




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、.天马行空官方博客: ;QQ:1318241189;QQ群:175569632Supplier Self Assessment Guidelines1.0The supplier shall identify a single point of contact to serve as the overall champion responsible for compiling information from each individual section of the capability mapping.2.0The supplier shall identify section cham
2、pions for each section who will be responsible for ensuring all questions are answered thoroughly and accurately.3.0Each question of the capability mapping must be reviewed and scored prior to returning to Motorola. Strengths/Opportunities/Notes section to be fully utilized to support the score and
3、to provide future action plans3.1Any question, the supplier scores as a “4” should be assumed to be a “best practice” or “best-in-class”.3.2All questions scored as a “4” require following from the supplier3.2.1An explanation that describes the suppliers compliance with the “4” score3.2.2Evidence in
4、the form of documentation, records, charts, etc. are required to support a score of “4” and must be shown prior to the assessment team leaving the supplier facility.4.0The overall supplier champion will collect and review the self-assessment information from each of the suppliers section champions.5
5、.0The overall supplier champion will serve as Motorolas single point of contact for further discussion on any issues raised with the self-assessment response.6.0 The overall supplier champion will be responsible for ensuring that the self-assessment is completed in the time allotted by Motorola. 7.0
6、 A soft copy of the Capability Mapping form is available that can be opened in Microsoft Word. Check boxes can be checked automatically by double clicking. Supporting statements can be typed directly into the text boxes. The completed form must be emailed back to the Motorola team leader in the same
7、 format as sent. *;Supplier Name:Date:1.0Quality System1.1Quality Management0No reviews with management occur2Irregular reviews of quality metrics including field returns with management occur with some coverage of cycle time and on time deliveries4Regular reviews of quality metrics including field
8、returns with management occur with coverage of metrics and actions plans for improvement of cycle time, on time delivery, and internal assessments.Strengths/ Opportunities/ Notes:1.2ISO9001 or ISO9002 or QS90000Has no plans, no accreditation1Working towards approval2Evaluation date confirmed and reg
9、istrar identified3Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for less than 3 years, last external audit available with corrective actions4Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for 3 or more years, last external
10、audit available with corrective actions Strengths/ Opportunities/ Notes:1.3Internal Auditing of Quality Procedure System0No internal auditing exists1Auditing occurs, but there is no formal procedure2A formal procedure exists and is deployed3A formal procedure exists, audits are routinely scheduled a
11、nd deployed, corrective actions taken and results evident4A formal procedure exists, audits are routinely scheduled and deployed, corrective actions taken and results are achieved and reviewed with senior managementStrengths/ Opportunities/ Notes:1.4Management Responsibilities0No documentation exist
12、s for Responsibility / Authority1There is an organizational chart outlining Responsibilities, communicated to all employees2There is an organizational chart outlining Responsibilities included in the company quality manual3The responsibilities and authority of all department / functions clearly defi
13、ned (especially quality function)4The responsibilities and authority of all department / functions clearly defined and mapped (i.e. a Responsibilities, Authority, and Informed Matrix; RAI)Strengths/ Opportunities/ Notes:1.5Quality System Software Tools0No quality system software in use2Quality syste
14、m software which records defect traceability and trends, is in use for some areas & data is available for review within 24 hours4Quality system software which contains defect traceability and trends, is in use for all areas & is available on-line real-timeStrengths/ Opportunities/ Notes:1.6P
