1、合同Contract of Construction Project 合同编号: Contract Number: 工程名称: Project Name: 发包方 (甲方): 工程设计顾问 (北京)Employer (Party A): International Consulting Engineers ( Beijing) Limited 承包方(乙方) : 中寰艺高建筑装饰工程有限公司Contractor (Party B): Zhong Huanyigao Building Decoration Engineering Co. , Ltd 根据中华人民共和国合同法和建筑安装工程承包合同
2、条例及有关规定,为明确双方 在施工过程中的权利、义务和经济责任,经双方协商同意签订本合同。In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agr
3、ee to sign this contract.第一条 工程项目 Article 1, Project item1 工程地点: Project site:2. 工程范围: Scope of project3. 工程造价:人民币 元整 (该造价为包工包料价 )Project cost: PMB Yuan only(Cost of this contract is the contract price for labor and materials)第二条施工准备 Article 2, Preparation for construction 1甲方协助乙方办理临时水电及垂直运输,提供建筑图纸及
4、有关隐蔽障碍物的资料。Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .2乙方: . Party B: 负责施工区域的临时设施、水电管线的铺设、管理、使用和维修工作;Be responsible for the works of laying, management
5、, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area. 组织施工管理人员和材料、施工机械进场;Organize construction management staff and construction materials, construction machinery enter the Site. 负责在装修期间保持公共地方清洁及每天负责将装物料弃置于由管理处指定的垃圾收集处。Be responsible for keeping
6、public places clean during construction and packing construction material and leaving in the garbage collection place designated by management office each day.第三条工程期限 Article 3 Period of Construction1. 根据工期和使用需要,商定工程总施工期为 天(日历天) ,自 年 月 日开工 至 年 月 日完工According to the period of construction and the use
7、 need,the total construction periodagreed shall bedays (Calendar days), start from the date ofand complete on thedate of .2如遇下列情况,经甲方现场代表签证后,工期相应顺延:Construction period shall be prolonged upon Party A site representatives confirmation when the matters occur as follows. 按施工准备规定,甲方未协助乙方办理临时水电及垂直运输,影响进场
8、施工;According to the requirements of construction preparation, Party A fail tot assist Party B to apply for temporary water and electricity and vertical transportation and have an impact on Party B construction; s requirement of addition 因甲方提出增减项目而造成重大设计变更,因而影响进度; The material modification or change
9、of design due to the party A or deletion of project have the effect of hindrance on the progress of works. 未按合同规定拨付预付款、工程款而影响施工;Party A fail to pay the advance payment and construction cost to party B and impact the construction progress;人力不可抗拒的因素而延误工期。The delay of schedule of construction due to Fo
10、rce Majeure.第四条 工程质量 Article 4 The quality of project 一本工程质量经双方研究要求达到双方约定之验收标准。The quality of project should achieve the requirements of acceptance agreed by both parties.二乙方必须严格按照施工图纸、 说明文件和国家颁发的建筑工程规范、 规程和标准进行施 工,并接受甲方的监督。Party B should carry on the construction in strict accordance with drawing,
11、specification file and regulations and specifications authorized by the competent authorities and be under the supervision of Party A.Party B should, during the construction,三乙方在施工过程中必须遵守下列规定: comply with the provisions as follows:1 由乙方提供给甲方的所有材料必须经甲方同意方可使用,未按要求购买严禁使用; All materials provided by Part
12、y B should be subject to the approval of Party A prior to use, And none of the same being bought without conformity with Party A requirements can be used.2隐蔽工程必须经甲乙双方检查,方可进行下一道工序;The concealed works should be checked by both parties before the next progress;3工程竣工后,乙方按规定对工程实行保修,保修时间自通过竣工验收之日算起,保修期 一年
13、。Party B shall take the liability of maintenance following the complete of works. The period of maintenance shall be one year from the day of acceptance of complete.第五条 工程价款的支付与结算 Article 5 Payment and settlement of the contract price 合同总价 X50 %,即 元 The total con tract price 50%, which is Yua n.中期款
14、The payment of medium-term工程进度过半三日内 Within 3 (three) days after the progress more than half.合同总价X40 %,即元 The total con tract price40%, which isYuan.尾款 Final Payment竣工验收结算后七日内 settlement.Within 7 (seven) days after the completion acceptance and合同总价X10 %,即元 The total con tract price10%, which isYuan.A
15、rticle6 The Modification of Construction and Design 说明和有关技术资料, 作为施工的有效依据, 开工前由甲方组织第六条 施工与设计变更 一乙方交付的设计图纸、 签字认同,作为施工的补充依据,甲、乙双方均不得擅自修改。Design drawing, illustration and relevant technical data consigned by party B are thebasis for construction and shall be confirmed by party A s signature,dweheimchedi
