1、PAGE PAGE 16 第 页Construction & Organization DesignFor * Lingang 500MW Blade and Nacelle Project*风电临港500MW 叶片和机舱项目施工组织设计目录 Index TOC o 1-3 h z u HYPERLINK l _Toc235970742 第1部分施工组织设计总说明 PAGEREF _Toc235970742 h 1 HYPERLINK l _Toc235970743 1.1工程概况 Generals PAGEREF _Toc235970743 h 2 HYPERLINK l _Toc23597
2、0744 1.1.1项目情况 Condition PAGEREF _Toc235970744 h 2 HYPERLINK l _Toc235970745 1.1.2建筑结构概况 General of Building Structure PAGEREF _Toc235970745 h 3 HYPERLINK l _Toc235970746 1.1.3地质情况 Geological Condition PAGEREF _Toc235970746 h 6 HYPERLINK l _Toc235970747 1.1.4水纹及周围道路情况 Water wave and peripheral road
3、and underground pipelines PAGEREF _Toc235970747 h 6 HYPERLINK l _Toc235970748 1.1.5安全文明施工目标 Safety and civilized construction objectives PAGEREF _Toc235970748 h 7 HYPERLINK l _Toc235970749 1.1.6工程特点、难点及对策 Project difficulty and countermeasure PAGEREF _Toc235970749 h 8 HYPERLINK l _Toc235970750 1.2工程
4、目标 Project Objective PAGEREF _Toc235970750 h 10 HYPERLINK l _Toc235970751 1.2.1质量目标 Quality Objective PAGEREF _Toc235970751 h 10 HYPERLINK l _Toc235970752 1.2.2工期目标 Schedule Objective PAGEREF _Toc235970752 h 11 HYPERLINK l _Toc235970753 1.2.3安全、文明施工目标 Safety, Civilized Construction Goal PAGEREF _Toc
5、235970753 h 11 HYPERLINK l _Toc235970754 1.3施工大型机械的配备 PAGEREF _Toc235970754 h 11 HYPERLINK l _Toc235970755 Preparation of large equipment for construction PAGEREF _Toc235970755 h 11 HYPERLINK l _Toc235970756 1.4工程施工设想 Construction Consideration PAGEREF _Toc235970756 h 12 HYPERLINK l _Toc235970757 1.
6、5编制依据 Reference PAGEREF _Toc235970757 h 13 HYPERLINK l _Toc235970758 第2部分施工进度计划 PAGEREF _Toc235970758 h 1 HYPERLINK l _Toc235970759 2.1进度计划编制说明 Description of Schedule Preparation PAGEREF _Toc235970759 h 2 HYPERLINK l _Toc235970760 2.2施工流水段划分 PAGEREF _Toc235970760 h 2 HYPERLINK l _Toc235970761 Divis
7、ion of Streamlined Construction Section PAGEREF _Toc235970761 h 2 HYPERLINK l _Toc235970762 2.2.1施工流水段划分的原则 Principle of the Division of Streamlined Construction Section PAGEREF _Toc235970762 h 2 HYPERLINK l _Toc235970763 2.2.2流水段划分 Division of Streamlined Section PAGEREF _Toc235970763 h 3 HYPERLINK
8、 l _Toc235970764 2.3施工总进度计划 General Construction Schedule PAGEREF _Toc235970764 h 3 HYPERLINK l _Toc235970765 2.3.1总工期安排 General Schedule Arrangement PAGEREF _Toc235970765 h 3 HYPERLINK l _Toc235970766 2.3.2主要节点工期 Key Milestone Dates PAGEREF _Toc235970766 h 3 HYPERLINK l _Toc235970767 2.4施工进度计划表 Con
9、struction Schedule PAGEREF _Toc235970767 h 4 HYPERLINK l _Toc235970768 2.5工期保证措施 Measures to Guarantee Schedule Time PAGEREF _Toc235970768 h 4 HYPERLINK l _Toc235970769 2.5.1进度目标体系的要求 Requirement of Progress Objective System PAGEREF _Toc235970769 h 4 HYPERLINK l _Toc235970770 2.5.2成立工期保证领导班子 Establi
