版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、.表 H-421项目 :Project母线安装记录装置 :Bus installation recordUnit工号 :Section名称施工日期NameDate电压等级kV图号VoltageDrawing No.母线型号 、规格套管 、绝缘子型号Bus model and spec.Bushing insulator model1、一般安装检查 :General installation inspection序号检查调整项目安装检查结果No.Inspection and adjustment itemInspection result1母线型号 、规格、材质核对型号规格材质Bus model
2、, spec, and mat. InspectionModelSpecificationMaterial2绝缘子 、穿墙套管检查型号规格油位、密封绝缘Insulator and lead-in insulatorModelOil level, sealInsulation3母线支架制作安装规格安装尺寸防腐Bus support fabrication and installationSpec.DimensionAnti-corrosion4母线安装检查排列、相色弯曲倍率伸缩节Bus installationArrangement, colorCurve radiusExpansion joi
3、nt5连接螺栓 、垫圈检查规格热镀锌露出长度Bolt and washer inspectionSpec.GalvanizationLeft length6母线接触面光洁平整搪锡电力复合脂Bus contact area inspectionSmooth.Enam.Polymer7硬母线焊接检查焊工合格证号Rigid bus welding inspectionWeldor No.软母线 、组合母线安装8Flexible and combine bus installation2、母线接触面连接紧密检测:Bus contact. Tightness inspection实测力矩值 (N.m )
4、实测力矩值 ( N.m )实测力矩值 ( N.m )螺栓规格螺栓规格螺栓规格Actual torqueActual torqueActual torque(mm )最大值( mm )最大值(mm )最大值最小值最小值最小值Bolt spec.Max.Bolt spec.Max.Bolt spec.Max.Min.Min.Min.3、软母线弛度 :Flexible bus sag inspection软母线名称Flexible bus name设计弛度 (mm )Design sag.专业学习资料.实测弛度 (mm )Actual sag4、母线相同 、对地最小距离检测 :Bus phase a
5、nd phase to earth min. Distance measure母线类别主母线分支母线Bus typeMainBranch实测最小相间距离(mm )Min. Phase to phase distance实测最小对地距离Min. Phase to earth distance备注:Remarks结论:Conclusion技术负责人施工人CheckOperator表 H-422项目 :Project蓄电池充(放)电记录装置 :Storage battery charging/Discharging recordUnit工号 :Section名称型号出厂日期NameModelManu
6、f. Date电压容量电池总数VoltageVAhcapacityNumber of battery电解液Electrolyte电解液化验单或合格证号蒸馏水化验单或合格证号Electrolyte report orcertificationNo.Distilled water report or certification No.注入时电解液温度电解液比重Electrolyte temp. at fillingSpecific gravity of electrolyte开始注入时间结束时间Filling start timeEnd time初充电First charging充电开始时间结束时
7、间Charging start timeEnd time单独补充充电的电池编号Separately charged cell No.放电Discharging.专业学习资料.放电开始时间结束时间Discharge startEnd timetime放电电流放电容量为额定容量的 % (换算到 25时)Discharge currentDischarging capacity% of rated capacity( at 25 )充(放)电特性曲线图 :( 充放电记录见附表)Charging/Discharging characteristic curve备注:Remarks结论:Conclusi
8、on技术负责人施工人CheckOperator表 H-424项目 :Project电机抽芯检查记录装置 :Motor loose-core inspection recordUnit工号 :Section名称位号检查日期NameTag. No.Inspection Date型号额定容量额定电压TypekWRated voltagekVRated capacity额定电流A接法绝缘等级Rated currentConnectionInsulation class转速转子结构防爆等级Explosion proofr/minRotor structureRotation speedclass出厂编号
