文档简介
1、WPECDOC. NO.: QCDP-01REV. NO.: 0Page 1 of 6RULE FOR DESIGN CONTROL43210REV. NO.PREPARED BYREVIEWED BYAPPROVED BYACCEPTED BYWPECDOC. NO.: QCDP-01REV. NO.: 0Page 5 of 6RULE FOR DESIGN CONTROLThis rule is supplemental to QC Manual for design control.1. Authority and Responsibility1.1 The Manager of Des
2、ign Section1.1.1 The Manager of Design Section shall be responsible for administrating the design ofCode items and assuring that all design services done by others in accordance with the Code requirements.1.1.2 The Manager of Design Section shall be responsible for accepting the Customer'sSpecif
3、ication including drawings and other reference documents.1.1.3 When the Customer and /or other organizations request to submit the documents for their review and approval, the Manager of Design Section shall review all design documents that will be supplied to the customer to assure his requirements
4、 and provide the Document Transmittal Card (List NO. QCP-01-2).1.1.4 He shall be responsible for reviewing drawings, calculation sheet, material requisition, and Purchase specification prepared by the Design Engineer, to assure the compliance with current Code. Addenda and Customer's specificati
5、on.1.1.5 When proof test is necessary, he shall be responsible for implementing the test and provide the test report.1.2 The Design Engineers1.2.1 The Design Engineers shall be responsible for preparing drawings and calculation sheet of the Code items.1.2.2 The design engineers shall review the Cust
6、omer Specifications to verify that the Specification contains requirements and data in such detail as to constitute an adequate basis for selecting materials, designing, fabricating, testing and inspecting the Code Items, and that the Specification conforms to the requirements of the Code.1.2.3 The
7、Design Engineers will take part in proof test.1.2.4 The Design Engineers shall be responsible for revising the design documents in accordance with para. 4 of this rule.2. Design Process Control2.1 Design ProcessThe design process of pressure vessel is divided into two stages, the preliminary design
8、stage and the construction drawing design stage. The preliminary design means the basic design prepared for bidding or quoting purpose. For the cause of management, the quoting drawing shall be reviewed by the Design Section Manager and approved by the General Engineer. The routine procedure for pre
9、paration, review and approval of the construction drawing design shall conform to the requirements of the QC Manual.2.2 The Work of Respective Stage2.2.1 In the preliminary design, a comparison of technique and economy shall be made to indicate that the technology is advanced, the expense is reasona
10、ble, safety is ensured, and the design is in compliance with the Code requirements.WPECDOC. NO.: QCDP-01REV. NO.: 0Page 4 of 62.2.2 The construction-drawing design shall conform to the requirements of the ASME Code and the Customer's Specification.2.3 Design QualityThe designers shall implement
11、the authority and responsibility prescribed in para.1 above for acquiring good quality of design.3. Design Documents Control3.1 The design documents include the Customer's Specification, drawings and calculation sheet the Material Requisition including Purchase Specification, the Design Revision
12、 Notice and proof test report etc.3.2 The documents prepared by Design Section shall be registered and numbered by the Document Keeper of File Section.3.3 The documents received from other factories, such as the Customer's Specification shall be registered by the Document Keeper, and shall be is
13、sued to the concerned personnel by the Design Section Manager.3.4 The assignee of any document shall be registered in the Document List. The obsolete documents shall be handled in accordance with the provision of the QC Manual. Those documents without covered in the QC Manual shall be decided by the
14、 Design Section Manager.4. Revision of Design Document4.1 Responsibility and Procedure4.1.1 If a design document has to be revised during fabrication period, the original designer shallWPECDOC. NO.: QCDP-01REV. NO.: 0Page 5 of 6put forward the revision opinion. The routine procedure of review and ap
15、proval for revision shall be the same as the original.4.1.2 The original designer shall fill the Design Revision Column of the design document.4.1.3 The retained drawings and the drawings being used for manufacturing shall be revised and/or replaced by the latest drawings.4.1.4 The first drafting sh
16、all be revised.4.2 Methods of Revision4.2.1 The size, letter or figure to be revised shall be marked out by a thin line. The part marked out shall be visible for showing the content before revision. Then, the new size or letter or figure shall be made.4.2.2 The revision mark shall be shown near the
17、revision position. A thin line shall be drawn from the triangle of the revision mark to the letter or figure marked out, the revision times shall be written on the triangle with number. The same revision mark shall be used for the revision of parts in the same time.4.2.3 When revised, a revision blo
18、ck shall be made out on the assembly drawing. The format of revision block is shown as follows:REVISION MARKDESCRIPTIONPREPARED BYREVIEWED BYAPPROVED BY修改标记修改说明编制审核批准Method of filling revision block:The main cause and content of revision shall be filled in the revision block. As for those revisedWPECDOC. NO.: QCDP-01REV. NO.: 0Page 9 of 6parts which are caused by the revision of relevant part, its part number shall be filled in the revision block
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/Z 270-2026安全与韧性业务连续性管理体系业务连续性策略指南
- T/ZJSEE 0048.2-2025虚拟电厂 第2部分:信息交互功能规范
- T/JCJJ 048-2024钢渣资源回收利用一次处理工艺技术要求
- T/CNCA 065-2024二氧化碳深部咸水层地质封存泄漏监测指标体系
- T/CASMES 400-2024质子交换膜水电解制氢阳极催化剂 测试方法
- T/CSMT YB015-2025光电复合电离源飞行时间质谱仪性能测试方法
- GB/T 18591-2026焊接预热温度、道间温度及预热维持温度的测量
- 2027届重庆市沙坪坝区第八中学数学七上期末统考试题含解析
- 2025-2026学年辽宁省凤城市初中政治九年级期末上册自测核心强化题(附答案)
- PHP商城开发面试题及详细答案(实战版)
- 2026年溶聚丁苯橡胶行业洞察报告及未来五至十年发展趋势报告
- 2026年健康科普大赛基础测试题含答案
- 2026年四川省高考历史真题试卷
- 八年级物理上册期末《声现象》6大易错题专项训练
- 2026人教版六年级数学上册活动课《水是生命之源》教案
- 2026年四川省拟任县处级领导干部理论(任职资格考试)全真模拟试题及答案
- 钩吻碱中毒(断肠草中毒)的急诊处理
- 冷轧硅钢及金属制品深加工项目可行性研究报告模板拿地申报
- 制度壁垒经济效应-洞察与解读
- 设备日常维护保养培训课件
- 造林树种选择
评论
0/150
提交评论