文档简介
1、descriptionyespartsno.n.aremarkmolding process audit for molding生产操作流程审记3.about molding 关于生产 3-1. molding equipment 生产设备 3-1-1. conveyor or cooling racks are placed and in good condition. 传送带,冷却架定位良好1050 3-1-2. operators know how to use clipper for gate cut and push knife. 操作员应懂得如何使用刀片1050 3-1-3. th
2、ere are all kinds of jig, procedure and drawing. 有各种各样的钻模,程序和流程图20100 3-1-4. the mold releaser and cleaner is used according to standard. 模具清洁剂按标准要求使用1050 3-1-5.there are subsidiary materials for each machine .对每台机器要有辅助用品 (copper stick, cleaner(ipa),tissue, holder for set-up chart, safety helmet) (铜
3、棒,清洁剂,棉纸,对set-up chart固定架,安全头盔)1050 3-1-6. there is weighing balance for spc/sqc 对于spc/sqc要有天平称1050 3-1-7. purge pack., scrap and runner bin, vacuum cleaner for hopper,vinyl tie are in good condition. 清料架,废料箱,真空吸尘器,乙烯基带状态良好1050 3-2-1. there is training schedule for new technician. 对新来技术员要有培训计划表20100
4、 3-2-2. there is orientation material for male/female empioree 对男女员工有各自针对性的培训资料1050 3-2-3.production report and other reports 生产报表和其它报表 - daily, weekly report 日报表, 周报表 - report as each job 对每件工作要有汇报 - transfer slip 产品交接单1055533000 3-2-4. s.o.p file 标准操作程序文件 - molding procedure 生产流程 - quality caution
5、 point 质量要点 - set-up chart set-up图表 - molding caution point 成型要点 - start up procedure (qc+molding) start up流程(qc+生产) - product information 产品资料555555333333000000 descriptionyespartsno.n.aremark3-3. monday morning start 星期一早晨开始100 3-3-1. monday start up check list 星期一开始检查单 3-3-2. monday start up proc
6、edure 周一开始程序 3-3-3. machine heat-up time and status of attendance (1hr earlier) 机器升温时间及出席身份/人员(提前1小时升温) 3-3-4. monday start up assembly 周一开始早会 - the status of assenbly attendance (molding, q.c, engineering, mold maintenance, u/t, material handler) 集合参加人员(生产qc,工程师,模具保养,公共设备,原料员) - message and check p
7、oint while assembly 信息与检查要点 - check point for machine start 检查开机时的要点 (safety door, cooling water, packing material,number of mold maintenance shot) 安全门, 冷却水, 包装材料, 模具保养数量10555510533335000000 3-3-5. short assembly by first shift team leader 由第一班的队长短会530 3-3-6. mini assembly of first shift personnel 第
8、一班人员的短会530 3-3-7. all start up completed - q.c check all product/colors o.c检查所有产品/颜色 - coordinators check operators,performance against procedure 协调员检查有关程序性能,关心好操作员 - personally check quality 亲自检查质量 - check molding cycle 检查生产周期555533330000 3-3-8. consolidate all report/information on start up 巩固有关开始
9、的所有报告和资料1050 3-3-9. assenbly of personnel involved in start up for evaluation 结束短会涉及到开始评估1050descriptionyespartsno.n.aremark3-4. molding set-up 成型set-up90 3-4-1. there is set-up procedure 要有set-up程序1050 3-4-2. operators are following accurately set-up procedure操作员跟随下列适当set-up程序 - operators are well
10、aware of the s.o.p files before changing mold(molding condition,material color, cooling method ) 操作员明确知道s.o.p文件在换模前(成型条件,原料颜色,冷却方法)- raw material, m/b and packing materials are prepared for mold attatenment 为所换模具准备原料,m/b和包装材料- cooling water connection and leak are checked 检查冷却水连接和漏水等- air blowing co
11、nnection 吹气连接- nozzle touch and setting parameter 喷嘴接触和设置参数- how to make the first shot.(to prevent overpack) 怎样产生第一射击(避免涨模)- the time to open the valve of cooling line 打开冷却线的阀的时间- the appearance and weight are checked by oneself before submit to q.c 送样q.c之前,重量和外观要由自己检查101010101010555555553300000000
12、 3-4-3. follow the procedure of approval by q.c 遵从q.c确认程序 - the machine is checked after 30min. of start approval 在开始确认30分钟之后,机器才可检查- there is set-up check sheet between molding and qc dept 生产部和q.c都要有set-up检查单555333000 3-4-4. visual aid is placed beside operators and machine在操作员和机器旁要有明确目标 - molding