9、制造厂防护等级Manufacturer No.ManufacturerPrevention class检查内容标记备注Installation contentsMarkRemark.专业学习资料.铁芯轴颈无伤痕锈蚀No Damage & corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage & corrosion on surface of commutator and slip-ring绕组绝缘层完好 ,绑线无松动Winding insulation coating and fixing inspection绕组连接正
10、确 ,焊接良好Winding connection and welding inspection绕组电阻检测合格Winding resistance inspection定子槽楔无断裂凸出及松动,端部槽楔牢固Stator slot wedge inspection转子平衡块紧固 ,平衡螺丝锁车Rotor balance block and bolt fixing inspection风扇完好 ,方向正确Fan inspection磁极及铁轭固定良好Magnetic pole and hub fixing inspection励磁绕组紧固Exciter winding fixing inspec
11、tion鼠笼式电机转子导电条和端环焊接良好,浇铸无裂纹Rotor conductor and end link of squirrel-cage motor轴承滚动体与内 、外圈转动灵活无松动、卡涩Bearing rotating flexibility inspection加入轴承内的润滑脂已填满内部空间的三分之二Internal space of bearing is filled with lubrication grease电机机部清洁无杂物Motor internal cleanliness inspection结论:Conclusion技术负责人施工人CheckOperator表
12、H-425项目 :Project电机干燥记录装置 :Motor drying recordUnit工号 :Section名称位号干燥日期NameTag. No.Drying Date.专业学习资料.型号额定容量kW绝缘等级TypeRated capacityInsulation class定子电压转子电压V制造厂VRotor voltageManufacturerStator voltage定子电流转子电流出厂日期ARotor currentAManuf. DateStator current接线转速r/min出厂编号ConnectionRotation speedManufacturer N
13、o.干燥方法简述Brief discription of drying method干燥开始时间年月日时分Drying start timeDate干燥结束时间年月日时分Drying end timeDate干燥过程最高温度定子转子Max. drying temp.StatorStator干燥后绝缘电阻及吸收比Insulation resistance and absorptance after drying.测试部位定子对地转子对地Test positionStator to earthRotor to earth电机温度 ()MotorR15" (M )R60"(M )
14、KR15"( M )R60" (M )Ktemperature备注:Remarks结论:Conclusion技术负责人施工人CheckOperator表 H-426.专业学习资料.项目 :Project电机干燥记录附表装置 :Attached table for motor drying recordUnit工号 :Section温度()定子绝缘电阻干燥电流转子绝缘电阻时间Temp.(M)(A)备注Time(M)Remark23456Stator ins. resistanceDrying1Rotor ins. resistancecurrent.专业学习资料.测温点位置
15、:nTemp. measure position1.;2.;3.;4.;5.;6.;技术负责人施工人日期CheckOperatorDate表 H-427项目 :Project电机试车记录装置 :Motor test run recordUnit工号 :Section额定数据 Rated data试车记录数据 Test run record data环境电机名称或负载轴承温度温度绝缘空载电机位号试车容量电压绝缘电压电流()序号()Motor电流电阻电流温度日期(kW)(V)等级(V)(A)Bearing temp.No.Envi-ro(A)(M )(V)(A)name orDateCapaVol
16、-Ins.Vol-tNo-Lnmenttag. No.Curr.Ins.Vol-tMotor前后-citytageclassageoadtemp.resis.agetemp.FrontRearcurr.专业学习资料.备注:Remarks结论:Conclusion技术负责人施工人CheckOperator表 H-428项目:Project架空线路施工记录装置:Overhead line stringing recordUnit工号:Section线路名称施工日期Line nameDate线路电压线数线路长度VoltageLine numberLength线路起点线路终点Start placeEn
17、d place施工记录Stringing record电杆型号 、规格及数量拉线材料及组数Pole model, spec. QuantityStay material and quantity导线型号及规格路灯型号及数量Road lamp model andLine model and spec.quantity绝缘子型号及规格路灯线型号及规格Insulator model and spec.Road line model and spec.弛度Sag耐张杆号 (号一号 )Anchor pole (No. No.)设计弛度 (mm )Design sag实测驰度 (mm )Real sag环
