版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、SUPPLIER QUALITY ENGINEERINGAsia Pacific Supply Chain Management OfficeDell Computer Corporation IPO On Board TrainingSupplier Quality StandardPrepared by: Eric HohSUPPLIER QUALITY ENGINEERINGDell Confidential2Asia Pacific Supply Chain Management OfficeContentQuality System RequirementsContract Revi
2、ewDesign ControlDocument ControlSupplier Quality ControlProduct Identification and Lot TraceabilityProcess ControlInspection and TestingCalibrationInspection and Test StatusControl of Nonconforming ProductHandling, Storage, Packaging, and DeliveryQuality RecordsDeliverablesSUPPLIER QUALITY ENGINEERI
3、NGDell Confidential3Asia Pacific Supply Chain Management OfficeSupplier Quality StandardA high level standard to outline the quality program requirements for Dell SupplierRFQ/Contract shall take precedent if conflict with the SQS requirementsExceptions to SQS requirements must be approved by GSQESUP
4、PLIER QUALITY ENGINEERINGDell Confidential4Asia Pacific Supply Chain Management OfficeQuality System RequirementsQuality ProgramConsistent with ISO 9001 and 9002 requirements Management ResponsibilityDevelop company-wide quality policyEnsure the continuing suitability and effectiveness of the qualit
5、y systemMonitor compliance to the system, and to ensure corrective/preventive measures are implementedSUPPLIER QUALITY ENGINEERINGDell Confidential5Asia Pacific Supply Chain Management OfficeQuality System Requirements - ContinuedOrganizationSupports, implements and maintains the quality system at a
6、ll levels.Quality Policies, Procedures, and Work InstructionsDocumented quality program to ensure product and/or services comply with the requirementsQuality Management PlanQuality program used for the design, manufacture, test, and inspection of product delivered to DellSUPPLIER QUALITY ENGINEERING
7、Dell Confidential6Asia Pacific Supply Chain Management OfficeQuality System Requirements - ContinuedInternal Audit ProgramGap Analysis (Audit)System AuditsProcess/Product AuditsDell AuditsPeriodic basis, including sub-contractor facilitiesTrainingIdentify training requirementsQualification based on
8、education, training and/or experienceQualification, re-qualification, and disqualificationSUPPLIER QUALITY ENGINEERINGDell Confidential7Asia Pacific Supply Chain Management OfficeContract ReviewSupplier Should Assure:Dell requirements are understoodConflicts between specifications, drawings, and con
9、tract requirements are resolvedAssure that any requirements differing from those in the tender are resolvedThe Supplier has the capability to meet contractual requirements.SUPPLIER QUALITY ENGINEERINGDell Confidential8Asia Pacific Supply Chain Management OfficeDesign ControlDesign Development and Pl
10、anningOutlines activities and define responsibility for implementationDesign InputEnsure customer requirements, statutory and regulatory are clearly identified, documented, and reviewedDesign OutputMeets all design input requirements.Contains acceptance criteria per specifications.Identify safety an
11、d functional characteristicsSUPPLIER QUALITY ENGINEERINGDell Confidential9Asia Pacific Supply Chain Management OfficeDesign Control - ContinuedDesign ReviewReview at appropriate levels/key milestonesDesign VerificationDesign meets defined requirements at different design stages (i.e. EVT, DVT, PVT)D
12、esign ValidationDesign conforms to defined requirementsDesign ChangesIdentified, documented, researched and approved by authorized personnel at the Supplier. Final approval by Dell GSQE prior to implementationSUPPLIER QUALITY ENGINEERINGDell Confidential10Asia Pacific Supply Chain Management OfficeD
13、ocument ControlRevision controlled and available to all necessary personnelUpdate/remove obsolete documentationRed Line documentation can be accepted only if:Have been clearly markedReviewed and approved by appropriate authorized personnel with original signatures on every copyDate of issue and expi
14、ration dates are specifiedAll Red Lined documentation must be replaced by formal/controlled revision within 30 daysSUPPLIER QUALITY ENGINEERINGDell Confidential11Asia Pacific Supply Chain Management OfficeSupplier Quality ControlThe plan should covers:Quality goalsSurveys/auditsQuality program requi
15、rementsChange control requirementsTest and inspectionsFirst article inspectionsQuality data/informationSUPPLIER QUALITY ENGINEERINGDell Confidential12Asia Pacific Supply Chain Management OfficeProduct Identification and Lot TraceabilityTraceability through the finished product serial number during t
16、he below stages:IncomingStorageMaterial IssuingProductionDeliveryInstallationSUPPLIER QUALITY ENGINEERINGDell Confidential13Asia Pacific Supply Chain Management OfficeProcess ControlControlled ConditionsDocumented work instructionsIdentification of critical parameters, implementation of statistical
