 liabi
24、lity for breach of contract乙方的责任:responsibility of party b:一工程质量不符合合同规定的,负责无偿修理和返工。take charge of gratis repair and rework if project quality doesn't meet contact's stipulation二工程不能按合同规定的工期交付用法的,按合同中关于建立工期提交或拖后的奖罚规定偿付逾期罚款。if fail to deliver the construction according to the contract on time,
25、 the overdue fines according to punishment or award of the provision concerning the delivery or delay.甲方的责任:the responsibility of party a:一未能根据合同的规定履行自己应负的责任,除开工日期得以顺延外,还应赔偿乙方由此造成的实际损失。failed to fulfill their responsibilities in accordance with the provisions of the contract, in addition to the comp
26、letion date to be postponed should be compensation for the actual loss of party b .二工程中途停建、缓建或由于设计变更以及设计错误造成的返工,应实行措施弥补或削减损失。同时,赔偿乙方由此造成的停工、窝工、返工、倒运、人员和机械设备调迁、材料和构件积压的实际损失。ii. the ongoing project is stopped, postponed or due to design changes and rework caused by design errors, should take measures to remedy or reduce losses. at the same time, compensate party b t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 美术班班级奖惩制度范本
- 大学寝室管理奖惩制度
- 生产重大异常奖惩制度
- 收货员奖惩制度条例规定
- 六年级课堂奖惩制度
- 流水线小组长奖惩制度
- 财务收支审计奖惩制度
- 超市员工考核奖惩制度
- 庭审奖惩制度汇编模板
- 家庭作业语文奖惩制度
- 烟花爆竹储存培训课件
- 静脉输液不良反应临床识别与应急处理标准化流程指南
- 无偿献血培训课件
- 敬老院及附属工程监理规划以及实施细则
- DG∕T 017-2021 谷物烘干机标准
- 红曲科普课件
- 2025极狐品牌官方直播运营方案
- 2026年江西电力职业技术学院单招职业技能考试题库及参考答案详解一套
- DB32/T 4400-2022 饮用水次氯酸钠消毒技术规程
- 2025年重庆市政府采购评审专家考试真题含答案
- 2025年鄂尔多斯职业学院单招职业技能考试模拟测试卷附答案
评论
0/150
提交评论