CAPA-Procedure--纠正和预防措施程序_第1页
CAPA-Procedure--纠正和预防措施程序_第2页
CAPA-Procedure--纠正和预防措施程序_第3页
CAPA-Procedure--纠正和预防措施程序_第4页
CAPA-Procedure--纠正和预防措施程序_第5页
已阅读5页,还剩11页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、文件类型Document Type品质管理体系程序QMS PROCEDURE应用范围Application Scope通用GENERAL修订记录REVISION HISTORY版本Rev.修改内容Revised Contents作者Author生效日期EFF. DateAInitial releasing with ISO/TS16949 requirementsXXXNov.07,2006BChange the title from 改正和预防行动程序 “Correctiveand Preventive Action Procedure” 纠正和预防措施to “程序Procedure for

2、 Corrective & Preventive Action”XXXJan.10th, 2009CRevised the procedure to meet ISO13485 regulations (China) & CFR21 FDA 21 CFR QSR(Quality System Regulation) 820 (USA) requirementsXXX15-07-2014文件审批APPROVAL本文件须经相关部门工程师(或主管)签批,请作者指定。This document shall be reviewed by ISO Coordinator and. The

3、author shall determine.编写部门ORIGINATE DEPT.相关部门RELEVANT DEPT.部门名称DEPT. TITLEQAManufacturingMachiningEngineeringPE工程师姓名NAME OF ENGINEER工程师签署SIGNATURE经理姓名NAME OF MANAGER经理签署SIGNATURE管理者代表签署SIGNATURE OF M.R.Ditto总经理签署SIGNATURE OF GM.拒签理由Reason of reject:文件分发DISTRIBUTION部门DEPT.数量Q TY部门DEPT.数量Q TY部门DEPT.数

4、量Q TYEngineeringAssemblyOFFQA1PlatingSourcingHRStampingFinanceMaintenanceMolding1 目的 Purpose本程序规范了为消除存在或潜在的不合格而采取纠正预防措施的流程,以确保类似不合格不再发生或潜在不合格的发生,促进质量管理体系的持续改进。This procedure define the process of taking corrective and or preventive actions toEliminate existing or potential non-conformity, to prevent

5、 similar non-conformity fromReoccurring or occurring of potential non-conformity. Promote continuousImprovement of quality systems.2 范围 Scope本程序适用于公司质量管理体系范围内纠正和预防措施的制定、实施与验证。This procedure is applicable to the formulation, implementation and verification ofCorrective action and preventive action in

6、 the company quality management systems3 定义 Definition3.1 不合格:未满足指定要求。“要求”是指明示的、通常隐含的或必须履行的需求或期望,如法规、行业标准要求,公司文件要求等Non-conformity: Non-fulfillment of a specified requirement. “ requirement ” refers to the explic it, usually implicit, Or the need or expectation is a must to fulfill. Such as regulatio

7、n,industry requirement,company documents etc.3.2 关键不符合:违反法定工艺、超出内控质量标准或违反生产相关法规规定,将会造成产品整批报废、产品召回、重大客户投诉.不符合关系到安全、企业的品牌形象和产品的市场影响。Critical non-conformity : Violate legal process, beyond standard of internal control or violation of related regulation requirement , which will cause scrap of the whole

8、batch products, recall of product,major customer complains, The non-conformity related to safety , brand image of enterprise and negative market impact of product.3.3 纠正:存在不合格的处置包括修理,返工或调整。Correction: repair, rework, or adjustment relates to the disposition of an existing nonconformity.3.4 纠正措施:消除已发

9、生的不符合或者其他不期望的情况的原因的措施。Corrective action: the action taken to eliminate the causes of an existing nonconformity, defect or other undesirable situation in order to prevent recurrence.3.5 预防措施:消除潜在不符合或者其他不期望的情况的原因的措施。Preventive action: action taken to eliminate the cause of a potential nonconformity, d

10、efect, or other undesirable situation in order to prevent occurrence.一个不符合或者潜在不符合可能有多个原因。There can be more than one cause for non-conformity or a potential nonconformity.备注 1) 纠正和纠正措施是有区别的,纠正是针对不符合的,而纠正措施是针对不符 合的原因的。Correction and corrective actions are differen.t Correction is against nonconformity

11、 whereas corrective action is against the cause of non conformity.备注 2) 纠正措施用于防止不符合再发生,而预防措施用于防止不符合发生。Corrective action is taken to prevent recurrence of non conformity whereas preventive action is taken to prevent occurrence of non-conformity.3.6 趋势分析 - 一种数据分析,是指通过对CAPA 的输入以及输入之间交叉关系分析,根据趋势分析潜在质量问题

