土木工程施工课程设计 完整版_第1页
土木工程施工课程设计 完整版_第2页
土木工程施工课程设计 完整版_第3页
土木工程施工课程设计 完整版_第4页
土木工程施工课程设计 完整版_第5页
已阅读5页,还剩24页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、土木工程施工课程设计 专业: 姓名: 班级: 学号: 导师: 时间:目录第一章 工程概况··········································

2、3;·········1 一、建筑、结构概况·······································

3、;········1 二、施工条件概况········································&

4、#183;········1第二章 工程量计算·······································

5、83;·········· 一、土方工程量······································&

6、#183;············· 二、基础工程工程量··································

7、83;············· 三、柱工程量···································&#

8、183;·················· 四、梁工程量······························&

9、#183;······················· 五、楼梯工程量·························

10、;··························· 六、预制板工程量·····················&#

11、183;···························· 七、工程量清单表····················

12、;······························第三章 施工方案··················

13、83;································· 一、施工段划分···············&

14、#183;···································· 二、工期控制············

15、·········································· 三、施工顺序·······

16、;··············································· 四、施工工艺·

17、3;·················································

18、3;·· 五、施工方法··············································

19、83;······ 六、施工时间··········································&#

20、183;·········· 七、模板方案······································&

21、#183;··············第四章 机械设备选择·································

22、83;··············第五章 主要技术措施··································

23、;··············第6章 施工总平面图··································&

24、#183;···········第七章 施工进度计划表····································&#

25、183;······第一章 工程概况一、建筑、结构概况建筑设计特点:本工程为某无线电厂生产车间,总体呈矩形分布,建筑物总高16.90m,总长54.30m,总宽21.3m;共四层,首层层高为4.5m,二、三标准层层高均为4.2m,顶层层高4.0m,屋顶为平屋顶。结构设计特点:本工程采用钢筋混凝土框架结构,框架柱统一截面尺寸为400mm×450mm,梁截面300mm×400mm、300mm×500mm和300mm×600mm等,楼面铺设180mm厚预应力钢筋混凝土空心板。采用柱下独立基础,尺寸均为2

26、050mm×2050mm,阶梯形;基础埋深为2.0m,下设100厚混凝土垫层;采用现浇混凝土板式楼梯;室外设计地坪标高为-0.45m。二、施工条件概况地形:平坦土质:亚粘土雨季:4-6月份地下水位:最高地下水位位于地面以下2.0m开工时间:2016年7月8日施工工期:275天(根据施工定额)钢筋:由加工厂加工成型后运至现场。混凝土:采用商品混凝土,水电由市区供应。交通:厂内可通行车辆材料:建筑材料齐全,技术力量雄厚,劳动力由公司工程处统一调配。第二章 工程量计算 根据施工段的划分原则,每层分两个施工段,分界线在5号轴线柱右侧。取15轴基础层为第1施工段,610轴基础层为第2施工段,其

27、他层依次类推。一、土方工程量根据土的类别取基坑放坡系数为0.5。基础尺寸:2.05m×2.05m。下底:(四周考虑0.3m的工作面)。上底:。采用机械挖土,考虑到基坑开挖尺寸及运输车辆的进出,选择采用条形开挖;不考虑地基梁所需挖土的土方量。(1)、开挖工程量第1施工段:010101003001 (3×6+0.15+1.025+0.1+0.3)+(4×6+0.15+1.025+0.1+0.3)×2+(3.75+1.025+0.1+0.3-1.325)+(6+1.025+0.1+0.3)×2××(2.1-0.45)×(

28、2.65+4.3)=512.74第2施工段:010101003002 (5×6-0.15+1.025+0.1+0.3)×3××(2.1-0.45)×(2.65+4.3)=538(2)、填方工程量a、基础回填:第1施工段:010103001001 512.74-41.51-18×(1.2-0.45)×0.45×0.45+2.25×2.25×0.1=459.38第2施工段:010103001002 538-34.59-15×(1.2-0.45)×0.45×0.45+2.

