1、 Chapter 02 - Competitiveness, Strategy, and Productivity3.(1)(2)(3)(4)(5)(6)(7)WeekOutputWorker Cost$12x40Overhead Cost 1.5Material Cost$6Total CostMFP (2) ¸ (6)130,0002,8804,3202,7009,9003.03233,6003,3605,0402,82011,2202.99332,2003,3605,0402,76011,1602.89435,4003,8405,7602,88012,4802.84*refer

2、 to solved problem #2Multifactor productivity dropped steadily from a high of 3.03 to about 2.84.4.a.Before: 80 ¸ 5 = 16 carts per worker per hour.After: 84 ¸ 4 = 21 carts per worker per hour.b.Before: ($10 x 5 = $50) + $40 = $90; hence 80 ÷ $90 = .89 carts/$1.After: ($10 x 4 = $40) +

3、 $50 = $90; hence 84 ÷ $90 = .93 carts/$1.c.Labor productivity increased by 31.25% (21-16)/16).Multifactor productivity increased by 4.5% (.93-.89)/.89).*Machine ProductivityBefore: 80 ÷ 40 = 2 carts/$1.After: 84 ÷ 50 = 1.68 carts/$1.Productivity increased by -16% (1.68-2)/2)Chapter 0

4、3 - Product and Service Design6.Steps for Making Cash Withdrawal from an ATM1.Insert Card: Magnetic Strip Should be Facing Down2.Watch Screen for Instructions3.Select Transaction Options:1) Deposit2) Withdrawal3) Transfer4) Other4.Enter Information:1) PIN Number2) Select a Transaction and Account3)

5、Enter Amount of Transaction5.Deposit/Withdrawal:1) Depositplace in an envelope (which youll find near or in the ATM) and insert it into the deposit slot2) Withdrawallift the “Withdrawal Door,” being careful to remove all cash6.Remove card and receipt (which serves as the transaction record)8.Technic

6、al RequirementsIngredientsHandlingPreparationCustomer RequirementsTasteAppearanceTexture/consistencyChapter 04 - Strategic Capacity Planning for Products and Services2.Actual output = .8 (Effective capacity)Effective capacity = .5 (Design capacity)Actual output = (.5)(.8)(Effective capacity)Actual o

7、utput = (.4)(Design capacity)Actual output = 8 jobsUtilization = .410. a.Given:10 hrs. or 600 min. of operating time per day.250 days x 600 min. = 150,000 min. per year operating time.Total processing time by machineProductABC148,00064,00032,000248,00048,00036,000330,00036,00024,000460,00060,00030,0

8、00Total186,000208,000122,000You would have to buy two “A” machines at a total cost of $80,000, or two “B” machines at a total cost of $60,000, or one “C” machine at $80,000.b.Total cost for each type of machine:A (2): 186,000 min ¸ 60 = 3,100 hrs. x $10 = $31,000 + $80,000 = $111,000B (2) : 208

9、,000 ¸ 60 = 3,466.67 hrs. x $11 = $38,133 + $60,000 = $98,133C(1): 122,000 ¸ 60 = 2,033.33 hrs. x $12 = $24,400 + $80,000 = $104,400Buy 2 Bsthese have the lowest total cost.Chapter 05 - Process Selection and Facility Layout3adf752b4c4e9h5i6g3.Desired output = 4Operating time = 56 minutesTa

10、sk# of Following tasksPositional WeightA423B320C218D325E218F429G324H114I05a.First rule: most followers. Second rule: largest positional weight.Assembly Line Balancing Table (CT = 14)Work StationTaskTask TimeTime RemainingFeasible tasks RemainingIF59A,D,GA36B,GG6IID77B, EB25CC41IIIE410HH91IVI59b. Fir

11、st rule: Largest positional weight.Assembly Line Balancing Table (CT = 14)Work StationTaskTask TimeTime RemainingFeasible tasks RemainingIF59A,D,GD72IIG68A, EA35B,EB23IIIC410EE46IVH95II5c.abdcf1. egh1. 4.a.l.2. Minimum Ct = 1.3 minutesTaskFollowing tasksa4b3c3d2e3f2g1h0Work StationEligibleAssignTime

12、 RemainingIdle TimeIaA1.1b,c,e, (tie)B0.7C0.4E0.30.3IIdD0.00.0IIIf,gF0.5G0.20.2IVhH3.4.b.1.2. Assign a, b, c, d, and e to station 1: 2.3 minutes no idle timeAssign f, g, and h to station 2: 2.3 minutes3. 4. 7.15438762Chapter 06 - Work Design and Measurement3.ElementPROTNTAFjobST141

13、.15.4762.851.5051.2801.151.47131.151.05041.001.161.1601.151.334 Total4.3328.A = 24 + 10 + 14 = 48 minutes per 4 hours9.a.ElementPROTNTAST091.151.505551.151.09831.05.56.5881.15.676b.c.e = .01 minutes Chapter 07- Location Planning and Analysis1.FactorLocal bankSteel mi