10、shment of Leading Team to Guarantee Scheduled Time PAGEREF _Toc235970770 h 5 HYPERLINK l _Toc235970771 2.5.3设备的保障 Equipment Guarantee PAGEREF _Toc235970771 h 6 HYPERLINK l _Toc235970772 第3部分施工机械配备 PAGEREF _Toc235970772 h 1 HYPERLINK l _Toc235970773 3.1施工机械的选择及布置 Option and Arrangement of Constructio
11、n Equipment PAGEREF _Toc235970773 h 2 HYPERLINK l _Toc235970774 3.2主要施工机械设备一览表 Schedule List of Main Construction Equipment PAGEREF _Toc235970774 h 3 HYPERLINK l _Toc235970775 3.3施工机械配备明细表 Deployment Breakdown of Construction Equipment PAGEREF _Toc235970775 h 4 HYPERLINK l _Toc235970776 第4部分施工平面布置 P
12、AGEREF _Toc235970776 h 1 HYPERLINK l _Toc235970777 4.1施工总平面布置 General Construction Layout Plan PAGEREF _Toc235970777 h 2 HYPERLINK l _Toc235970778 4.1.1材料堆场及加工场布置 Arrangement of Material Laydown Area and Working Shed PAGEREF _Toc235970778 h 6 HYPERLINK l _Toc235970779 4.2施工用水、用电方案 Construction Water
13、 and Electricity Plan PAGEREF _Toc235970779 h 7 HYPERLINK l _Toc235970780 4.2.1临时用电布置 Temporary Electrical Consumption PAGEREF _Toc235970780 h 7 HYPERLINK l _Toc235970781 4.2.2临时用水布置 Temporary Water Consumption PAGEREF _Toc235970781 h 8 HYPERLINK l _Toc235970782 4.3施工现场平面布置图(见附图)Construction Site La
14、yout Plan (See attached diagram) PAGEREF _Toc235970782 h 9 HYPERLINK l _Toc235970783 4.4施工现场临时用水、用电布置图。见附图Temporary Water and Electrical Distribution on Jobsite, see attached diagram PAGEREF _Toc235970783 h 9 HYPERLINK l _Toc235970784 第5部分施工方案 PAGEREF _Toc235970784 h 1 HYPERLINK l _Toc235970785 5.1施
15、工流程 Construction Flow PAGEREF _Toc235970785 h 1 HYPERLINK l _Toc235970786 5.1.1钢筋混凝土工程施工流程 Construction Process of Reinforced Concrete Engineering PAGEREF _Toc235970786 h 1 HYPERLINK l _Toc235970787 5.1.2钢结构工程施工流程 Construction Process of Steel Structure Work PAGEREF _Toc235970787 h 2 HYPERLINK l _To
16、c235970788 5.2施工总体设想方案 General Construction Consideration Plan PAGEREF _Toc235970788 h 1 HYPERLINK l _Toc235970789 5.2.1工程总体施工组织设想 Consideration for Organization of Overall Construction PAGEREF _Toc235970789 h 1 HYPERLINK l _Toc235970790 5.2.2基础结构工程施工设想 Consideration for Foundation Structure Constru
17、ction PAGEREF _Toc235970790 h 2 HYPERLINK l _Toc235970791 5.2.3主体结构工程施工设想 Consideration for Main Structure Construction PAGEREF _Toc235970791 h 2 HYPERLINK l _Toc235970792 5.3工程测量及测量复核方案 Engineering Survey and Review Check Plan PAGEREF _Toc235970792 h 3 HYPERLINK l _Toc235970793 5.3.1施工测量方案 Construc
18、tion Survey Plan PAGEREF _Toc235970793 h 3 HYPERLINK l _Toc235970794 5.3.2建立固定的观测路线 Establishment of Fixed Observing Route PAGEREF _Toc235970794 h 7 HYPERLINK l _Toc235970795 5.3.3沉降观测 Settlement Observation PAGEREF _Toc235970795 h 7 HYPERLINK l _Toc235970796 5.3.4测量复核 Review Check of Measurement PA