12、.Trend analysis One type of data analysis, through cross relationship analysis Between CAPA inputs, Identify the potential quality issues based on The trend analysis.3.7 风险控制在特定的水平内, 经过讨论采取保护措施以降低或控制对人、财产或环境的风险的过程。Risk control- In the specific level, per discussion the process taken protective actio

13、nsTo reduce or control risk on human, property or environment3.8 纠正预防措施负责人:负责协调某一特定纠正预防措施报告的决定和实施的个人。CAPA Responsibility: the person who is responsible for coordination of the specific CAPA report decision and implementation4 . 职责和权限RESPONSIBILITY AND AUTHORITY4.1 问题产生的主管部门负责主导对不合格执行分析、制定、执行相应的纠正措施,

14、对潜在不合格负责实施预防措施。The department in which Issues arising fromis responsible for leading of analyzing, Formulating and implementing corresponding corrective actions for the existing Nonconformities, and take preventive actions for the potential nonconformitie.s4.2 质量管理部门全面负责纠正措施与预防措施的运行:QA is responsibl

15、e for the centralized management of CAPA report品质文员负责纠正措施与预防措施报告编号, 归档管理QA clerk is responsible for the coding, registration and archive manageme.n tQA 工程师确定不符合是否需要有CAPA 流程,纠正与预防措施计划的审批及定期的统计分析 , 跟踪纠正预防措施的实施过程并验证其有效性。QA engineer is responsible for the determination if CAPA is needed,periodicalStatis

16、tical analysis, follow up the implementation of corrective & preventive actions and Verify the effectiveness品质经理负责所有CAPA 纠正预防措施计划及CAPA 关闭的审核。Quality manager is responsible for review of all corrective & preventive plan and Closure of CAPA.4.4 公司总经理负责CAPA 纠正预防措施计划及CAPA 关闭的的最终审批。Site leader is

17、 responsible for the final approval of all corrective&preventive plan and Closure of CAPA4.5 公司管理层负责对纠正预防措施进行年度评审Company management team is responsible for the annual review of correctiveActions and preventive actions.工作流程WORKING FLOW CHART16 / 12流程图 Flow Chart责任单位Owner5.接收活动Inspectionactivity市场

18、情况Marketsituation质量审核Quality管理评审Management安全问题SafetyissuesA工程师分析不良问题来CAPAquality data ,impact andtrend analysis to determineif CAPA neededQE analyze sources ofCAPA需要CAPA needed质量工程师产生CAPA(填写CAPA报告,并登记) QErelease CAPA report (fill in问题产生的主管部门组织调查原因确定根本原因类别Thedepartment responsible for the non-conform

19、alites organize toinvestigatethe cause of nonconformitiesand determine cause type执行纠正预防措施Implementation corrective and preventiveactions程序 Procedure其他过程分析数据Data analysis fromother processes不需要产生CAPANo neeD CAPAEnd不需要 No需要 YesCAPA各责任部门Each departmentQE/SQE/System coordinatorQE/SQE/System coordinatorC

20、ross function team问题根源产生的主管部门确定纠正预防措施 The department responsible for the root cause of non-conformalites identify报告管理层作为管理评审的输入Report to management team as input of MR无效 No有效 YesQE 核实及确认纠正预防QE Verify or validate theeffectiveness of correctived preventive actions文件化纠正预防措施及变更Document the corrective an

21、d preventiveactions and change培训相关的责任人纠正预防措施及变更Disseminate(Train) the corrective andpreventive actions and changes to concernedemployees质量主管每季度对CAPA数据进行分析 QE conduct CAPAdata analysis every quarterQE/SQE/System coordinator各责任部门Each departmentCAPAClose CAPA5 . 1 纠正预防措施输入: Input of corrective &pre

22、ventive actions1.1.1 纠正预防措施来自于质量管理体系范围内,引起产品不合格或潜在不合格或者其他质量问题的各过程。其输入有以下几个方面:The sources of CAPA are from each process that Caused non-conformity or potential nonConformity In the quality management system includes:1.1.1.1 和原材料, 半产品, 成品有关的接收活动,The inspection activities related to raw materials, in p

23、rocess products and finished goods,1.1.1.2 客户投诉, 产品退回等问题Customer complaints, products return etc. issues1.1.1.3 质量审核Quality audit1.1.1.4 管理评审Management review1.1.1.5 安全问题Safety issues1.1.1.6 其他必要的分析数据Other analysis data as necessary5.2 分析纠正预防措施输入Analyze CAPA source of data5.2.1 质量工程师根据分析纠正预防措施的输入, 如

