1、1Use of Ford APQP Status Report福特APQP使用的报告Tong LeiSupplier Technical AssistanceFord Motor Company2Use of Ford APQP Status Report福特APQP使用的报告n APQP OverviewnAPQP概述n Introduction to Ford APQP Status Reporting Systemn介绍福特APQP使用报告系统n How to use Ford APQP Status Reporting Systemn怎样使用福特APQP报告系统n Q&An问答
2、3APQP OverviewnAPQP is a structured method for guiding an organization to execute the necessary actions to ensure that the product satisfies the customers. nAPQP is a supplier-led program that is applicable for all systems, subsystems and components levels.4APQP Overview- The Goal of APQPnThe goal o
3、f APQP is to facilitate communication between all involved personnel and disciplines in a program by completing all required steps on time, at acceptable cost and quality levels. Flawless product launch will result.5Elements of APQP (AIAG)n19 are from the AIAG APQP and Control Plan manual.Facilities
4、 / Tools / GaugesPrototype BuildsDrawings and SpecificationsTeam Feasibility CommitmentMeasurement Systems EvaluationPackaging SpecificationsProduction Trial RunPreliminary Process Capability StudyProduction Validation TestingProduction Part Approval (PSW)Design FMEADesign Verification Plan & Re
5、portPrototype Build Control PlanManufacturing Process Flow ChartProcess FMEAPre-Launch Control PlanOperation Process InstructionsProduction Control PlanDesign & Mfg. Review(s)6AIAG APQP Timing ChartFeedback Assessment & Corrective Action反馈、评估和纠正措施反馈、评估和纠正措施Product & Process Validation产品与
6、过程确认产品与过程确认Process Design & Development过程设计和开发过程设计和开发Product Design & Development产品设计和开发产品设计和开发Prototype Build样件制造样件制造Plan & Define计划与定义计划与定义7Ford APQP Status Reporting SystemnAn improvement of the AIAG APQP system.nFour additional elementsnElements start and finish are tied to program m
7、ilestones.8Purpose of APQP Status ReportnCommon APQP expectations for internal and external suppliers to Ford Motor CompanynCommon APQP process metricsnA common program status reporting formatnRoles and responsibilities for those involved in APQP element implementation.Establishing: 9Ford APQP Statu
8、s Reporting Systemn23 elements.19 elements from AIAG APQP, plus4 Ford unique elements. They are:nSourcing DecisionnCustomer Input RequirementsnSubcontractor APQP StatusnCraftsmanship10Approach of Ford APQPnThis status reporting guideline describes 23 key APQP elements.nFord Motor Company expectation
9、s are defined for these key elements in definitions, and detailed checklists.nThe status for these elements is summarized using metrics described in the Reporting section.nThis status reporting guideline is written from a supplier standpoint.11The Applicability of Ford APQPnAPQP status reporting is
10、a requirement of all internal and external suppliers to FordnAPQP must be done for new programs/parts and major part changes as appropriate.12APQP Process Flow13The APQP Process includes 5 main functions:nPlanning of the APQP elementsnExecution of the APQP elementsnMonitoring the Quality-of-Event of
11、 the execution of the elements, as well as the timing, by the team in-between milestonesnIssues ResolutionnStatus Reporting (minimum at each milestones)14Use of Ford APQP Status Reportn How to use Ford APQP Status Report for Emerging Market Re-sourcing Programs.15Backgrounds of APQP for Emerging Mar
12、ket Re-sourcing Programs - Ford APQP v3.2nFord APQP Status Report v3.2 is one Excel 26 work sheets.n2 Summary sheetsAPQP Status Report (linked)APQP Status Report (manual)n1 Information sheetn23 worksheets for 23 Ford APQP elements. One sheet for each element.1)Ford APQP Status Report v3.2 uses miles
13、tones from Ford FPDS Ford Product Development System.16Backgrounds of APQP for Emerging Market Re-sourcing Programs - Ford APQP v3.217Backgrounds of APQP for Emerging Market Re-sourcing Programs - FPDSnFPDS Ford Product Development System Ford uses FPDS to Plan, Design, Develop and Launch new vehicl