19、GEREF _Toc235970796 h 8 HYPERLINK l _Toc235970797 5.4基础及主体工程 Foundation and Main Work PAGEREF _Toc235970797 h 9 HYPERLINK l _Toc235970798 5.4.1施工准备 Construction Preparation PAGEREF _Toc235970798 h 9 HYPERLINK l _Toc235970799 5.4.2桩基础施工 Pile Foundation Construction PAGEREF _Toc235970799 h 10 HYPERLIN
20、K l _Toc235970800 5.4.3土方开挖工程 Earth Excavation Work PAGEREF _Toc235970800 h 16 HYPERLINK l _Toc235970801 5.4.4桩头连接施工 Pile Head Splicing Construction PAGEREF _Toc235970801 h 21 HYPERLINK l _Toc235970802 5.4.5钢筋工程 Reinforcement Work PAGEREF _Toc235970802 h 22 HYPERLINK l _Toc235970803 5.4.6模板工程 Formwo
21、rk PAGEREF _Toc235970803 h 32 HYPERLINK l _Toc235970804 5.4.7混凝土工程 Concrete Work PAGEREF _Toc235970804 h 38 HYPERLINK l _Toc235970805 5.4.8后浇带的施工 Post-concreting area construction PAGEREF _Toc235970805 h 53 HYPERLINK l _Toc235970806 5.5外脚手架工程 External scaffolding work PAGEREF _Toc235970806 h 56 HYPE
22、RLINK l _Toc235970807 5.5.1外脚手架的选择 Option of external scaffolding PAGEREF _Toc235970807 h 56 HYPERLINK l _Toc235970808 5.5.2脚手架搭设施工 Erection of scaffolding PAGEREF _Toc235970808 h 56 HYPERLINK l _Toc235970809 5.5.3注意事项 Points for Attention PAGEREF _Toc235970809 h 60 HYPERLINK l _Toc235970810 5.6钢结构工
23、程 Steel Structure Engineering PAGEREF _Toc235970810 h 65 HYPERLINK l _Toc235970811 5.6.1钢构工程概况 Overview of Steel Structure Engineering PAGEREF _Toc235970811 h 65 HYPERLINK l _Toc235970812 5.6.2本钢构工程特点 Features of the Steel Structure Engineering PAGEREF _Toc235970812 h 67 HYPERLINK l _Toc235970813 5.
24、6.3施工方法与技术措施Construction Methods and Technical Measures PAGEREF _Toc235970813 h 67 HYPERLINK l _Toc235970814 5.7安装工程Installation Project PAGEREF _Toc235970814 h 79 HYPERLINK l _Toc235970815 5.7.1通风及空调安装工程 Ventilation and Air Conditioner Installation Project PAGEREF _Toc235970815 h 91 HYPERLINK l _To
25、c235970816 5.7.2给水排水工程Water Supply and Sewerage Engineering PAGEREF _Toc235970816 h 112 HYPERLINK l _Toc235970817 5.7.3消防工程Fire Engineering PAGEREF _Toc235970817 h 135 HYPERLINK l _Toc235970818 5.7.4电气工程Electric Engineering PAGEREF _Toc235970818 h 149 HYPERLINK l _Toc235970819 5.7.5通信工程 Communicatio
26、n Engineering PAGEREF _Toc235970819 h 165 HYPERLINK l _Toc235970820 5.8装饰工程 Decoration Engineering PAGEREF _Toc235970820 h 182 HYPERLINK l _Toc235970821 5.8.1装饰工程施工程序 Construction procedure for decoration engineering PAGEREF _Toc235970821 h 182 HYPERLINK l _Toc235970822 5.8.2屋面工程 Roof Engineering PA
27、GEREF _Toc235970822 h 183 HYPERLINK l _Toc235970823 5.8.3抹灰工程 Plastering Engineering PAGEREF _Toc235970823 h 185 HYPERLINK l _Toc235970824 5.8.4吊顶工程Suspended Ceiling Engineering PAGEREF _Toc235970824 h 188 HYPERLINK l _Toc235970825 5.8.5墙面、顶棚乳胶漆饰面Emulsion Varnish Surface of Wall and Ceiling PAGEREF