18、境温度 ()Environment temp.专业学习资料.对地、交叉跨越距离测量 :Line to earth and to cross-over objects distance measurement跨越杆号被跨越物对最近杆 、塔的水平距离导线对被跨越物的最小垂直距离号一号被跨越物名称温度Cross-over(m )(m )Cross-over object()poleThe nearest distance betweenMin. Vertical distance from line tonameTemp.No.-N0.crossover object and polecross-o
19、ver object线中绝缘电阻 (M)AB,C,E,OBA ,C,E,OCA, B,E, OLine insulation resistance相位检查Phase sequence inspection备注:Remarks结论:Conclusion技术负责人施工人CheckOperator表 H-429项目 :避雷、接地装置安装记录Project装置 :Lightning conductor and earthing deviceUnitinstallation record工号 :Section名称施工图号NameDrawing No.专业学习资料.1.绘图或简述避雷及接地装置情况 (种类
20、 、材质、规格、长度、埋入深度 、数量 、连接方法 、尺寸及防腐等 ) Drawing or brief discription of the lightning conductor and earthing device (kind, material, specification, buried length, quantity, connection, dimension and anti-corrosion, etc.)2.接地电阻测量记录Grounding resistance measurement record序号测试位置接地电阻 ()试验日期当天及三天前天气情况No.Measu
21、re positionGround. resistanceMeasure dateWeather of the day and three days ago备注:Remarks结论:Conclusion技术负责人施工人试验人CheckOperatorTester.专业学习资料.表 H-430项目 :Project电气安装记录装置 :Electrical installation recordUnit工号 :Section.专业学习资料.技术负责人施工人CheckOperator表 H-431.专业学习资料.项目:Project交流电机试验报告装置:AC Motor test reportUni
22、t工号:Section名称位号试验日期NameTag. No.Test Date额定容量型号出厂编号绝缘等级Rated(kW )ModelManuf. No.Insulation classcapacity定子电压定子电流额定转速接线方式VStatorAStator voltageRated rpmr/mincurrentConnect mode转子电压转子电流相数防爆等级VAPhaseRotor voltageRotor currentE. P. classnumber直流电阻测量 DC Resistance measure温度 Temp.定子绕组相别Stator phase直流电阻 ()D
23、C Resistance转子绕组相别 ()Rotor phase直流电阻 ()DC Resistance各相直流电阻差别定子 Stator%;定子绕组极性DC Resistance deviation转子 Rotor%;Stator wind, polar.绝缘试验Insulation test直流耐压电压交流耐压电压时间时间直流泄漏电流 (绕组名称绝缘电阻吸收比(mm(kV)A)Wind( M)( kV)(mmAbsorp-t)DCDC LeakagenameIns. resisAC Withstanding)anceTimeWithstandingcurrentvoltageTimevol
24、tage定子绕组Statorwind转子绕组电机轴承绝缘电阻 (M )Rotor windBearing ins. resistance附属设备检查Auxiliary device test设备名称绝缘电阻 (M )直流电阻 ()Device nameInsulation resistanceDC Resistance起动电阻器Start-up resistor可变电阻器Variable resistor.专业学习资料.灭磁电阻器Magnetic extinguisher备注:Remarks结论:Conclusion技术负责人试验人CheckOperator表 H-432项目:Project直
25、流电机试验报告装置:DC motor test reportUnit工号:Section名称位号试验日期NameTag. No.Test Date额定容量型号出厂编号励磁方式RatedkWManuf. No.Excite modecapacityModel额定电压额定电流额定转速工作率Rated voltageVAr/minWork ratioRated currentRated rpm励磁电压励磁电流Excite voltageVAExcite current1. 试 验 与 检 查 Testand inspection环 境 温 度 : Environmenttemp.励磁绕组的绝缘电阻及
26、交流耐硬度试验M kVminExcite wind. Ins. R & AC withstanding voltage test电枢的绝缘电阻及交流耐压试验 MkVArmtr. Ins. R & AC withstanding voltage testmin励磁绕组的直流电阻Excite wind DC resistance电枢整流片间的直流电阻Armtr. Back-to-back DC resistance励磁可变电阻器的直流电阻DC R of Excite variable resistor.专业学习资料.绕组极性及其接线检查Wind. Polar. & conn
