1、CONTRACT FOR PROJECT INSTALLATION This Contract for project of installing Main Engine is made on_, by and between _ Company Ltd. (here- inafter called Party A) and _ Company Ltd. (hereinaftercalled Party B). 1.Name of installation work: _.2.Location of installation work: Party As_in Port A.3.Scope o
2、f installation work: As specified in the drawingsand statement attached.4.Time limit for completion:The installation work shall cordinate with the construction of _ in Party A, and shall be completed, including thetrial run for _, within _days after the completion of _.5.Total price of installation
3、work:_U.S. D only.6.Payment terms of installation work:First installment:Party A shall pay to Party B fifteen percent of the total pricefor installation work, i.e._U.S.D only, when thiscontract comes into effect.Second installment:Party A shall pay to Party B fifteen percent of the total pricefor in
4、stalatiorn work, i.e_U. S. D. only, at the commencement of construction installation.Third installment:Party A shall pay to Party B ten percent of the total pricefor installation work, i.e._U. S. D. only, duringthe installation of pipes.Fourth installment:Party A shall pay to Party B forty percent o
5、f the total pricefor installation work, i.e._U. S. D. only, at thetime when the main equipment arrives at the site.Fifth installment:Party A shall pay to Party B ten percent of the total pricefor installation work,i.e._U. S. D. only, upon comple - tion of the installation work.Sixth installment:Part
6、y A shall pay to Party B ten percent of the difference of the price for installation work, i.e._U. S. D. only, after the work received has been proved qualified.7.Penalty for default:In the event Party B shall fail to complete the work in timeowing to reasons that Party B shall be held liable, Party
7、 B shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day , i.e._U.S.D, only for each day of such default.8.Increase or decrease of work:In case Party A has to amend,increase or decrease the working schedule, the corresponding increase or de
8、crease of total priceshall be evaluated according to the terms and conditions betweenthe two Parties, Should the work be increased, the Parties shallenter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materi - als transported to th
9、e site have to be abandoned owing to amend - ment made by Party A, Party A shall, after having received thework, pay for each completed work or materials abandoned as perthe unit price specified to Party B.9.Supervision for progress:The supervision personnel appointed by Party A and its rep - resent
10、ative shall have the authority to supervise the progress orwork and give instruction. Party B shall perform correctly in ac - cordance with such instruction given by Party As personnel orrepresentative.10.Stopage work:Should Party A notify Party B to stop the work for reasonsbeyond the responsibilit
11、y of Party B, Party B can stop the workand claim from Party A the price of finished work, materials atsite and other reasonable expenses to be added or deducted fromthe paid installments.11.Custody of work:The completed work and the materials, tools, and equipment at site shall be under the custody
12、of Party B after commencement and before completion and delivery of the work. Unless in the event of Force Majeure, Party B shall be fully responsible for any damage of the work under the custody of Party B. In case of Force Majeure, Party B shall give a list of damage according to the actual condit
13、ion and suggest an expected price and date forrecovery from such damage to Party A for checking and payment.Should Party A decide not to continue with the work, thiscontract shall be terminated according to article 10 hereof.12.Warranty for work.Party B shall warrant the promised condition of the wo
14、rk within _ year(s) after the date of receiving the work by Party A. However, Party B shall not be liable to Acts of God or misuse of the work by Party A.13.Supplemental provisions:Party B shall be held responsible if Party As personnel or other people is injured due to the negligence of Party B dur
15、ingthe progress of construction. However, such responsibility shallrest upon Party A if the injury caused is due to the negligence of Party A of technicians contracted with Party A.14.Attachments :Attachments shall become an integral part of this contractand shall be as effective as any other provis
16、ions. Attachments include:(1) Drawings(2) An estimate of cost.15.Format of this contract:The contract shall be in duplicate with two texts to be heldseparately by the Parties hereof. Each of the Parties shall alsokeep two copies of the contract for record.16.Additional Provision :Maintenace of Main Engine.Party B shall provide free periodic maintenance service forthe Main Engine of _ for _ year(s) after the receiving of the work by Party
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 钢结构门式刚架施工安装工艺及流程
- 咖喱味的糖浆创新创业项目商业计划书
- 水产品定制化生产服务拓展与升级创新创业项目商业计划书
- 农产品智慧物流生态系统创新创业项目商业计划书
- 自动驾驶车辆模拟真实环境创新创业项目商业计划书
- 深圳技能考试题目及答案
- 朝花夕拾考试题及答案
- 五年级上册地方课程多媒体应用计划
- 小学数学教师师徒结对示范计划
- 高速公路非道路移动机械源头管控措施
- 粉煤灰运输应急事故处理流程
- 江苏省苏州市2025年中考语文试卷(含答案解析)
- 电商直播模式下消费者农产品购买意愿影响因素研究-以赣南脐橙为例
- 开封产城融合投资集团有限公司招聘笔试题库2025
- 排污许可证审核及环境应急管理服务方案投标文件(技术方案)
- 2025年中国软件测试行业市场深度分析及发展前景预测报告
- 2026版创新设计高考总复习数学人教A版学生用-学生答案一~五章
- 消防工程监理质量评估报告(填写范本)
- 1.2地球与地球仪(第1课时)课件七年级地理上册人教版
- 外观专利培训课件
- DB32∕T 4787-2024 城镇户外广告和店招标牌设施设置技术标准
评论
0/150
提交评论