17、process controls, and initiation of corrective actionProofing out the manufacturing, inspection and test processes prior to mass productionManufacturing equipment validationWorkmanship criterionPreventive maintenance programSUPPLIER QUALITY ENGINEERINGDell Confidential14Asia Pacific Supply Chain Man
18、agement OfficeProcess ControlProcess QualificationAll processes shall be qualified by DellChange to qualified manufacturing process or material must obtain written approval from Dell.Process qualification shall include Supplier-generated process capability assessmentsProcess stability to be demonstr
19、ated and maintained via statistical methodsSUPPLIER QUALITY ENGINEERINGDell Confidential15Asia Pacific Supply Chain Management OfficeProcess ControlQuality MetricsIncoming Quality Assurance (IQA) resultsManufacturing YieldsTest Station YieldsInspection YieldsMean Time Between Failures (MTBF) demonst
20、ration dataOut of Box Audits (OBA)Annualized Failure Rate (AFR)/Annualized Return Rate (ARR) performanceReliability test resultsDell Initial Field Incident Rate (IFIR) and Line Reject Rate (LRR)SUPPLIER QUALITY ENGINEERINGDell Confidential16Asia Pacific Supply Chain Management OfficeProcess ControlC
21、ontinuous Improvement Process (CIP)A documented, systematic approach for identifying CIP focus areasDesign for quality initiative (i.e., HALT, FMEA, Margin Analysis, Tolerance Stack-up Analysis)Supplier management strategyManufacturing process controlsLRR and IFIR reduction plans to achieve Dell goa
22、lsSUPPLIER QUALITY ENGINEERINGDell Confidential17Asia Pacific Supply Chain Management OfficeInspection and TestingSource/Receiving Inspection and TestsWork instructionsSampling planIn-Process Inspections and TestingProcesses, and instructionsWorkmanship and functionalityFinal Inspection and TestingD
23、ell specific requirementsWorkmanship, assembly verification, and functionalitySUPPLIER QUALITY ENGINEERINGDell Confidential18Asia Pacific Supply Chain Management OfficeInspection and Testing - continuedShipping Inspection (OBA Testing/Inspection)Functionality, Appearance, Accessories, labeling, pack
24、aging, .Reliability TestingFailures to be containedControls for identification and recall if requiredMaintain Inspection and Test RecordsEvidence for acceptanceSUPPLIER QUALITY ENGINEERINGDell Confidential19Asia Pacific Supply Chain Management OfficeCalibrationCalibration ProceduresMeasurements, Acc
25、uracy, Equipment, Environmental conditionsRecall List (Calibration Schedule)Calibration notificationCalibration RecordsCalibration procedure applied, inspector, status/result, Standard traceabilityOut of Tolerance (Calibration) NoticesTraceability for product produced and accepted by the defective i
26、nstrumentSUPPLIER QUALITY ENGINEERINGDell Confidential20Asia Pacific Supply Chain Management OfficeInspection and Test StatusIdentification of the inspection and test statusTrack the acceptance statusSegregation of non-conforming productSUPPLIER QUALITY ENGINEERINGDell Confidential21Asia Pacific Sup
27、ply Chain Management OfficeControl of Nonconforming ProductReview and Disposition of Nonconforming ProductsMaterial Review Board (MRB)Design Engineering, Manufacturing Engineering, Procurement, and Quality EngineeringDispositionRework, Use as Is, Repaired, Scrap, ScreenNote: “Use as Is requires fina
28、l approval from Dell SQESUPPLIER QUALITY ENGINEERINGDell Confidential22Asia Pacific Supply Chain Management OfficeControl of Nonconforming ProductCorrective Action ProcessUse 8-D principles to track and close the CAInvestigate root causes, and identify corrective actionEliminate potential causes of
29、nonconformingEnsure corrective actions are effectiveImplement and record change in procedure8-D : Specific defect, Technical investigation/analysis, Root cause, Containment for defect, Corrective action plan, Preventive actions to preclude a recurrence, Verification of effectiveness of actionsCorrec
30、tive actions shall be closed within 30 days unless otherwise directed by Dell SQESUPPLIER QUALITY ENGINEERINGDell Confidential23Asia Pacific Supply Chain Management OfficeControl of Nonconforming ProductPrinciple for Corrective Action S M A R TPECIFICEASURABLECHIEVABLEELEVANTIME BOUNDSUPPLIER QUALITY ENGINEERINGDell Confidential24Asia Pacific Supply Chain Management Off
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 血液透析患者的透析后护理
- 上海工商职业技术学院《安装工程计量与计价》2025-2026学年第一学期期末试卷(B卷)
- 上海工商职业技术学院《安全生产与环境保护》2025-2026学年第一学期期末试卷(B卷)
- 上海工商职业技术学院《Android 移动应用开发课程设计》2025-2026学年第一学期期末试卷(B卷)
- 肱骨骨折的康复效果评估
- 老年患者活动能力评估与训练
- 上饶卫生健康职业学院《AutoCAD 绘图》2025-2026学年第一学期期末试卷(B卷)
- 上海音乐学院《安装工程概预算》2025-2026学年第一学期期末试卷(A卷)
- 上海音乐学院《Android 开发技术课程设计》2025-2026学年第一学期期末试卷(A卷)
- 上海震旦职业学院《安全系统工程》2025-2026学年第一学期期末试卷(B卷)
- 2023年浙江金华金东区编外工作人员招考聘用161人笔试题库含答案解析
- 隧道工程施工日常安全检查清单
- GB/T 5073-2005耐火材料压蠕变试验方法
- FZ/T 61009-2015纤维素纤维绒毯
- CB/T 3768-1996方形导缆孔
- 三年级上册英语试题-starter A阶段测试 新概念英语青少版 无答案
- 煤炭资源地质勘探抽水试验规程
- 材料力学教学课件第2章-轴向拉伸与压缩
- 中国企业海外上市全程操作ppt课件
- 高中语文新教材(人教版)目录
- 《建筑设计服务计费指导》
评论
0/150
提交评论