29、25×2.25×0.1=493.54b、房心回填:第1施工段:010103001003 (6-0.3)×(7.5-0.3)×7+(6-0.3)×(3.75-0.3)+(6-0.3)×(6-0.3)×2×0.45=167.4第2施工段:010103001004 (6-0.3)×(7.5-0.3)×10×0.45-0.3×0.4×(6-0.3) =184.0二、基础工程工程量(1)、基础混凝土工程量第1施工段:010501003001 18×(2.05

30、5;2.05×0.4+1.25×1.25×0.4)=41.51第2施工段:010501003002 15×(2.05×2.05×0.4+1.25×1.25×0.4)=34.59(2)、基础钢筋工程量第1施工段:010515001011 41.51×36=1.5t第2施工段:010515001012 34.59×36=1.25t(3)、基础模板工程量第1施工段:011703003001 18×(2.05×4+1.25×4)×0.4=95.04第2施工段:01

31、1703003002 15×(2.05×4+1.25×4)×0.4=79.2(4) 垫层混凝土量第1施工段:010501001001 2.07×0.1×19.275+25.275×2+3.55+7.125×2=18.14第2施工段:010501001002 2.07×0.1×(5×6-0.15+1.025+0.1)×3=19.243、 柱工程量(1)柱混凝土工程量第1施工段:010502001001 18×0.4×0.45×(4.5+1.2)+0

32、.2×0.3×(4.5+0.2) =18.75第2施工段:010502001002 15×0.4×0.45×(4.5+1.2)+0.25×0.3×(4.5+0.2)×2=16.1第3、5施工段:010502001003 18×0.4×0.45×4.2+0.2×0.3×4.2=13.86010502001005 18×0.4×0.45×4.2+0.2×0.3×4.2=13.86第4、6施工段:010502001004

33、15×0.4×0.45×4.2+0.25×0.3×4.2×2=11.97010502001006 15×0.4×0.45×4.2+0.25×0.3×4.2×2=11.97第7施工段:010502001007 18×0.4×0.45×4.0+0.2×0.3×4.0=13.2第8施工段:010502001008 15×0.4×0.45×4.0+0.25×0.3×4.0×2

34、=11.4(2) 柱钢筋工程量010515001021 18.75×130/1000=2.44t010515001022 16.1×130/1000=2.1t010515001023 13.86×130/1000=1.8t010515001024 11.97×130/1000=1.56t010515001025 13.86×130/1000=1.8t010515001026 11.97×130/1000=1.56t010515001027 13.2×130/1000=1.72t010515001028 11.4×1

35、30/1000=1.48t(3) 柱模板工程量第1施工段:011703007001 18×(0.4+0.45)×2×(4.5+1.2)+(0.2+0.3)×2×(4.5+0.2)=179.12第2施工段:011703007002 15×(0.4+0.45)×2×(4.5+1.2)+(0.25+0.3)×2×2×(4.5+0.2)=155.69第3、5施工段:011703007003 18×(0.4+0.45)×2×4.2+(0.2+0.3)×2&

36、#215;4.2=132.72011703007005 18×(0.4+0.45)×2×4.2+(0.2+0.3)×2×4.2=132.72第4、6施工段:011703007004 15×(0.4+0.45)×2×4.2+(0.25+0.3)×2×2×4.2=116.34011703007006 15×(0.4+0.45)×2×4.2+(0.25+0.3)×2×2×4.2=116.34第7施工段:011703007007 18

37、×(0.4+0.45)×2×4.2+(0.2+0.3)×2×4.0=132.52第8施工段011703007008 15×(0.4+0.45)×2×4.0+(0.25+0.3)×2×2×4.0=110.84、 梁工程量(1)梁混凝土工程量第1施工段:基础梁:010503001011 7×0.3×0.5×(6-0.4)+0.3×0.5×(6-0.2-0.15)+2×0.3×0.5×(6-0.45)+0.3&#

38、215;0.5×(7.5-0.45)+0.3×0.5×(3.75-0.45)+0.3×0.6×(7.5-0.45)+6×0.3×0.4×(6-0.4)+0.3×0.4×(6-0.45)+7×0.3×0.4×(7.5-0.45)=21.85首层梁:010503002011 矩形梁(6+7.5+3.75-3×0.45)+(7.5×2+6-3×0.45-0.25)+(7.5×2+6-3×0.45)+(7.5×2-