13、procedures 生产程序 - quality caution point 质量警告要点 - set-up chart set-up表101010555000 3-4-5. there is standard for set-up shots 要有set-up模数记录530descriptionyespartsno.n.aremark3-5. shut down 停机130 3-5-1. there is shut down procedure (as the type of resin) 要有停机程序(废料类型)1050 3-5-2. operatios are following sh
14、ut down procedure 操作员跟随下列停机程序 - meeting before shut down 停机之前要开会 - the time of cooling water must close before 35 shot 停机前35模关冷却水 - resin purge inside cylinder is checked 清除料管内的原料 - the mold is cleaned 清洁模具 - the temperature of cylinder down is inspected 检查炮筒温度 - cooling water in the mold is removed
15、 in case of stopping working more than 3days 万一停机时间超过3天以上要把模具内的冷却水搞出来 - others 其它555555533333330000000 3-5-3. woke place is arranged and cleaned 工作现场清洁1050 3-5-4. machine, valve, and eleatricity are checked 机器,阀和电源要检查1050 3-5-5. the meeting is held for inspectation after shutting down 停机后开检查会议530 3-
16、5-6. the status of shut down as raw materials is checked by each material (pe,pp,p.c,abs,ultem) 停机状况与原料一样要检查1050 3-5-7. when the machine not running, the water of the mold is closed 停机时,可关模具水1050 descriptionyespartsno.n.aremark3-6. color change or material change 换色或换料90 3-6-1. there is color change
17、 procedure with safety manner 要有安全换色程序1053 3-6-2. color change target time/shots are checked 要检查换色目标时间和模数530 3-6-3. there are equipments for color change 要有换色设备- vacuum cleaner, purge rack 真空吸尘器,净化器1050 3-6-4. purge resin(lump) is well treated when color change 换色时净化废料要好好对待1050 3-6-5. there is the c
18、olor change method for cold/hot runner type 对于冷热模要有换色方法1050 3-6-6. how to treat residue material after changing clr&rm 换了clr和rm之后怎样对待残余原料530 3-6-7. work place is arranged and cleaned after changing color and raw material 换完色和换完料之后,工作现场要清洁1050 3-6-8. mixing nozzle or mixing screw is used when pro
19、ducing color item 生产带色项目时得使用混合喷嘴或混合螺杆1050 3-6-9. color changer rechecks the state of color of color after 30min or 1hr 30分钟或1小时之后,换色者再次核对换色情形1050 descriptionyespartsno.n.aremark3-7. screw cleaning 螺杆清洁80 3-7-1. there is screw cleaning procedure 要清洁螺杆程序1050 3-7-2. screw is cleaned periodically 要定期清洁螺
20、杆1050 3-7-3. there ia screw cleaning check list 要有螺杆清洁检查单1050 3-7-4. there are tools for screw cleaning 要有清洁螺杆工具 - screw cart. tools, heat resist glove,safety cap,etc 螺杆大推车,工具,高温手套,安全帽等1050 3-7-5. spare screw, head torpedo,check ring/seat are in good condition 备用螺杆,螺杆头,定位环状态良好1050 3-7-6. screw assem
21、ble/disassemble is kept by procedure accurately 拆/装螺杆要保持好适当的程序1050 3-7-7. the cleanness of the barrel and the cleaning tools are checked 要检查螺筒的清洁度和工具的清洁度1050 3-7-8. it is safe while screw pull out/insert 拆螺杆和装螺杆要安全 - safety helmet, safety shoes, heat resist glove, safety goggle(or face mask) 安全头盔,安全
22、鞋,高温手套,安全护目镜(面具)1050 3-7-9. screw and cylinder are in good comdition 螺杆和炮筒状态良好1050 3-7-10. there are screw history cars and check sheet 要螺杆历史记录和检查表530 3-7-11. working floor is well arranged and cleaned after screw disassemble 拆完螺杆之后,地板保持清洁530 descriptionyespartsno.n.aremark3.8. molding room and operating method 成型室和操作方法100 3-8-1. machine and around work place are in good house keeping 现场机器保持清洁20100 3-8-2. shop floor and outside is clean 室内外要保持清洁1050 3-8-3. the peripheral equipment is well managed 处理好外围设备 -
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年城乡结合部电力设施改造分包协议
- 2025版内容创业佣金提成协议下载
- 2025版材料科学与工程实习生就业合同规范
- 河北省泊头市2025年上半年事业单位公开遴选试题含答案分析
- 2025年度智能穿戴设备委托开发合同
- 2025方管市场大宗交易合作协议书
- 2025年度人民法院协议离婚程序操作指南及案件审理合同
- 2025年度城市环卫货物委托运输协议
- 2025版南汇农业志编纂与非物质文化遗产保护合同
- 2025年建筑防水材料销售与施工培训承包协议
- 电气照明系统课件
- 临时用水施工专项方案
- 北京市各县区乡镇行政村村庄村名明细
- GB∕T 9286-2021 色漆和清漆 划格试验
- DB35∕T 1844-2019 高速公路边坡工程监测技术规程
- 720全景照片制作方案及发布流程
- 工作责任心主题培训ppt课件(PPT 26页)
- 除尘器基础知识培训资料(54页)ppt课件
- 完整解读新版《英语》新课标2022年《义务教育英语课程标准(2022年版)》PPT课件
- 《国际商务(双语)》课程教学大纲
- 2011版义务教育生物课程标准word版
评论
0/150
提交评论