28、_Toc235970825 h 190 HYPERLINK l _Toc235970826 5.8.6激光整平机施工厂房地坪Factory Terrace Construction by means of Laser Levelling Machine PAGEREF _Toc235970826 h 193 HYPERLINK l _Toc235970827 5.9室外绿化及道路工程 Outdoor afforestation and civil engineer PAGEREF _Toc235970827 h 206 HYPERLINK l _Toc235970828 5.9.1绿化工程概况
29、 Introduction to afforestation project PAGEREF _Toc235970828 h 206 HYPERLINK l _Toc235970829 5.9.2工程特点 Project features PAGEREF _Toc235970829 h 207 HYPERLINK l _Toc235970830 5.9.3主要施工方案和技术措施Main construction program and technical measures PAGEREF _Toc235970830 h 207 HYPERLINK l _Toc235970831 5.10与分包
30、协作和管理 Cooperation with Subcontractors and Management PAGEREF _Toc235970831 h 241 HYPERLINK l _Toc235970832 第6部分质量、安全、文明施工保障措施Section 2 Quality, Safety and Civilized Construction Guarantee Measures PAGEREF _Toc235970832 h 1 HYPERLINK l _Toc235970833 6.1质量保证措施Quality Guarantee Measures PAGEREF _Toc235
31、970833 h 1 HYPERLINK l _Toc235970834 6.1.1总承包质量管理组织机构Institutional Framework of Quality Management Of General Contractor PAGEREF _Toc235970834 h 1 HYPERLINK l _Toc235970835 6.1.2质量控制过程与阶段Quality Control Process and Stage PAGEREF _Toc235970835 h 2 HYPERLINK l _Toc235970836 6.1.3质量因素控制Quality Factor C
32、ontrol PAGEREF _Toc235970836 h 4 HYPERLINK l _Toc235970837 6.1.4质量控制方法 Quality Control Method PAGEREF _Toc235970837 h 6 HYPERLINK l _Toc235970838 6.1.5工程材料、设备控制Engineering Material and Equipment Control PAGEREF _Toc235970838 h 7 HYPERLINK l _Toc235970839 6.1.6施工工序的质量控制Quality Control of Construction
33、 Procedure PAGEREF _Toc235970839 h 8 HYPERLINK l _Toc235970840 6.2安全保证措施 Safety Guarantee Measures PAGEREF _Toc235970840 h 10 HYPERLINK l _Toc235970841 6.2.1安全目标 Safety Objective PAGEREF _Toc235970841 h 10 HYPERLINK l _Toc235970842 6.2.2安全实施依据 Safety Implementation Reference PAGEREF _Toc235970842 h
34、10 HYPERLINK l _Toc235970843 6.2.3安全、消防保证总体措施 General Safety and Fire Control Guarantee Measures PAGEREF _Toc235970843 h 12 HYPERLINK l _Toc235970844 6.2.4安全生产管理组织机构 Organization Chart for Management of Safety in Production PAGEREF _Toc235970844 h 13 HYPERLINK l _Toc235970845 6.2.5安全设施及其管理措施 Safety
35、facilities and other control measures PAGEREF _Toc235970845 h 14 HYPERLINK l _Toc235970846 6.2.6各级安全生产责任制 Safety in production responsibility at all levels PAGEREF _Toc235970846 h 18 HYPERLINK l _Toc235970847 6.2.7各项安全管理措施 Safety Control Measures for Each Work PAGEREF _Toc235970847 h 25 HYPERLINK l