39、2×0.45)×0.3×0.8+(6-0.3)×0.2×0.4=17.03010503003011 异形梁(24-4×0.4)×(0.25×0.5+0.2×0.18)+(6×6-6×0.4)×(0.25×0.32+0.18×0.45)+(4×6-4×0.4)×(0.25×0.5+0.2×0.18)=12.86第2施工段:基础梁:010503001021 8×0.3×0.5×(6

40、-0.4)+2×0.3×0.5×(7.5-0.45)+2×0.3×0.6×(7.5-0.45)+6×0.3×0.4×(6-0.4)+6×0.3×0.4×(7.5-0.45)=16.86首层梁:010503002021 矩形梁2×(7.5×2-2×0.45)+2×(7.5×2-2×0.45-2×0.2)+(7.5×2-2×0.45)×0.3×0.8+(6-0.3)

41、15;0.2×0.4=17.18010503003021 异形梁(30-5×0.4)×(0.25×0.5+0.2×0.18)+(5×6-5×0.4)×(0.25×0.32+0.18×0.45)+(5×6-5×0.4)×(0.25×0.5+0.2×0.18)=13.53第3、5施工段:01050300203/51 矩形梁(6+7.5+3.75-3×0.45)+(7.5×2+6-3×0.45-0.25)+(7.5

42、5;2+6-3×0.45)+(7.5×2-2×0.45)×0.3×0.8+(6-0.3)×0.2×0.4=17.0301050300303/51 异形梁(24-4×0.4)×(0.25×0.5+0.2×0.18)+(6×6-6×0.4)×(0.25×0.32+0.18×0.45)+(4×6-4×0.4)×(0.25×0.5+0.2×0.18)=12.86第4、6施工段:010503002

43、04/61 矩形梁2×(7.5×2-2×0.45)+2×(7.5×2-2×0.45-2×0.2)+(7.5×2-2×0.45)×0.3×0.8+(6-0.3)×0.2×0.4=17.1801050300304/61 异形梁(30-5×0.4)×(0.25×0.5+0.2×0.18)+(5×6-5×0.4)×(0.25×0.32+0.18×0.45)+(5×6-5

44、15;0.4)×(0.25×0.5+0.2×0.18)=13.53第7施工段:010503002071 矩形梁(6+7.5+3.75-3×0.45)+(7.5×2+6-3×0.45)+(7.5×2+6-3×0.45)+(7.5×2-2×0.45)×0.3×0.7+(24-4×0.4)×0.25×0.5+(6×6-6×0.4)×(0.25×0.5+(4×6-4×0.4)×0.25

45、×0.5=24.35第8施工段:010503002081 矩形梁5×(7.5×2-2×0.45)×0.3×0.7+(30-5×0.4)×0.25×0.5+(5×6-5×0.4)×0.25×0.5+(5×6-5×0.4)×0.25×0.5=25.31(2) 梁钢筋工程量010515001031 (21.85+12.86)×115/1000+17.03×150/1000=6.55t010515001032 (1

46、6.86+13.53)×115/1000+17.18×150/1000=6.07t010515001033 12.86×115/1000+17.03×150/1000=4.03t010515001034 13.53×115/1000+17.18×150/1000=4.14t010515001035 12.86×115/1000+17.03×150/1000=4.03t010515001036 13.53×115/1000+17.18×150/1000=4.14t010515001037 14.5

47、5×150/1000+9.8×115/1000=3.31t010515001038 14.81×150/1000+10.50×115/1000=3.43t(3)梁模板工程量第1施工段:011703010001 基础梁7×0.5×2×(6-0.4)+0.5×2×(6-0.2-0.15)+2×0.5×2×(6-0.45)+0.5×2×(7.5-0.45)+0.5×2×(3.75-0.45)+2×0.6×(7.5-0.45

48、)+6×0.4×2×(6-0.4)+0.4×2×(6-0.45)+7×0.4×2×(7.5-0.45)=146.96011703011001 矩形梁(6+7.5+3.75-3×0.45)+(7.5×2+6-3×0.45-0.25)+(7.5×2+6-3×0.45)+(7.5×2-2×0.45)×(0.3+0.8×2)+(6-0.3)×(0.2+0.4×2)=136.90011703012001 异形梁(24