15、roduct and Production document control0No evidence of document control2Formal, controlled, documentation exists, non-conformances were observed4Formal, controlled documentation exists, NO non-conformances were observedStrengths/ Opportunities/ Notes:1.7 Customer Field Return Rate0Does not measure2Me
16、asures return rate and has established improvement goals4Measures return rate, has established improvement goals, and improvement plans with demonstrated resultsStrengths/ Opportunities/ Notes:1.8Failure Analysis Capability (Root Cause Material Analysis)0None2Contracted out4In-house facility or has
17、the knowledge and skills to interpret any subcontracted FAStrengths/ Opportunities/ Notes:1.9Benchmarking Improvement Results0Does not have evidence of benchmarking2Proactively participates in benchmarking industry best practices4Proactively participates in benchmarking industry best practices and h
18、as records on file by production area/technology of industry best practicesStrengths/ Opportunities/ Notes:2.0Business Systems2.1Business Disaster Recovery Plan0No plan exists2A plan has been fully developed and there are plans to implement4A plan has been fully addressed and is prepared for a catas
19、trophe in all factories where customer's products/data are made/stored which includes offsite software back up storageStrengths/ Opportunities/ Notes:2.2Capacity Planning0No planning process exists2Infrequent use of Capacity Planning process to forecast capital expenditures, few records exist4Ca
20、pacity Planning process occurs regularly to forecast capital expenditures, records on fileStrengths/ Opportunities/ Notes:2.3Environmental Control Program0No program exists2A limited environmental program exists and is documented and at a minimum there is evidence that the supplier is compliant to l
21、ocal and federal regulations4ISO 14001 certified, a documented comprehensive business strategy exists which drives the organization to adhere to all local and federal standards, with evidence that environmental impact audits are conducted and acted upon (examples include Lead Free, Halogen free, rec
22、ycling, waste elimination, showing plans and time scales)Strengths/ Opportunities/ Notes:2.4Internal Information Technology Systems Support0No full time staff dedicated to systems2Information Systems support is outsourced4Full time dedicated IT staff which supports all internal business, quality, an
23、d production control systemsStrengths/ Opportunities/ Notes:2.5Motorola Schedule Sharing 0No use of Schedule Sharing2Downloads weekly are used for production scheduling, if a new supplier, able and willing to receive internet based scheduling information. 4Downloads weekly are used for production sc
24、heduling and part commitments are returned to customerStrengths/ Opportunities/ Notes:2.6Percent of Supplier's Assessed Facility Revenue is from Motorola 0Greater than 40%2Between 20% and 40%4Less than 20%Strengths/ Opportunities/ Notes:2.7Housekeeping and Safety0No active housekeeping and safet
25、y programs exist2Active housekeeping and safety programs exist including audits, schedules, documentation, and reporting to goal4Aggressive housekeeping and safety goals and metrics are in place and are reviewed regularly with senior management and improvement plans are documentedStrengths/ Opportun
26、ities/ Notes:2.8Return Material Authorization Numbers (RMA) Cycle Time0RMA or equivalent numbers are assigned greater than 24 hours after request from customer2RMA or equivalent numbers are assigned in less than 24 hours after request from customer4RMA or equivalent numbers are assigned upon demandS
27、trengths/ Opportunities/ Notes:2.9Dedicated Global Motorola Account Manager0None, no plans: fragmented to local sales office2Motorola Account manager with direct sales responsibility4Dedicated Global Motorola Account ManagerStrengths/ Opportunities/ Notes:3.0Design Technology3.1Early Supplier Involv
28、ement Process0ESI records are not evident2Implementation of an ESI process is defined, limited experience, some records exist 4Normal business practice, a process is defined and the supplier has records demonstrating regular, successful application of ESI, customer cost savings is trackedStrengths/
29、Opportunities/ Notes:3.2Electronic Data Transfer and Design Software System (Computer Aided Design - CAD)0No electronic data transfer possible2Electronic data transfer and design software is adequate (may have to convert files)4Electronic data transfer and design software is compatible or exceeds Cu