36、_Toc235970848 6.2.8模板工程安全管理措施 Safety Control Measures for Formwork PAGEREF _Toc235970848 h 27 HYPERLINK l _Toc235970849 6.2.9施工用电安全措施 Safety Measures for Construction Electricity PAGEREF _Toc235970849 h 32 HYPERLINK l _Toc235970850 6.2.10施工机具 Construction Equipment and Tools PAGEREF _Toc235970850 h
37、35 HYPERLINK l _Toc235970851 6.2.11防台防汛 Typhoon and Flood Control PAGEREF _Toc235970851 h 38 HYPERLINK l _Toc235970852 6.2.12项目部安全检查制度 Project management safety inspection system PAGEREF _Toc235970852 h 40 HYPERLINK l _Toc235970853 6.3文明施工措施 Civilized construction measures PAGEREF _Toc235970853 h 42
38、 HYPERLINK l _Toc235970854 6.3.1场容场貌 Field appearance and image PAGEREF _Toc235970854 h 42 HYPERLINK l _Toc235970855 6.3.2材料堆放管理 Material laydown management PAGEREF _Toc235970855 h 43 HYPERLINK l _Toc235970856 6.3.3文明建设措施 Civilized construction measures PAGEREF _Toc235970856 h 44 HYPERLINK l _Toc235
39、970857 6.3.4强化工地卫生建设 Strengthening of field sanitation building PAGEREF _Toc235970857 h 45 HYPERLINK l _Toc235970858 6.3.5地下管线及周边防护措施 Underground pipeline and peripheral protection measures PAGEREF _Toc235970858 h 46 HYPERLINK l _Toc235970859 第7部分项目人员配备 PAGEREF _Toc235970859 h 1 HYPERLINK l _Toc2359
40、70860 7.1项目组织管理体系 Project organization management system PAGEREF _Toc235970860 h 1 HYPERLINK l _Toc235970861 7.2项目主要管理人员配备 Provision of Key Project Management Personnel PAGEREF _Toc235970861 h 1 HYPERLINK l _Toc235970862 7.3施工队伍的组建和劳动力的配备 Establishment of construction team and mobilization of labor
41、force PAGEREF _Toc235970862 h 8 HYPERLINK l _Toc235970863 7.3.1施工队伍组建 Establishment of construction team PAGEREF _Toc235970863 h 8 HYPERLINK l _Toc235970864 7.3.2劳动力人员动态分布图 Labor personnel dynamic distribution chart PAGEREF _Toc235970864 h 8 HYPERLINK l _Toc235970865 7.3.3劳动力配备 Provision of Labor Fo
42、rce PAGEREF _Toc235970865 h 9 HYPERLINK l _Toc235970866 第8部分LEED项目施工实施方案 PAGEREF _Toc235970866 h 1 HYPERLINK l _Toc235970867 8.1LEED项目施工实施方案 LEED Project Construction Execution Plan PAGEREF _Toc235970867 h 2 HYPERLINK l _Toc235970868 8.1.1节水 Water Conservation PAGEREF _Toc235970868 h 2 HYPERLINK l _
43、Toc235970869 8.1.2节能 Energy Saving PAGEREF _Toc235970869 h 3 HYPERLINK l _Toc235970870 8.1.3节材 Material Saving PAGEREF _Toc235970870 h 3 HYPERLINK l _Toc235970871 8.1.4使用绿色建材 Utilization of green building materials PAGEREF _Toc235970871 h 4 HYPERLINK l _Toc235970872 8.1.5垃圾管理 Rubbish and wastes cont
44、rol PAGEREF _Toc235970872 h 4 HYPERLINK l _Toc235970873 8.2节能型工地实施方案 Energy-saving Site Execution Plan PAGEREF _Toc235970873 h 7 HYPERLINK l _Toc235970874 8.2.1组织措施Organization Measures PAGEREF _Toc235970874 h 8 HYPERLINK l _Toc235970875 8.2.2技术措施 Technical Measures PAGEREF _Toc235970875 h 10第1部分 施工
