七年级数学上册 有理数乘法运算练习题_第1页
七年级数学上册 有理数乘法运算练习题_第2页
七年级数学上册 有理数乘法运算练习题_第3页
七年级数学上册 有理数乘法运算练习题_第4页
七年级数学上册 有理数乘法运算练习题_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、相信自己,趁着冷静,快速答题!人教版七年级数学上册 有理数乘法运算1、(+14)×(-6); 2、(-12)×(); 3、;4、 (-2)×(-7)×(+5)×; 5、6、 (-12)×(-15)×0×() 7、(-125)×28.8×()×() 8、 9、(-6)×(+8)-(-5)×(-9); 10、 11、 12、×(8-0.4+); 13、 14、(-13)×(-6) 15、-×0.1 16、(+1)×(-1)17、3

2、×(1)×() 18、2×4×(1)×(3)19、(-2)×5(-5)×(-2)×(-7) 20、(-6)×(+25)×(-0.04)21、1×(-)×(-) 22、(-2)×(-7)×(+5)×(-)23、(-)×(-2.4)×(+) 24、×(-12)25、(-+-)× 26、×0.2; 27、(-1)×(-) 28、(-7.23)×(+1)×(-1)×

3、0; 29、1.2×(-2)×(-2.5)×(-)30、(-+-+)×(-24); 31、(-3)×(+)×(-1)×(-4)×-(-)32、(-100)×(-20)-(-6) 33、(-7)×(-)+19×(-)-5×(-)34、(-4)×(-1)× 35、(-0.08)×(-2)×2×(-0.25)36、(-1+)×48 37、(125)×(25)×(5)×2×(4)

4、15;838、(36)×() 39、(56)×(32)+(44)×3240、5× 41、4×(96)×(0.25)× 42、(9)×43、()×(-0.26) 44、(-2)×31×(-0.5) 45、×(-5)×(-3) 46、(4)××(10)×0.5×(-3) 47、()××(-1.8) 48、(-0.25)×()×4×(-7) 49、()×()×()

5、 50、(8)×4×()×(0.75) 51、4×(96)×(0.25)×52、(+)×56 53、()×36 54、(-66)×-()() 55、(-36)×()56、()×(80.4) 57、25×-(-25)×25×58、(+)×72 59、×()×()×()七年级上数学专题训练 有理数乘法运算参考答案1、; 2、21; 3、; 4、; 5、; 6、0 ; 7、; 8、1000; 9、; 10、; 11、 ;

6、12、; 13、 ; 14、; 15、; 16、 ; 17、 ; 18、 ; 9、 ; 20、6 ; 21、; 22、; 23、 ; 24、-117 ; 25、 ; 26、; 27、 ; 28、0 ; 29、; 30、; 31、-14 ; 32、2006; 33、-22 ; 34、 ; 35、; 36、 ; 37、1000000 ; 38、; 39、384; 40、 ; 41、 ; 42、 ; 43、0.04 ; 44、31 ; 45、5 ; 46、-20 ; 47、 ; 48、 ;49、 ; 50、 ; 51、 ; 52、-19 ; 53、-25 ; 54、-121 ;55、25; 56、-

7、4.7 ; 57、 ; 58、78 ; 59、;to develop the details of the project quality assurance systems and quality assurance goals and supervise the quality inspection departments. Quality Department is supervising quality assurance Department, directly responsible to the Chief Engineer, by controlling the raw mat

8、erials, sample testing and construction process and quality control purposes. Quality Department the right to endanger the quality of construction and operation to be rejected or stopped. Substandard raw materials and not conducive to construction quality of technology . 14.2.3 quality supervision a

9、nd inspection system in order to ensure quality, the project shall be to establish a series of systems: quality assurance program; Construction technical supervision systems; Construction site management system; Construction triage and technical implementation of the programme; Quality of project re

10、ports; Site acceptance of materials, sample testing; Concrete test and mixture ratio determination; Other inspection system of supervision engineer is required. 14.2.4 quality management measures 1, job training to enhance staff quality consciousness, enhance quality, ensure quality assurance goals.

11、 2, according to the scientific, standardized, procedures, standardized operation, implementation of personnel, posts, site inspection and acceptance procedures. 3, technicians and construction team leader before the familiar with the drawings, quality standards and quality requirements specified in the contract, while explicitly project developed by the Ministry of construction and the quality ob

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论