49、-4×0.4)×(0.5+0.25+0.32+0.2+0.18)+(6×6-6×0.4)×(0.18+0.1+0.32+0.25+0.32+0.1+0.18)+(4×6-4×0.4)×(0.18+0.2+0.32+0.25+0.5)=113.68第2施工段:011703010002 基础梁8×0.5×2×(6-0.4)+2×0.5×2×(7.5-0.45)+2×0.6×2×(7.5-0.45)+6×0.4×

50、2×(6-0.4)+6×0.4×2×(7.5-0.45)=136.54011703011002 矩形梁2×(7.5×2-2×0.45)+2×(7.5×2-2×0.45-2×0.2)+(7.5×2-2×0.45)×(0.3+0.8×2)+(6-0.3)×(0.2+0.4×2)=160.93011703012002 异形梁(30-5×0.4)×(0.5+0.25+0.32+0.2+0.18)+(5×6

51、-5×0.4)×(0.18+0.1+0.32+0.25+0.32+0.1+0.18)+(5×6-5×0.4)×(0.18+0.2+0.32+0.25+0.5)=121.8第3、5施工段:011703011003/5 矩形梁(6+7.5+3.75-3×0.45)+(7.5×2+6-3×0.45-0.25)+(7.5×2+6-3×0.45)+(7.5×2-2×0.45)×(0.3+0.8×2)+(6-0.3)×(0.2+0.4×2)=136

52、.90011703012003/5 异形梁(24-4×0.4)×(0.5+0.25+0.32+0.2+0.18)+(6×6-6×0.4)×(0.18+0.1+0.32+0.25+0.32+0.1+0.18)+(4×6-4×0.4)×(0.18+0.2+0.32+0.25+0.5)=113.68第4、6施工段:011703011004/6 矩形梁2×(7.5×2-2×0.45)+2×(7.5×2-2×0.45-2×0.2)+(7.5×2-

53、2×0.45)×(0.3+0.8×2)+(6-0.3)×(0.2+0.4×2)=160.93011703012004/6 异形梁(30-5×0.4)×(0.5+0.25+0.32+0.2+0.18)+(5×6-5×0.4)×(0.18+0.1+0.32+0.25+0.32+0.1+0.18)+(5×6-5×0.4)×(0.18+0.2+0.32+0.25+0.5)=121.8第7施工段:011703011007 矩形梁(6+7.5+3.75-3×0.45)

54、+(7.5×2+6-3×0.45)+(7.5×2+6-3×0.45)+(7.5×2-2×0.45)×(0.3+2×0.7)+(24-4×0.4)×(0.25+2×0.5)+(6×6-6×0.4)×(0.25+2×0.5)+(4×6-4×0.4)×(0.25+2×0.5)=218.51第8施工段:011703011008 矩形梁5×(7.5×2-2×0.45)×(0.3

55、+2×0.7)+(30-5×0.4)×(0.25+2×0.5)+(5×6-5×0.4)×(0.25+2×0.5)+(5×6-5×0.4)×(0.25+2×0.5)=224.855、 楼梯工程量(1) 楼梯混凝土工程量010506001001 现浇楼梯3×2×(6-0.3)×(3.75-0.325)×0.2 =23.43(2) 楼梯钢筋工程量010515001041 现浇楼梯23.43×55/1000=1.29t(3) 楼梯模板

56、工程量011703029001 现浇直型3×2×(6-0.3)×(3.75-0.325)=117.146、 预制板工程量(1)预制板混凝土工程量010512002001 YKB6062:4×72×0.34=97.92010512002002 YKB6092:4×90×0.455=163.8第1施工段:YKB6062:32YKB6092:44第2施工段:YKB6062:40YKB6092:46(2)预制板钢筋工程量010515005001 后张法YKB6062钢筋:4×72×17.18/1000=4.95t

57、010515005002 后张法YKB6092钢筋:4×90×24.23/1000=8.73t7、 工程量清单表表一:土方工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010101003001第1施工段挖方亚粘土1.65m512.742010101003002第2施工段挖方亚粘土1.65m5383010103001001第1施工段基础回填亚粘土、原土及郊区运来459.384010103001002第2施工段基础回填亚粘土、原土及郊区运来493.545010103001003第1施工段房心回填亚粘土、原土及郊区运来167.46010103001004第2施工段