45、组织设计总说明 第 PAGE 1页Section I General Description of Construction & Organization Design施工组织设计总说明Section IGeneral Description of Construction and Organization Design本章内容提要:Headlines of This Section:工程概况 Generals工程目标 Objectives施工大型机械设备 Large Equipment for Construction工程施工设想 Construction Consideration编制依据
46、 Reference工程概况 Generals项目情况 Condition工程名称:*风电临港500MW 叶片和机舱项目Project Name: * Lingang 500MW Blade and Nacelle Project建设单位:风力发电叶片*(上海)有限公司Building Company: * WIND POWER BLADE (SHANGHAI) Co. LTD.设计单位:Design Company:管理顾问:Administrative Consultant: 建设地点:上海*新城*园区*路以西、*路以南地块。Construction site: site locates
47、west to *Road and south to*Road, both roads are within * Zone of *, *District, Shanghai.工程规模:Project Scale项目占地总面积为34771.04m2,该工程总建筑面积约为40770.05m2本工程项目由1#、2#生产厂房、卫门喷漆间、垃圾间及自行车棚,室外道路及绿化工程等。The project has an area of 34771.04m2 in total and a building area of 40770.05m2. The project comprises the const
48、ructions of 1# and 2# production buildings, guardhouses, spraying shop, garbage house and bicycle shed, as well as outdoor roads and greening engineering.建筑结构概况 General of Building Structure项目名称Project Name建筑面积Building Area建筑层数及总高度No. of Building Level and Total Height结构类型Structure Type基础形式Foundatio
49、n Form1#生产厂房1#Production Building241081(局部partial 2,3)17.3钢结构钢筋砼框架Steel structureRC frame桩基承台基础Bearing platform for pile foundation2 号生产厂房Production area 2#15311.151(局部partial2 )14.3钢结构钢筋砼框架Steel structureRC frame桩基承台基础Bearing platform for pile foundation喷漆间及垃圾房Paint Shop &Garbage House1088.8019.3钢结
50、构框架混凝土Steel structureRC frame承台基础Bearing platform for pile foundation门卫1Guardhouse189.65 1 3.3钢筋砼框架RC Frame承台基础Bearing platform for pile foundation门卫2Guardhouse289.6513.8钢筋砼框架RC Frame承台基础Bearing platform for pile foundation自行车棚Bicycle Shed82.8012.7钢结构Steel Structure独立基础Single footing1号建筑:1号生产厂房 1# b
51、uilding: 1# production building1号生产厂房占地面积为18793.10。生产区为单层钢结构建筑,屋面为轻钢压型钢板屋面,内天沟,虹吸式排水,防水等级二级。其中机舱生产区包括大件装配区域和小件装配区域,层高17m,檐口高度17m,占地面积4917,建筑面积为4917,柱网尺寸为(6m24)(8m4);叶片生产区为完整大空间车间,层高15.2 m,檐口高度15.2 m,占地面积4908,建筑面积4908,柱网尺寸为(6m24)(8m4);原材料储藏区为单层钢结构,局部二层6m+6m,屋面为轻钢压型钢板屋面,内天沟,虹吸式排水,防水等级二级。其中收货区、技术室、装料间层
52、高6m,二层为管理办公区,层高6m,占地面积819,一层面积819,二层面积670,柱网尺寸为(6.6m3)(8m4);原材料储藏单层区域包括机舱仓库、叶片仓库和环氧仓库,层高为15.2 m,檐口高度15.2 m,占地4703,建筑面积4703,柱网尺寸为(6m24)(8m4)。1# production building has an area of 189793.10m2. The production area comprises single-storey building with steel structure, the roof uses light steel profiled
53、 sheet roof with siphon drainage internal gutter in a Grade II Waterproof. Its nacelle production area includes both assembly shops of big and small parts, of which the floor height is 15.2m, cornice height is 17m, the area is 4917m2, construction area is 4917m2 and net post size is (6m*24)*(8m*4).