14、llFood warehousePublic school1.Convenience for customersHLMHMH2.Attractiveness of buildingHLMMH3.Nearness to raw materialsLHLM4.Large amounts of powerLHLL5.Pollution controlsLHLL6.Labor cost and availabilityLMLL7.Transportation costsLMHMHM8.Construction costsMHMMHLocation (a)Location (b)4.FactorABCW

15、eightABC1.Business Services9552/918/910/910/92.Community Services7671/97/96/97/93.Real Estate Cost3871/93/98/97/94.Construction Costs5652/910/912/910/95.Cost of Living4781/94/97/98/96.Taxes5551/95/95/94/97.Transportation 6 7 81/9 6/9 7/9 8/9Total3944451.053/955/954/9Each factor has a weight of 1/7.a

16、.Composite Scores 394445777B or C is the best and A is least desirable.b.Business Services and Construction Costs both have a weight of 2/9; the other factors each have a weight of 1/9.5 x + 2 x + 2 x = 1 Þ x = 1/9c.Composite Scores ABC53/955/954/9B is the best followed by C and then A.5.Locati

17、onxyA37B82C46D41E 6 4Totals2520=åxi=25= 5.0=åyi=20= 4.0n5n5Hence, the center of gravity is at (5,4) and therefore the optimal location.Chapter 08 - Management of Quality1.ChecksheetWork TypeFrequencyLube and Oil12Brakes7Tires6Battery4Transmission1Total30127641Lube & OilBrakesTiresBatte

18、ryTrans.Paretobreaklunchbreak3210······························2.The run charts seems to show a pattern of errors possibly linked to break times or th

19、e end of the shift. Perhaps workers are becoming fatigued. If so, perhaps two 10 minute breaks in the morning and again in the afternoon instead of one 20 minute break could reduce some errors. Also, errors are occurring during the last few minutes before noon and the end of the shift, and those per

20、iods should also be given managements attention.Power offPersonLampMissingDidnt turncompletely onNot plugged inOutletdefectiveDefectiveBurned outLooseLamp fails to lightOtherCord4Chapter 9 - Quality Control4.SampleMeanRange179.482.6Mean Chart: ± A2= 79.96 ± 0.58(1.87)280.142.3= 79.96 ±

21、; 1.08380.141.2UCL = 81.04, LCL = 78.88479.601.7Range Chart: UCL = D4= 2.11(1.87) = 3.95580.022.0LCL = D3= 0(1.87) = 0680.381.4Both charts suggest the process is in control: Neither has any points outside the limits.6.n = 200 Control Limits = Thus, UCL is .0234 and LCL becomes 0.Since n = 200, the f

22、raction represented by each data point is half the amount shown. E.g., 1 defective = .005, 2 defectives = .01, etc.Sample 10 is too large. 7.Control limits: UCL is 16.266, LCL becomes 0.All values are within the limits.14. Let USL = Upper Specification Limit, LSL = Lower Specification Limit, = Proce

23、ss mean, s = Process standard deviationFor process H: For process K:Assuming the minimum acceptable is 1.33, since 1.0 < 1.33, the process is not capable.For process T:Since 1.33 = 1.33, the process is capable.Chapter 10 - Aggregate Planning and Master Scheduling7. a.No backlogs are allowedPeriod

24、Mar.Apr.MayJun.JulyAug.Sep.TotalForecast50445560504051350OutputRegular40404040404040280Overtime888883851Subcontract2031220019Output - Forecast0440033InventoryBeginning0040003Ending0400030Average022001.51.57Backlog00000000Costs:Regular 3,2003,2003,2003,2003,2003,2003,20022,400Overtime 960960960960960

25、3609606,120Subcontract 28004201,680280002,660Inventory 0202000151570Total4,4404,1804,6005,8404,4403,5754,17531,250b.Level strategyPeriodMar.Apr.MayJun.JulyAug.Sep.TotalForecast50445560504051350OutputRegular40404040404040280Overtime888888856Subcontract222222214Output - Forecast065100101InventoryBegin

26、ning0061001Ending0610010Average0.58Backlog000990018Costs:Regular 3,2003,2003,2003,2003,2003,2003,20022,400Overtime 9609609609609609609606,720Subcontract 2802802802802802802801,960Inventory 3035505580Backlog180180360Total4,4404,4704,4754,6254,6204,4454,44531,5208. Period123456TotalForecast16

27、0150160180170140960OutputRegular150150150150160160920Overtime1010010101050Subcontract0010100020Output- Forecast01001000InventoryBeginning00101000Ending01010000Average051050020Backlog0000000Costs:Regular 7,5007,5007,5007,5008,0008,00046,000Overtime 75075007507507503,750Subcontract 00800800001,600Inve

28、ntory 20402080Backlog000000Total8,2508,2708,3409,0709,0508,75051,430Chapter 11 - MRP and ERP1. a.F: 2G: 1H: 1J: 2 x 2 = 4L: 1 x 2 = 2A: 1 x 4 = 4D: 2 x 4 = 8J: 1 x 2 = 2D: 1 x 2 = 2Totals: F = 2; G = 1; H = 1; J = 6; D = 10; L = 2; A = 4StaplerTop AssemblyBase AssemblyCoverSpringSlide AssemblyBaseSt