24、果是关键的质量问题, 则需马上启动纠正预防措施, 如果是非关键问题, 则应对该问题进行分析之后确定是否启动纠正预防措施。Quality engineer refer to the attachment I to analyze the input of CAPA. For the key nonConformities, CAPA shall be launched immediately, for non- key non-formalities, need Conduct analysis on the issues, then determine if CAPA is needed to

25、 launch.5.2.2 所有的审核发现的不合格, 客户投诉,FQC退货以及管理评审将马上启动纠正预防措施。For all non-conformities raised during audit, customer complaints, FQC rejections and nonConformities from management review, CAPA shall be launched immediately5.2.3 必要时 , 运用适当的统计方法识别重复发生的质量问题。Appropriate statistical methodology shall be employe

26、d where necessary to detect recurring Quality problems统计方法包括Statistical methodology includes:柏拉图Pareto charts运行图Run charts控制图Control charts平均值和标准偏差Mean and standard deviation比较 t 检验 T tests for comparisons实验设计Experimental design (DOE)图形方法(鱼刺图,直方图,散布图,电子表格等)Graphical methods (fishbone diagrams, histo

27、grams, scatter plots, spreadsheets, etc.)5.3 纠正预防措施的启动Launch of CAPA5.3.1 经过对纠正预防措施输入分析并确认必要性后, 质量工程师将填写纠正预防措施报告,完成以下部分:Quality engineer shall fill in <CAPA report> per analysis on CAPA input 巨 and confirm the Necessity, the input includes:5.3.1.1 指定一个纠正预防措施控制号。编号规则为:纠正预防措施/年 /号码顺序。例: CAPA1400

28、1 (CAPA纠正预防措施=, 14=2014, 001= 这一年的第一份报告)。Specify one code# of CAPA, coding rule as: CAPA/Year/the sequence of code#.For example: CAPA14001 (CAPA=Corrective actions & Preventive actions, 14=2014, 001=the first report of the year.5.3.1.2 填写“提出人”和提出日期。Fill in “ sponsoarn” d sponsor date5.3.1.3 对纠正预

29、防措施问题进行描述。尽可能详细地参考相关程序,规定和客户要求等。附上所有有帮助的其他信息资料。Describe the issue in as much detail as possible reference to relevant procedures, Specification and customer requirements, attach other supporting data.5.3.2 质量工程师对纠正预防措施报告进行复制存放于纠正预防措施文档中以做跟踪之用。并将纠正预防措施报告原件,发给纠正预防措施负责人。Quality engineer copy CAPA repor

30、t and store in the folder <CAPA file> for follow up and Send the original CAPA report to the responsible person.5.3.3 同时质量工程师应在纠正预防措施跟踪记录表中记录报告编号、发出人、发出时间、质量问题类型及问题的描述以便于跟踪。Quality engineer shall record CAPA code, sponsor, time, quality issue types and issue5.3.4 问题产生的主管部门负责主导纠正预防措施的调查及措施制定直到完

31、成。除非得到质量管理部负责人的确认,纠正预防措施调查分析/制定措施必须在7个工作日内完成。Department functional leader is responsible for the investigation and actions of theCAPA until the completion.CAPA root cause investigation and actions shall beCompleted within 7 workdays unless it is confirmed by quality manager.5.4 不合格根源调查以确定根本原因Root ca

32、use analysis of non-conformities to identify the root cause5.4.1 调查有关产品,过程, 品质系统不合格的原因Investigate the cause of nonconformities relating to product, process, and the quality System.5.4.2 确定问题和特性Identify problem and characterize,5.4.3 确定范围和影响Determine scope and impact5.4.4 调查要根据人、机、料、法、环可能的影响因素Investi

33、gate refer to man, machine, material, method, environment etc. factors.5.4.5 问题根源分析工具Root cause analysis tools- 鱼刺图 Fishbone diagrams- 5 个为什么5” whys”- 故障树分析Fault-tree analysis- 其它 Among others5.4.6 确定问题根源Determine root cause指定一个根本原因以用于趋向分析。Specify root cause for the trend analysis.5.5 确定纠正预防措施Identi

34、fy corrective and preventive actions5.5.1 问题根源产生的主管部门针对根本原因制定全面的、适当的纠正和预防性措施, 采取纠正和预防性措施消除或减少存在的或潜在的不合格程度应与不合格的影响以及风险等级一致。The department responsible for the non-conformities shall define comprehensive, Appropriate corrective and preventive actions based on the root cause.The degree of corrective and