54、The blade production area is a workshop with integral bulk space, of which the floor height is 15.2m, the cornice height is 15.2m, the area is 4908m2, the construction area is 4908m2 and the net post size is (6m*24)*(8m*4). The roof of raw material storage area is single-storey structure and its par
55、tial 6m+6m roof in the second floor uses light steel profiled sheet roof with siphon drainage internal gutter in a Grade II Waterproof level. The floor height of receiving area, technical room and charging room is 6m, the second floor is used as office area with 6m floor height, the whole building h
56、as an area of 819m2 in total including 819m2 for the first floor and 670m2 for the second, as well as (6.6m*3)*(8m*4) net post size.2号建筑:2号生产厂房 2# building: 2# production building2号生产厂房占地面积为14635.64,建筑面积为15311.15。其中机舱生产区和叶片生产区为钢结构,屋面为轻钢压型钢板屋面,虹吸式排水,外排水,层高13.5 m,占地面积为12669,建筑面积为12669,柱网尺寸为(6m61)(8m4)
57、,机舱生产区檐口高度14 m,叶片生产区檐口高度14 m。 2# production building has an area of 14635.64m2 and construction area of 15311.15m2. Its nacelle production area and blade production area comprise steel structure and their roof use light steel profiled sheet roofs with external siphon drainage, including 13.5m roof h
58、eight, 12669m2 roof area, 12669m2 construction area and (6m*61)*(8m*4) net post size, as well as 14m cornice height in both nacelle and blade production areas.3号建筑:喷漆间及垃圾房 3# building: spraying room and garbage house喷漆间及垃圾房占地面积1023.80,建筑面积1088.80,屋面为轻钢压型钢板屋面,内天沟,外排水。喷漆间为单层钢结构建筑,层高9 m,占地面积为700,建筑面积为7
59、00,柱网尺寸为(8m4)21m;管理用房、垃圾房和化学品库为单层钢结构建筑,层高为6 m,占地面积为323,建筑面积为323,柱网尺寸为(6m8)6m。 Spraying room and garage house have a floor area of 1023.80m2 and construction area of 1088.80m2, their roofs use light steel profiled sheet roofs with internal gutter but external drainage. The spraying room comprises sin
60、gle-storey structure, including 9m floor height, 700m2 floor area, 700m2 construction area and (8m*4)*21m net post size. Management room, garbage house and chemical storage comprises single-storey structure, including 6m floor height, 323m2 floor area, 323m2 construction area and (6m*8)*6m net post
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 糕点装饰与艺术考核试卷
- 可燃冰开采对海洋沉积环境的影响考核试卷
- 晚期肝癌病人护理查房
- 2025汽车销售售后服务合同范本
- 2025年建筑工程监理合同模板
- C语言程序设计基础
- 幼儿园上下学安全教育
- 2025玉米购买合同范本
- 2025国内代理合同范本
- 2024-2025粤教粤科版科学一年级下册期中考试试卷附答案
- 提高四级手术术前多学科讨论完成率实施方案
- 中国食物成分表2018年(标准版)第6版
- GB/T 19363.2-2006翻译服务规范第2部分:口译
- GB/T 11865-2008船用离心通风机
- GA/T 652-2006公安交通管理外场设备基础施工通用要求
- 高考语文一轮复习:作文素材《长津湖》 课件(53张PPT)
- 《课程与教学论》形考二答案
- 公积金提取单身声明
- 高处作业吊篮进场验收表
- 护理管理学练习题题库
- 8.生发项目ppt课件(66页PPT)
评论
0/150
提交评论