16、sasthe supplementary basis and shall be modified by any party without authorization.二施工中如发现因甲方要求而发生的设计错误或严重不合理的地方, 乙方应及时以书面形 式通知甲方, 由甲方及时会同乙方等有关单位研究确定修改意见或变更设计文件,乙方按修改或变更的设计文件进行施工。若发生增加费用(包括返工损失、停工、窝工、人员和机构 设备调迁、材料构配件积压的实际损失)由甲方负责,并调整合同造价。If and when any error or material unreasonable problem of des
17、ign due to party A requirement, Party B shall notify Party A promptly in writing and decide the amendment or modification of the design documentation by the consultation and negotiation between parties and units concerned. Party B shall carry out construction according to the design documents modifi
18、ed or changed. If project cost increase (including the actual loss of rework loss, stoppage or slowdown, personnel and machine equipment relocated, material structures, fixtures backlog), shall be responsibility by Party A, and be adjusted the contract price together with Party B.三乙方在保证工程质量和不降低设计标准的
19、前提下, 提出修改设计、 修改工艺的合理化建 议,经甲方、设计单位或有关技术部门同意后采取实施。Any reasonable suggestion on the modifications of design and craft proposed by Party B, subject to the quality and without reducing standards of design, could be carried out upon the approval of Party A, design unit or concerned technical department.四甲
20、方如需设计变更, 必须作出正式修改通知书和修改图纸, 乙方才予实施。 重大修改和 增加造价时,必须另行协商,乙方才予实施。Party A should, if any necessary design change, make the formal amendment and modify drawings for Party B s implementation. Material changes and cost increased must benegotiated by both parties before Party B implement the same.第七条 工程验收 Ar
21、ticle 7 Acceptance of project 一工程施工中地下工程、结构工程必须具有隐蔽验收签证、试水、抗渗等验收合格记录。 甲方须及时办理验收签订手续。The underground engineering, structural engineering in the construction of project should be checked and with issue of certificate and the record of acceptance of water test, anti-permeability and so on. Party A shou
22、ld deal with the acceptance signed formalities timely.二工程竣工验收后,甲方才可使用Party A can use the project after completionacceptance 在规定的保修期内, 凡因施工造成的质量缺陷应由乙方无偿保修。 其保修条件、 范围和期限 按城乡建设环境保护部( 84 )城建字第 79 号通知印发的建筑工程保修办法(试行) 执 行。In the provision warranty period, any construction quality defects, Party B should ma
23、ke maintenance free of the quality defect due to construction, the scope and duration carry out according to the issuance of Cheng Jian No. 79 notification Construction engineering guarantee measures (Trial) by Urban and Rural Construction and Environmental Protection Department (84).第八条 违约责任 Articl
24、e 8 Liability for breach of contract 乙方的责任: Responsibility of Party B:一工程质量不符合合同规定的,负责无偿修理和返工。Take charge of gratis repair and rework if project quality doesnt meet contacts stipulation 二工程不能按合同规定的工期交付使用的, 按合同中关于建设工期提交或拖后的奖罚规定 偿付逾期罚款。If fail to deliver the construction according to the contract on t
25、ime, The overdue fines according to punishment or award of the provision concerning the delivery or delay.除竣工日期得以顺延外, 还应赔偿乙方由此甲方的责任: The responsibility of Party A: 一未能按照合同的规定履行自己应负的责任, 造成的实际损失。Failed to fulfill their responsibilities in accordance with the provisions of the contract, in addition to
26、the completion date to be postponed should be compensation for the actual loss of Party B .二工程中途停建、 缓建或由于设计变更以及设计错误造成的返工, 应采取措施弥补或减少 损失。同时,赔偿乙方由此造成的停工、窝工、返工、倒运、人员和机械设备调迁、材料和 构件积压的实际损失。The ongoing project is stopped, postponed or due to design changes and rework caused by design errors, should take measures to remedy or reduce losses. At the same time, compensate Part
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 抗过敏药的3大关键点
- 学校病事假管理制度
- 学校足球组管理制度
- 学生返乡后管理制度
- 完善与优化管理制度
- 定置目视化管理制度
- 实训室柴油管理制度
- 审车站员工管理制度
- 客运危险源管理制度
- 家乐福存货管理制度
- 2024年杭州市萧山区机关事业单位招聘真题
- 北京经济技术开发区教育领域招聘聘任制教师笔试真题2024
- 2025高考英语解析及其范文
- 2025年6月8日北京市事业单位面试真题及答案解析(下午卷)
- 人力资源测评期末考试试题及答案
- 四川省眉山市东坡区苏辙中学2025年七下英语期末质量跟踪监视试题含答案
- 2024年贵州省粮食储备集团有限公司招聘真题
- 2025年广告创意与传播策略课程期末试卷及答案
- 电子产品仓库管理制度与流程
- 美丽乡村建设项目可行性分析报告
- 浙江国企招聘2025杭州地铁科技有限公司招聘51人(第一批)笔试参考题库附带答案详解析
评论
0/150
提交评论