14、es.Championed by Ford PD.Contains 15 milestones. 12 of them are used in Ford APQP Status Report v3.2.18FPDSOptimizeVehicleSystemSubsystemComponentProduct/ProcessDesignCascadeVerifyDesign/Mfg. ConfirmationLaunch/Mass Prod.ConfirmationUpdateCorporateMemoryMANAGEDefineArchitectureProgram InputDEFINEDES
15、IGNVERIFY AND LAUNCHPS1KOPS2SIPASCPHSTPRCPJ1FSLSLRCC14.5041301925.5-35019FPDS Definitions 15 Milestones Kick-Off (The beginning of program specific work)开球-项目具体工作的开展 Pre#1 (Mission/vision & target customers defined)任务/愿景&目标顾客的定义 Pre#2 (Target ranges assessed)评估指标范围 Strategic Intent (Initial
16、program direction established)最初的计划方向建立 Strategic Confirmation (Teams confirms strategy/viability)团队确认策略/可行性 Proportions & Handpoints (Vehicle proportion frozen)车辆比例的冻结 Program Approval (All targets become objectives)项目批准-所有目的成为目标(ST) Surface Transfer (Interior/exterior surface provided)外观面的转移(内
17、外饰外观) Product Readiness (Designs ready for CP builds)产品准备就绪(准备设计CP结构)(CP) Confirmation Prototype (First CP vehicle available)确认模型(第一次CP车辆可行性分析)20FPDS Definitions 15 Milestones (contd) Change Cut-Off (Commitment to Job #1 timing) Launch Readiness (Engineering Sign-off complete) Launch Sign-Off (Ready
18、 to Launch) Job #1 Achieved (Start Production) Final Status21Backgrounds of APQP for Emerging Market Re-sourcing Programs - EMLPnEMLP Emerging Market Launch PlanDeveloped to track status of Emerging Market re-sourcing programs within Ford.Championed by Ford EMS PD.22Backgrounds - EMLP (contd)nEMLP E
19、merging Market Launch Plan7 milestones, from program approval to part arrival at Ford receiving plant.nGSSM+2W GSSM+2 weeks. EMLP kick-off; issue sourcing agreement. nPR Product Readiness. 2D drwgs/3D model/DFMEA received by supplier.nCP Confirmation Prototype. Prototype parts built; “DV” test start
20、ed.nESO Engineering Sign Off. “DV” test completed; nPSW/LS PSW/Launch Sign. PSW and functional sign-off completed.nSJ1 Supplier Job 1. Supplier ships out first production shipment.nIPD In Plant Date. Parts received at Ford plant(s).23Two Systems, One Objective Flawless Launch!APQP feeds EMLPEMLP(Cha
21、mpioned by Ford PD)APQP(Championed by Supplier)24APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2nAPQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); nAPQP v3.2 uses 12 FPDS milestones (for new programs). 25APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2FPDS Miles
22、tones Remain for ReferenceEMLP Milestones Added26APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2nAPQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); APQP v3.2 uses 12 FPDS milestones (for new programs). nAPQP for EM eliminates New Program specific requirements, which ar
23、e not required for Re-sourcing Programs, from APQP v3.2. Maintains original APQP requirements as guideline.27APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2Eliminates New Program specific requirementsMaintains original APQP requirements as guideline28APQP for Emerging Market Re-sourcingvs. Fo
24、rd APQP v3.2nAPQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); APQP v3.2 uses 12 FPDS milestones (for new programs). nAPQP for EM eliminates New Program specific requirements, which are not required for Re-sourcing Programs, from APQP v3.2. Maintains original APQP requiremen
25、ts as guideline.nChecklist includes additional EMLP unique Supplier responsible requirements for the 23 elements. (At bottom of the checklist for each element.)29APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2Additional EMLP unique Supplier responsible requirements30APQP for Emerging Market R
26、e-sourcingvs. Ford APQP v3.2nAPQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); APQP v3.2 uses 12 FPDS milestones (for new programs). nAPQP for EM eliminates New Program specific requirements, which are not required for Re-sourcing Programs, from APQP v3.2. Maintains original