58、房心回填亚粘土、原土及郊区运来184表二:基础工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010501003001第1施工段基础混凝土基础高0.8m阶梯形41.5132010501003002第2施工段基础混凝土基础高0.8m阶梯形34.592.53010515001011第1施工段基础钢筋螺纹钢t1.50.54010515001012第2施工段基础钢筋螺纹钢t1.250.55011703003001第1施工段基础模板基础高0.8m阶梯形95.04装10.5拆46011703003002第2施工段基础模板基础高0.8m阶梯形79.2装9拆3.57010501001001第一施

59、工段基础垫层C15厚1018.141.58010501001002第二施工段基础垫层C15厚1019.241.5表三:柱工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010502001001第1施工段柱砼矩形柱普通砼18.753.52010502001002第2施工段柱砼矩形柱普通砼16.133010502001003第3施工段柱砼矩形柱普通砼13.862.54010502001004第4施工段柱砼矩形柱普通砼11.9725010502001005第5施工段柱砼矩形柱普通砼13.862.560105020010016第6施工段柱砼矩形柱普通砼11.972701050200100

60、7第7施工段柱砼矩形柱普通砼13.22.58010502001008第8施工段柱砼矩形柱普通砼11.429010515001021第1施工段柱钢筋螺纹钢t2.44110010515001022第2施工段柱钢筋螺纹钢t2.1111010515001023第3施工段柱钢筋螺纹钢t1.80.512010515001024第4施工段柱钢筋螺纹钢t1.560.513010515001025第5施工段柱钢筋螺纹钢t1.80.514010515001026第6施工段柱钢筋螺纹钢t1.560.515010515001027第7施工段柱钢筋螺纹钢t1.720.516010515001028第8施工段柱钢筋螺纹钢

61、t1.480.517011703007001第1施工段矩形柱400×450、250×300179.12装29拆8.518011703007002第2施工段矩形柱400×450、250×300155.69装25.5拆719011703007003第3施工段矩形柱400×450、250×300132.72装21.5拆620011703007004第4施工段矩形柱400×450、250×300116.34装19拆5.521011703007005第5施工段矩形柱400×450、250×300132.7

62、2装21.5拆622011703007006第6施工段矩形柱400×450、250×300116.34装19拆5.523011703007007第7施工段矩形柱400×450、250×300132.52装21.5拆624011703007008第8施工段矩形柱400×450、250×300110.8装18拆5表四:梁工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010503001011第1施工段基础梁砼普通砼21.854.52010503002011第1施工段矩形梁砼普通砼17.033011703012011第1施工段

63、异形梁砼普通砼12.864010503001021第2施工段基础梁砼普通砼16.864.65010503002021第2施工段矩形梁砼普通砼17.186011703012022第2施工段异形梁砼普通砼13.537010503002031第3施工段矩形梁砼普通砼17.0338011703012032第3施工段异形梁砼普通砼12.869010503002041第4施工段矩形梁砼普通砼17.18310011703012042第4施工段异形梁砼普通砼13.5311010503002051第5施工段矩形梁砼普通砼17.03312011703012052第5施工段异形梁砼普通砼12.86130105030

64、02061第6施工段矩形梁砼普通砼17.18314011703012062第6施工段异形梁砼普通砼13.5315010503002071第7施工段矩形梁砼普通砼24.352.516010503002081第8施工段矩形梁砼普通砼25.312.517010515001031第1施工段钢筋量螺纹钢t6.55318010515001032第2施工段钢筋量螺纹钢t6.072.519010515001033第3施工段钢筋量螺纹钢t4.03220010515001034第4施工段钢筋量螺纹钢t4.14221010515001035第5施工段钢筋量螺纹钢t4.03222010515001036第6施工段钢筋

65、量螺纹钢t4.14223010515001037第7施工段钢筋量螺纹钢t3.311.524010515001038第8施工段钢筋量螺纹钢t3.431.525011703010001第1施工段基础模板钢模、木模146.96装60拆2126011703011001第1施工段矩形模板钢模、木模136.9027011703012001第1施工段异形模板钢模、木模113.6828011703010002第2施工段基础模板钢模、木模136.54装63拆2229011703011002第2施工段矩形模板钢模、木模160.9330011703012002第2施工段异形模板钢模、木模121.8310117030

