1、in structionthis document is used to define the details of the master test plan. once the test plan is outlined, the document must be reviewed and approved by the lead technical representative on the project as well as the lead business representative on the project. if anything related to the test
2、plan changes during the execution and testing phase of the project, this document should be updated and re-approved by both parties.test scopethis section is used to provide a high-level description of the business processes to be tested and a high-level description of the type of testing required f
3、or this project. it also defines what is not in scope for the testing phase of the project.example:this test plan will test all the requirements for system a release 1.1 with the exception of requirement nnn, which will be tested by the xxxx team for xxxx reasons. this master test plan covers integr
4、ation, user acceptance, and regression testing.it will not include unit testing, which will be performed by the external vendor, zzz. it will not include user certification testing, which will be performed by the finance team.test featuresthis is a description of the features that will be tested wit
5、hin the scope of the test plan. the list represents what will be tested as well as the individuals/groups involved with the testing activities.example:br#featureresponsible party or groups1pre-clean (incorporate worksite "s version)it2list bills (incorporate worksite standards)it, a/p director3
6、direct bills (incorporate worksite standards)it, a/p director4dynamics (to incorporate the ftp piece to the austin server for sarbanes oxley)it, controllertest inputs/outputsthis is a description of the inputs that will be used to assist with the testing effort and a list of the outputs that will be
7、 delivered from the testing effort.example:inputsoutputsbusiness requirement specificationstest resultsdefect logissues logchange request logtest strategythis is a description of the recommended testing approach for this project. this describes “how',the test items and features will be tested.ex
8、ample:test typedescriptioncommentintegration testthis type tests all changed functionality end to end.user acceptancetesttypically performed by business user, this tests all changed functionality of a system from the end-user perspective.regression testthis tests the entire system to insure that any
9、 untouched junctionulity did not get adversely impacted by the project-related work.user certification testthis test is performed after the solution has been moved to production to insure it has been moved successfully.this will he performed by the business user.test environment (tools, system, data
10、bases)this is a list of the testing tools, systems, and databases. example:toolsdescriptionversionwinrunnerautomated script generation tool.4.0loadrunnerautomated script generation tool.2.3unix shell scriptsscripting language.in housemanual inputmanual entry of data onto screen or gui.n/aclearcaseto
11、ol used to track defects.in house toolsystemtest systemcinappxxxpc lab13th floordatabasetest database 1/testdcitabaseoooltest database 2/prodatabase002test roles and responsibilitiesthis is a list of the testing roles and responsibilities.example:resourceroleresponsibilitytom thomas, nuittest ma nag
12、 e r/projectmanager provides technical direction. acquires testing resources. assigns tasks to testing resources. communicates test results to management.steve stevenson,nuittest designer documents test plan. identifies, documents and prioritizes test cases. evaluates effectiveness of test effort.jo
13、an jones, finance chris christopher, nuittester executes test cases, logs defects, and documents test results.rob robinson, nuittest system administrator ensures test environment and assets are installed, managed and maintained. includes administrcition of testing ids.test milestonesthis is a list o
14、f the critical test milestone dates. be sure to include these dates in the overall project plan.example:taskmilestone datesetup test environment07/31/05complete unit testing08/31/05complete integration testing09/30/05complete user acceptance testing10/31/05complete regression testing11/30/05complete user certification testing12/31/05document approvalthe signatures below acknowledge that the test plan outlined above is complete and accurate. upon receiving written approval, the project team will proceed to the next step of the project.if anything changes during t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 宁波市人民医院学科资源配置优化考核
- 济南市人民医院妊娠合并肾病诊疗能力考核
- 吉安市人民医院卒中绿色通道时间窗管理考核
- 南昌市人民医院护理科研应急管理考核
- 新余市中医院宫腔镜子宫内膜息肉切除术考核
- 江苏省宿迁市酒店消防安全测试题十(含答案)
- 固体和液体状态变化测试题及解析
- 潍坊生物会考真题及答案
- 2025年工业催化原理试卷及答案
- 2025年龙沙区招教考试题及答案
- 2025年注册安全工程师金属非金属矿山真题及答案
- 2025上海浦东新区浦东公安分局文员招聘300人考试参考题库及答案解析
- 2025年安徽省直机关遴选公务员面试真题及解析
- 2025年秋期新教材人音版三年级上册小学音乐教学计划+进度表
- 纸箱基础知识培训资料课件
- 大学教学督导细则执行手册
- “华能工匠杯”电力市场交易技能竞赛考试题库(附答案)
- 2025年党员考试题库及答案
- 医院手术告知第三方见证机制
- 设备维护标准操作程序SOP模板
- 检验样品管理办法
 
            
评论
0/150
提交评论