27、 APQP requirements as guideline.nChecklist includes additional EMLP unique Supplier responsible requirements for the 23 elements. (At bottom of the checklist for each element.)nWorksheet of “Action Plan” has been added to APQP for EM, to reduce “copies and pastes” of action plans from 23 elements to
28、 the summary sheet.31APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2Sheet of “Action Plan” has been added.32APQP for Emerging Market Re-sourcingvs. Ford APQP v3.2nAPQP for EM Re-sourcing uses 7 EMLP milestones (for re-sourcing programs); APQP v3.2 uses 12 FPDS milestones (for new programs). n
29、APQP for EM eliminates New Program specific requirements, which are not required for Re-sourcing Programs, from APQP v3.2. Maintains original APQP requirements as guideline.nChecklist includes additional EMLP unique Supplier responsible requirements for the 23 elements. (At bottom of the checklist f
30、or each element.)nWorksheet of “Action Plan” has been added to APQP for EM, to reduce “copies and pastes” of action plans from 23 elements to the summary sheet.nFor forward model (new) programs, Ford APQP v3.2 should be used.33Complete APQP Status Report For EM Re-sourcing programsComplete Informati
31、on SheetInput milestone dates. Should be same as timing plan.Input Part Number and PPAP information.Input team information, for both supplier and Ford.Input program change history, if any.34Complete APQP Status Report For EM Re-sourcing programs - continuenComplete Program Information on sheet of “A
32、PQP Status Report (linked)”.35Complete APQP Status Report For EM Re-sourcing programs - continueReview status of 23 elements.Next slide uses status review of element 11, drawing and specs, at PR as an example.36Sample Check sheet at PRLight Gray shaded cells: Review expectation at these milestones.
33、If R or Y, this issue requires corrective actionIf R or Y, review at next milestone (until its G), even if “Finish Target” date is passed.Overall status is worst rating of all expectations. Manual input is NOT required.Record identified issue and corrective action here.Status Can be updated continuo
34、usly until Milestone Date is metPrior Milestone Status is FrozenInput actual start and finish dates for each expectation. 37Rating and Assessment G/Y/R StatusRiskColorDefinitionHighRed Target dates and/or deliverables are at risk. A recovery work plan is not available and/or implemented, or the work
35、 plan does not achieve program targets.ModerateYellow Target dates and/or deliverables are at risk, but a resourced recovery work plan has been developed to achieve program targets, and has been approved by the appropriate Management Team.LowGreen Target dates and deliverables are on track and meeti
36、ng objectives.38Complete APQP Status Report For EM Re-sourcing programs - continuenComplete the summary sheet on “APQP Status Report (linked)”.Auto-linked to the overall status of the checksheet for this element. Overall status is worst rating of all elements. Manual input is NOT required.39Complete APQP Status Report For EM Re-sourcing programs - continuenComplete action pl
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 规范安全资金使用承诺书5篇
- 辽宁省大石桥市水源镇九一贯制校2026年初三第一次模拟测试英语试题试卷含解析
- 合规经营诚信合作承诺书3篇范文
- 产品设计创意与原型工具
- 品牌形象设计与推广方案参考手册
- 客户服务流程优化实施指南
- 建筑公司混凝土浇筑质量控制标准化手册
- 市场营销平稳承诺函(7篇)
- (正式版)DB3210∕T 1073-2020 《玉米蚜虫绿色防控技术规程》
- 历史国防现代化起步和外交工作新突破课件2025-2026学年统编版八年级历史下册
- TCACM1315-2019中医内科临床诊疗指南阿尔茨海默病
- 农田转租合同协议书范本
- TSG Z7002-2022特种设备检测机构核准规则
- 检察院相关试题及答案
- 《激光雷达技术概述》课件
- 2025年全国中学生数学奥林匹克竞赛(预赛)模拟卷(全国高中数学联赛一试)(含解析)
- 2024-2025学年人教版四年级体育下册全册教案
- 多格列艾汀临床应用专家指导意见 2
- 2025年国家公务员考试行测逻辑判断100题及答案
- 危险废物及一般固体废物收集暂存转运项目环评资料环境影响
- GB/T 43982.11-2025地下供水管网非开挖修复用塑料管道系统第11部分:软管穿插内衬法
评论
0/150
提交评论