27、ection碳刷位置检查Brush position inspection2.发电机的空载特性Generator no-Load characteristics励磁电流 (A )Excite current电压 (V)Voltage备注:Remarks结论:Conclusion技术负责人试验人CheckOperator表 H-433项目:Project变压器试验报告装置:Transformer test reportUnit工号:Section名称位号试验日期NameTag. No.Test Date额定容量型号出厂编号接线组别RatedkVAManuf. No.ConnectionModel
28、.专业学习资料.capacity额定电压kV额定电流阻抗冷却方式Rated voltageRated currentA%ResistanceCool. mode直流电阻测量 : AC Resistance measure温度: Temp.高压侧低压侧电阻 ()HV side()()()()()ResistanceLV sideAaBbCc误差%Error变压比检查 :Transformer rate inspection高压侧电压 / 低压侧电压实测变压比变压比误差 (%)分接开关位置标称变比HV/LVReal rateRate errorTap positionNominal rateUAB
29、/UabUBC/UbcUCA/UcaABBCCAABBCCA(V)( V)(A)绝缘试验 :Insulation test绝缘电阻及吸收比交流耐压试验直流泄漏试验介质损失角正切值Ins. R and AbsorbtAC withstandingDC leakage testLoose tg 项目R60"/R15"voltage testItemR60"/吸收比电压时间电压电流温度Absorb-t( kV)( min )(kV )(A)tg R15"()anceVoltageTimeVoltage(%)CurrentTemp.高压 低压及地HV LV/Ea
30、rth低压 高压及地LVHV/Earth绝缘油试验 :油号#;五次击穿电压平均值 :kV接地组别或极性检查Ins. Oil test: oil No. , average voltage for 5 break down isConnection inspection备注:Remarks结论:Conclusion技术负责人试验人CheckOperator.专业学习资料.表 H-434项目:Project断路器试验报告装置:Circuit breaker test reportUnit工号:Section名称位号试验日期NameTag. No.Test Date型号额定电压额定电流开断电流kVR
31、atedAkAModelRated voltageM. currentcurrent操动机构型号操作电压出厂编号OperationOper. voltageManuf. No.mechanism导电回路直流电阻测量真空断路灭弧室真空度检查六氟化硫断路器气体压力Vacuum insp. for vacuumGas press. Insp. for SF 6DC Resistance of primary circuitbreakerbreaker灭弧触头 ()电压时间压力(Mpa )相别主触头 ()相别( min相别PhaseMain contactArc-Extinguishing(kV )P
32、hasePressurecontactPhase)VoltageTimeAAABBBCCC机械特性 :Mech. Characteristic最低合闸电压最低分闸电压分闸时间合闸时间分闸时间合闸时间Min. closeMin. opennOpen timeClose timeOpen timevoltageClose timevoltageVVssm/sm/s线圈试验 :绝缘试验 :Coil testInsulation. T est项目合闸接触器合闸线圈分闸线圈相别绝缘电阻交流试验电压时间Close(M )( kV )( min )ItemClose coilOpen coilPhasecontactIns. resis.AC test voltageTime直流电阻ADC Resis.B绝缘电阻M MM Ins. resis.C断路器在额定操作电压下分合闸次,动作良好 。Breaker open/closetime with
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 防洪防汛防台及水土保持专项施工方案
- 2025年登高架设高处作业复审模拟考试题库试卷及答案
- 2025年注册计量师(二级)考试真题汇编与押题试卷
- 2025年上海通管局类安全员b证考试题库及答案
- 老年护理师《护理学(医学)》2024-2025 学年春期末试卷及答案
- 白酒知识试卷及答案
- 电力安全规定课件
- 体力劳动者的营养配餐
- 库房安全管理课件下载
- 培训流程与方法
- DZ/T 0227-2010地质岩心钻探规程
- 工程暂估价协议书
- 护理安全与核心制度
- DB5132∕T 76-2022 熊猫级民宿的划分与评定
- 盘形基础制动装置一制动盘和合成闸片一制动盘课件
- 黑龙江省2025年1月普通高中学业水平合格性考试 数学试卷
- 医患沟通及知情告知制度执行情况检查表李
- 软件开发与维护服务合同样本
- 2025年移动初级解决方案经理认证理论考试指导题库-下(多选、判断题)
- DBJ51T 140-2020 四川省不透水土层地下室排水卸压抗浮技术标准
- 《陆地水体及其相互关系》教学设计【高中地理(新课标)选必修1】
评论
0/150
提交评论