66、11003第3施工段矩形模板钢模、木模113.68装41.5拆14.532011703012003第3施工段异形模板钢模、木模136.5433011703011004第4施工段矩形模板钢模、木模160.93装42.5拆1534011703012004第4施工段异形模板钢模、木模121.835011703011005第5施工段矩形模板钢模、木模113.68装41.5拆14.536011703012005第5施工段异形模板钢模、木模136.5437011703011006第6施工段矩形模板钢模、木模160.93装42.5拆1538011703012006第6施工段异形模板钢模、木模121.8390

67、11703011007第7施工段矩形模板钢模、木模218.51装33拆11.540011703011008第8施工段矩形模板钢模、木模224.85装34拆12表五:楼梯工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010515001041现浇直型楼梯砼普通砼23.4352010515001041现浇直型楼梯钢筋螺纹钢t1.2913011703029001现浇直型楼梯模板钢模、木模117.14装113拆13.5表六:预制板工程量清单序号项目编号项目名称项目特征计量单位工程量人工/天1010512002001YKB6062h砼量普通砼97.929.52010512002002YKB

68、6092砼量普通砼163.815.53010515005001YKB6062钢筋后张法螺纹钢、钢绞线t4.951.54010515005002YKB6092钢筋后张法螺纹钢、钢绞线t8.732.55A1第1/3/5/7施工段YKB6062数量块321台班6A2第2/4/6/8施工段YKB6062数量块401台班7B1第1/3/5/7施工段YKB6062数量块441台班8B2第2/4/6/8施工段YKB6062数量块461台班第3章 施工方案针对该工程工期紧、结构体系复杂、工程量大、工序交叉多、场地狭窄、环境制约等特点,在保证工程质量和安全生产的前提下,应以工期为主导,精心组织、合理安排,充分利

69、用有效的时间和空间,采用先进的施工工艺,确保整个工程如期完成目标。施工方案选择如下:1、钢筋工程:钢筋由专人统一计划配料,钢筋由专门的钢筋加工车间加工,现场钢筋连接分别采用绑扎接头搭接,电渣压力焊、双面搭接焊等施工工艺。2、模板工程:基础承台及地梁、墙、梁、楼梯模板采用胶合板模板和钢模板。3、砼工程:砼全部采用预拌商品砼,由场外砼搅拌站供应,用砼搅拌运输车运至现场,砼泵送车输送砼。4、地面以上主体结构工程施工布置:地面以上主体结构工程支模和钢筋绑扎同时进行,在钢筋加工、砼浇筑方面进行流水作业。模板拟采用18厚木模板配制,支撑采用门字架搭设。外脚架采用落地式钢管脚手架。5、施工机械:工程现场设置

70、1台提升架,以供垂直运输。一、施工段划分 根据施工段的划分原则,每层分两个施工段,分界线在5号轴线柱右侧。取15轴基础层为第1施工段,610轴基础层为第2施工段,其他层依次类推。2、 工期控制(1)、计划编制原则根据总的施工部署和总体施工方案的安排,编制工程进度计划时以基础、主体及外墙装饰为主,利用好每一天的工作时间,分区组织施工,分段流水作业,来确保工程的工期要求,全面地完成本次招标范围内的工程项目,让建设单位满意。(2)、施工进度计划计划开工日期:2016年7月8日计划竣工日期:2017年4月8日总工期:275日历天三、施工顺序1、总体施工顺序:基础工程主体框架结构砌筑围护结构内外墙装修水

71、电安装、防雷测试竣工验收。2、各阶段施工顺序安排:基础阶段:±0.00以下基础(包括地面砼板)。测量放线基坑开挖、修边、检底、排水承台砼垫层放线承台、地梁回填土承台、地梁钢筋安装绑扎浇砼。主体阶段阶段:±0.00以上主体结构施工。绑扎柱筋隐蔽验收安装柱模板、梁板模板浇柱砼绑扎梁板钢筋隐蔽验收浇梁板砼下一楼层施工段施工。砌砖、室内装修施工随主体进度插入施工。装饰阶段:内外装饰。内装饰施工程序为:顶棚墙面楼地面。外墙面装饰为:外墙全高吊垂直线,逐层弹出水平控制线做灰饼、冲筋找平层抹灰安装门窗框贴外墙面砖。竣工阶段:室内外清理、竣工验收4、 施工工艺、施工方法1、工程测量(一)测