30、stomer requirements, utilizing the latest improvements in design modeling technologyStrengths/ Opportunities/ Notes:3.3Calibration of Design Lab Test Equipment to Applicable Standards0Equipment is not in calibration2A calibration procedure with schedule, inventory, and recall systems exists, no defi
31、ciencies found4Calibration intervals are determined through analysis and all calibration occurs in a temperature and humidity controlled environmentStrengths/ Opportunities/ Notes:3.4Prototype Fabrication Capability0All prototype requirements are outsourced2Capable of some prototyping in house4Capab
32、le of prototype design and fabrication in-houseStrengths/ Opportunities/ Notes:3.5Design Evaluation Tools0No tool use evident2Design process utilizes basic design and evaluation tools (for example Accelerated Life Testing, Failure Mode Effects Analysis, thermal shock, mechanical shock, vibration, co
33、rrosive atmospheres)4Design process utilizes advanced tools for product reliability & design robustness (for example, Highly Accelerated Life Testing, Highly Accelerated Stress Screening, Advanced Finite Element Analysis)Strengths/ Opportunities/ Notes:3.6In-house Tooling Capability0All tooling
34、requirements are outsourced2Capable of tooling repair and maintenance in-house4Capable of tooling design, fabrication, repair, and maintenance in-houseStrengths/ Opportunities/ Notes:3.7Product Qualification/Certification Process0Has no procedure and/or process2Has a documented process with procedur
35、es, some records exist4Has a documented process with procedures, records exist for all new productsStrengths/ Opportunities/ Notes:3.8 New Product Introduction (NPI) - Internal Design Reviews and Project Management0Supplier has no NPI process 2A Project Manager leads all new product development desi
36、gn reviews at project initiation and at each prototype stage, tracks schedule, development cost and delivery 4Project Manager regularly reports project status to customers and senior management Strengths/ Opportunities/ Notes:3.9New Product Introduction (NPI) - Development Engineering to Manufacturi
37、ng Hand Over Process0Supplier has no documented process2Documented internal design reviews occur with required participation of Engineering, Manufacturing and Quality Assurance4Clearly defined responsibilities exist in project documentation for process characterization, work instruction development,
38、 cycle time/capacity planning, Advanced Quality Planning, and a Quality Control Plan, Manufacturing and Quality Assurance are required signatures in order for project to go into production Strengths/ Opportunities/ Notes:3.10Product Reliability Improvement Program0No program(s) in place2Some reliabi
39、lity testing occurs4Has documented programs being conducted which are used to predict product improvement/reliability, records existStrengths/ Opportunities/ Notes:3.11Design Process Avoids Hazardous and Environmentally Sensitive Materials0No consideration2Full consideration for disposal and traceab
40、ility of hazardous materials4No hazardous materials used in design processStrengths/ Opportunities/ Notes:4.0Production Technology4.1Equipment Condition0Equipment adds to cost, cycle time, or limits production flexibility2Equipment in good working condition, some equipment is latest technology for t
41、he commodity4All equipment is state of the art for the commodityStrengths/ Opportunities/ Notes:4.2Capable Equipment for Production0Equipment is not capable of producing product to the technology needed2Most equipment is capable of producing product to the technology needed4All equipment is capable
42、of producing product to the technology needed and is best-in-classStrengths/ Opportunities/ Notes:4.3Software Control (Computer Aided Manufacturing/Computer Integrated Manufacturing)0Not evident2Production machinery is computer controlled4Production machinery is networked to production MRP system an
43、d reports production quantities and defects on lineStrengths/ Opportunities/ Notes:4.4Defect Identification and Handling0Parts are inspected by the on-line operator, or by a dedicated inspector, defects separated from good material by hand2Some parts are inspected for critical parameters by the prod