29、rike PadRubber Pad 2SlideSpringb. 4.Master ScheduleDayBeg. Inv.1234567Quantity100150200Table Beg. Inv.1234567Gross requirements100150200Scheduled receiptsProjected on handNet requirements100150200Planned-order receipts100150200Planned-order releases100150200Wood SectionsBeg. Inv.1234567Gross require

30、ments200300400Scheduled receipts100Projected on hand100100Net requirements100300400Planned-order receipts100300400Planned-order releases400400Braces Beg. Inv.1234567Gross requirements300450600Scheduled receiptsProjected on hand60606060Net requirements240450600Planned-order receipts240450600Planned-o

31、rder releases240450600Legs Beg. Inv.1234567Gross requirements400600800Scheduled receiptsProjected on hand120120120120888871Net requirements280600800Planned-order receipts308660880Planned-order releases96888010.Week1234Material40806070Week1234Labor hr.160320240280Mach. hr.120240180210a. Capacity util

32、izationWeek1234Labor53.3%106.7%80%93.3%Machine60%120%90%105%b. Capacity utilization exceeds 100% for both labor and machine in week 2, and for machine alone in week 4.Production could be shifted to earlier or later weeks in which capacity is underutilized. Shifting to an earlier week would result in

33、 added carrying costs; shifting to later weeks would mean backorder costs.Another option would be to work overtime. Labor cost would increase due to overtime premium, a probable decrease in productivity, and possible increase in accidents.Chapter 12 - Inventory Management2. The following table conta

34、ins figures on the monthly volume and unit costs for a random sample of 16 items for a list of 2,000 inventory items.DollarItemUnit CostUsageUsageCategoryK34102002,000CK352560015,000AK36361505,400BM101625400CM2020801,600CZ458025016,000AF14203006,000BF953080024,000AF9920601,200CD45105505,500BD4812901

35、,080CD52151101,650CD57401204,800BN0830401,200CP05165008,000BP091030300Ca. See table.b. To allocate control efforts.c. It might be important for some reason other than dollar usage, such as cost of a stockout, usage highly correlated to an A item, etc.3.D = 1,215 bags/yr.S = $10H = $75a.b.Q/2 = 18/2

36、= 9 bagsc.d.e.Assuming that holding cost per bag increases by $9/bag/yearQ = 17 bagsIncrease by $1,428.71 $1,350 = $78.714.D = 40/day x 260 days/yr. = 10,400 packagesS = $60 H = $30a.b.c.Yesd. TC200 = 3,000 + 3,120 = $6,120 6,120 6,118.82 (only $1.18 higher than with EOQ, so 200 is acceptable.)7.H =

37、 $2/monthS = $55D1 = 100/month (months 16)D2 = 150/month (months 712)a.b.The EOQ model requires this.c.Discount of $10/order is equivalent to S 10 = $45 (revised ordering cost)16 TC74 =$148.32712TC91 =$181.6610.p = 50/ton/dayD= 20 tons/day x 200 days/yr. = 4,000 tons/yr.u = 20 tons/day200 days/yr.S

38、= $100H = $5/ton per yr.a.b.Average is tons approx. 3,098 bagsc.Run length = d.Runs per year =e.Q¢ = 258.2TC = TCorig. = $1,549.00 TCrev. = $ 774.50Savings would be $774.5015.RangePHQD = 4,900 seats/yr.0999$5.00$2.00495H = .4P1,0003,9994.951.98497 NFS = $504,0005,9994.901.96500 NF6,000+4.851.94

39、503 NFCompare TC495 with TC for all lower price breaks:TC495 =495($2) +4,900($50) + $5.00(4,900) = $25,4902495TC1,000 =1,000($1.98) +4,900($50) + $4.95(4,900) = $25,49021,000TC4,000 =4,000($1.96) +4,900($50) + $4.90(4,900) = $27,99124,000TC6,000 =6,000($1.94) +4,900($50) + $4.85(4,900) = $29,62626,0

40、00····4954975005031,0004,0006,000QuantityTCHence, one would be indifferent between 495 or 1,000 units22.d = 30 gal./dayROP = 170 gal.LT = 4 days,ss= ZsLT = 50 galRisk = 9% Z = 1.34Solving, sLT = 37.313% Z = 1.88, ss=1.88 x 37.31 = 70.14 gal.Chapter 13 - JIT and Lean Operations1.N

41、 = ?N =DT(1 + X)D = 80 pieces per hourCT = 75 min. = 1.25 hr.=80(1.25) (1.35) = 3C = 4545X = .354.The smallest daily quantity evenly divisible into all four quantities is 3. Therefore, use three cycles.ProductDaily quantityUnits per cycleA2121/3 = 7B1212/3 = 4C33/3 = 1D1515/3 = 55. a. Cycle 1234A 6655B 3333C 1111D 4455E 2222b. Cycle 1 2A 1111B 6 6C 2 2D 8 8E 4 4c. 4 cycles = lower inventory, more flexibility 2 cycles = fewer changeovers7. Net available time = 4

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论