72、量任务根据施工的要求,通过测量工作的定位、放线,将建筑物的平面位置和高程测定到施工作业面上,为模板安装、墙体的砌筑和预埋安装提供依据。遵循先整体后局部、先高精度控制后分测的工作程序。(二)测量准备熟悉和校对图纸,掌握定位依据,熟悉移交的水准点、轴线、标高的位置和数据。测量仪器的选用及检定、校验。(三)、平面轴线控制网的布设确保轴线测量的准确性,工程轴线测量将由专业测量小组完成。定位测量工作完成后,项目部施工技术负责人会同工程处技术质量科、测量负责人,进行轴线闭合,轴线复核验收后,绘图通知建设单位组织有关单位现场验线,并办理签证手续。确认无误后,方可进行土方开挖施工。2、土方工程(一)土方开挖的

73、施工准备1、在基槽开挖之前,场内所有的红线桩及建筑物的定位桩全部经规划部门测量核准,一经校实后,项目部就落实专人对其进行定期检查复核,以保证测量桩红线点的准确性。2、边坡确定:在基槽开挖前,根据建设方提供的地质资料及周边工程的施工经验,通过国家规范及各工程施工资料的参考,确定土方开挖放坡,坡度暂定1:0.5。(二)土方回填质量保证措施1、填土由下而上分层铺填,每层土虚铺厚度不大于25cm,分层压实后厚度不得大于20cm。2、确保土的含水率在最优的含水量范围,土料含水量一般从手握成团,落地开花为宜。3、主体结构工程施工程序:定位放线柱布绑扎立柱模顶撑排架支梁模板梁板扎筋梁板柱砼水电预埋3.1、模

74、板工程施工1、柱模板:矩形柱模采用胶合板和50×100mm木枋,根据截面尺寸配制成定尺模板,柱边长800mm时采用3道坚向背枋。当边长增加(减少)300mm时,则背枋增加(减少)1根,柱包箍采用48钢管和12的螺杆组成。柱包箍上、下端两道距顶面和楼面为250mm。其中间的距为500mm,为保证柱模的侧向刚度,四周用活动钢管顶撑顶牢,层高超过4.0m的柱模支立搭成井字型排架稳固。当柱边长达700mm以上的,每增加200mm时,每边中间增加一道12钢筋拉杆(竖向全长排列)。2、梁板模:配二套模板,翻转使用,中途对损坏的模板陆续补充。支撑采用门式脚手架。(1)在柱模上弹出梁的轴线及水平线并

75、复核。(2)在安装梁模支架前,首层支撑系统,在专用支柱下脚要铺设通长脚手板,并且楼层间的上下支座应在一条直线上,支柱一般采用双排。支柱中间和下方加横杆或斜杆,立杆可调底座。(3)在支柱上调整预留梁底模板厚度,符合设计要求后,拉线安装梁底模板并找直。(4)在底模上绑扎钢筋,经检查合格后,清除杂物,安装梁侧模板,用铁钉钉牢,并钉上下锁口楞及外竖楞,附以斜撑。3、拆模:严格控制拆模时间,常温下柱模板要求拆除时强度不小于1.2MPa,即混凝土浇筑完毕12h左右。顶板模板拆除必须待同条件养护混凝土试块达到设计强度的75%100%。3、2、钢筋工程1、钢筋加工(1)钢筋加工的形状、尺寸必须符合设计要求。钢筋表面应洁净、无损伤,油渍、漆污和铁锈等应在使用前清除干净,带有粒状和片状锈的钢筋不得使用。(2)在施工过程中出现钢筋代换时,必须经设计部门及甲方、监理单位认可后,由项目工程师签发核定单,方能代换,其他人无权决定。2、钢筋绑扎柱钢筋绑扎(1)画箍筋间距线:在立好的柱子竖向钢筋上,按图纸要求用粉笔划箍筋间距线。(2)柱箍筋绑扎1)按已划好的箍筋位置线,将已套好的箍筋往上移动,由上往下绑扎,宜采用缠扣绑扎。2)箍筋与主筋要垂直,箍筋转有处与主筋交点均要绑扎,主筋与箍筋非转角部分的相交点成梅花交错绑扎。3)箍筋的弯钩叠合处应沿柱子竖筋交错布置,并绑扎牢固。4)柱上下两端箍筋应加密,加密区长度及加

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论