44、uction machinery and can be automatically rejected and separated from good material4All parts are inspected by the production machinery for critical parameters and can be automatically rejected and separated from good materialStrengths/ Opportunities/ Notes:4.5Emerging Production Technologies Roadma
45、p0Not involved in emerging technologies2Acting upon a roadmap to incorporate new production technology, including timelines and funding4Acting upon a roadmap, which is aligned with Customers future needsStrengths/ Opportunities/ Notes:5.0Process Management5.1Work Instructions0No work instructions ex
46、ist, or work instructions are inadequate or do not match customer specifications2Work stations/work cells are defined, illustrated work instructions exist but are not thoroughly documented4All processes have defined work stations/work cells; illustrated work instructions exist, are followed, and mat
47、ch the latest issue of the customer's specificationStrengths/ Opportunities/ Notes:5.2Process Set-Up Checklists0No process checklists in use2Process checklists implemented on most processes (>50%)4Process checklists implemented on all processes and are documented with current proceduresStreng
48、ths/ Opportunities/ Notes:5.3Statistical Process Controls Implemented0No SPC in use2Some SPC in place4SPC in place for critical processes and adjustments to the process are made based on the SPC dataStrengths/ Opportunities/ Notes:5.4Measurement System Analysis (Gauge Repeatability & Reproducibi
49、lity Studies - G R & R)0No Measurement System Analysis completed2Some Measurement System Analysis for critical processes have taken place (G R & R above 30%, action plans exist for improvement)4All Measurement Systems for critical processes are below 10% G R & R Strengths/ Opportunities/
50、 Notes:5.5Process Characterization & Advanced Quality Planning (AQP)0No processes have been characterized / assessed2Many processes have been characterized / assessed (50%), (for those processes with Cpk's<1.5 there should be evidence and plans to address process optimization along the li
51、nes of AQP) 4All processes have been characterized / assessed (Cpk's>1.5 for all critical processes), with evidence of an AQP checklist containing:- Timing Plans, Process Flow Maps, Process Failure Mode and Effects Analysis (P-FMEA), Measurement Systems Analysis (MSA) such as Gauge Repeatabil
52、ity and Reproducibility studies, Quality Control Plans, Capability Studies, ongoing Statistical Process Control (SPC)Strengths/ Opportunities/ Notes:- The Number of Processes =- The Number of Processes characterized=- The Number of Processes with Cpk > 1 .5=- The Number under Variation Control =5
53、.6Production Related Preventive Maintenance Actions0PM procedures do not exist2PM procedures and schedules exist, records are available4Evidence of proof, mean time to assist, is used to determine the correct PM intervals, no non-conformances foundStrengths/ Opportunities/ Notes:5.7Product/Process C
54、hange Control (Due to Engineering/Process Change)0Change product/process not controlled2Change product/process controls exist for all manufacturing areas, are followed, records exist, and customer's are informed of change4Proactively informs customer prior for change and seeks confirmation and w
55、ritten approval before change is madeStrengths/ Opportunities/ Notes:5.8Calibration of Factory Test Equipment to Applicable Standards0Equipment is not in calibration2A calibration procedure with schedule, inventory, and recall systems exists, no deficiencies found4Calibration intervals are determined through analysis; and where required by manufacturer, all calibration occurs in a temperatur
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 难点解析-人教版八年级上册物理声现象《声音的特性》单元测评练习题(含答案详解)
- 2024年潜江市公安局招聘警务辅助人员考试真题
- 具有输入非线性的柔性高层建筑主动振动控制
- 2025国考鞍山市群团工作岗位申论模拟题及答案
- 达标测试人教版八年级上册物理声现象《声音的特性》定向测评试题(含答案解析版)
- 2025国考徐州市侦查办案岗位行测高频考点及答案
- 2025国考阿拉善盟文艺管理岗位申论模拟题及答案
- 2025国考白城市税务管理岗位行测高频考点及答案
- 2025国考锦州市财务管理岗位申论模拟题及答案
- 考点解析-苏科版八年级物理上册《物态变化》同步训练试卷(含答案详解版)
- 涟源2022年事业编招聘考试《公共基础知识》真题及答案解析【可复制版】
- GB/T 17553.1-1998识别卡无触点集成电路卡第1部分:物理特性
- 2023年西藏山南雅砻天然饮品有限公司招聘笔试模拟试题及答案解析
- 海南矿产资源概况
- (通用版)水利安全员考试试题库及答案
- 编版一年级下册 《荷叶圆圆》2022年小学语文作业设计
- 施工现场安全检查记录表(周)以及详细记录
- 汽车配件购销合同集合
- 雨污水管道表格全全套资料
- 石库门——中西合璧建筑的典范
- 数独比赛六宫练习题96道练习
评论
0/150
提交评论