35、 preventive actions taken to eliminate or minimize actual or Potential nonconformities must be appropriate to the magnitude of the problem and Commensurate with the risks encountered.5.5.2 在纠正预防措施报告中记录将要采取的措施,指定责任人,并对每个措施计划指定完成日期,并要求责任人签字确认。Record the actions in the CAPA report>, define the respo

36、nsible person and completion Date for each action, request responsible person to sign for confirmation.5.5.3 在完成上述步骤后,纠正预防措施负责人会在报告的“CAPA负责人”处签署姓名和日期,并提交给部门经理审核及签名。然后纠正预防措施负责人把此份CAPA报告提交质量工程师以供其审核。After the above steps are completed, CAPA responsible person shall sign his (her) name And date and sub

37、mit the report to department functional leader for review and signature. 5.5.4 质量工程师将在纠正预防措施追踪表上记录“措施计划接收日期”。Quality engineer shall record the receipt date of CAPA in CAPA tracking log sheet.Then CAPA responsible person submit the CAPA report to quality engineer for review.5.6 执行纠正预防措施Implementation

38、 corrective and preventive actions5.6.1 责任部门负责人负责纠正预防措施的实施。The responsible department manager is responsible for the implementation of CAPA and Record changes.5.6.2 如果纠正措施没有在计划的日期内实施,质量工程师应将该情况报告给质量经理。如果在跟踪后3 个工作日之后没有进展,质量经理应将该情况报告给总经理并开出一份新的CAPA 报告If CAPAs are not implemented within the defined sch

39、edule, quality engineer shall report The Situation to quality manager, if no any progresses of 3 workdays after follow up, Quality Manager shall report the situation to site leader and issue a new CAPA report.5.7 核实及确认纠正预防措施有效性Verify or validate the effectiveness of corrective and preventive actions

40、5.7.1 质量工程师核实及确认纠正预防措施是否有效,对产品没有负面影响,确认包括:纠正预防措施是否有效?是否可能产生别的潜在不良?评审数据是否关联到核实及确认活动?措施实施后类似的问题是否存在?在纠正预防措施报告中记录验证方法和计划验证日期。Quality engineer verify or validate the corrective and preventive actions to ensure that such Actions are effective and do not adversely affect the produc,ts The verification or

41、validation Activity includes:Effectiveness:Did the actions work?Did it create other potential nonconformance?Review data associated with verification or validation activities, If similar quality problems Exist after implementation.Record the verification method and date in The CAPA report.5.7.2 如果质量

42、工程师验证纠正预防措施是有效的,不需要修改,质量工程师会在纠正预防措施报告处签署姓名和日期, , 并提交CAPA报告给品质经理审批。If Quality engineer verified or validated the corrective and preventive actions to be Effective, The CAPA Reports are not needed to revise, and then quality engineer shall sign His or her name and date in the CAPA report, and submit t

43、he CAPA report for QA manager Approval5.7.3 质量经理提交其批准的CAPA 报告给公司总经理作最终评审及签名。Quality manager submit the CAPA report to site leader for final review and signature.5.7.4 对关键不符合CAPA 纠正预防措施,需要上升到ITT ICS 运作总监审批For critical non-conformities, CAPA shall be escalate to ITT ICS operation director for Approval

44、.5.7.5 如果质量工程师验证纠正预防措施是无效的,此纠正预防措施报告需上升到公司总经理采取进一步行动计划。If Quality engineer verified or validated the corrective and preventive actions to be not Effective, Then CAPA report shall be escalated to site leader for further action plans. 注意 : 对措施计划的修改可根据实际情况在纠正预防措施开启的任何时间内进行。Note: The modification of act

45、ions plan can be done at any time of launching of CAPA based on The actual situation.5.8 文件化纠正预防措施及变更Document the corrective and preventive actions and change5.8.1 纠正预防措施经证实有效后,行动责任人需文件化纠正预防措施及变更及知会,培训相关人员。Action owners shall document the actions and changes after the corrective and preventive Actio

46、ns are verified effective and disseminate or train related employees.5.9 纠正预防措施报告的关闭CAPA Report closure5.9.1 确认批准的纠正预防措施已经全部完成,纠正预防措施的合理性、有效性和充分性证实后, CAPA 报告应予以关闭。品质工程师并在CAPA验证人签署姓名和日期。然后提交给品质经理,公司总经理评审签名。Confirm the approved corrective and preventive actions to be completed and actions are Verified as rationale, effectiveness, sufficiency, the CAPA report can be closed.Quality Engineer shall sign his /her name and date in the report. Then submit

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论