讲义教程说明200_第1页
讲义教程说明200_第2页
讲义教程说明200_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Airlines Limited03110-01航空Airlines MEDAirlines LimitedWO NO/工作指令号SEQ NO/序列号WOHA333548_51_85培训方式354885通用类/GenericTitleGeneral Visual Inspection of Nose Landing Gear (EWIS)Mcd&Rev/厂家工卡&修订日期标题整体目视检查前起落架(EWIS)AMM 05-27-10-200-8042012-10-01A/C/飞机号Subtask No/工JC Rev/工卡版本号Workarea/工作区域Skill/工种Man Hour/工时BL

2、NOAT-052710-200-804HR001001机身/AirframeAIRP00:20MP Item/MP 号Baseline/依据MP REV/ MP 版本号Sion/维修站Threshold/首检erval/重复检HA33-ZL-711-01- 1MPDZL-711-01-1,MRB32.30.00/13,MRBZL-711-01-1Ie 2 Revi6HAK1 A1 AAcs Panels/接近盖板Zones/区域Written/编写Approved/批准713 7147112012-11-262012-12-19TOOLS/工具TOOLS NESARY/必须工具ITEM项目P/

3、N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注198F32204001001COLLAR, SAFETY - DOOR, NLGTO2ALL(必需/Nesary)TOOLS IF NESARY/视情工具ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注PARTS AND MATERIAL/航材NOTE:OPERATOR MUST GET AND INSTALL THE PARTST CORRESPOND TO THE RELATIVE WORKORDE

4、R NO.注释: 请工作者严格按照工作指令号领取预定的航材装机PARTS AND MATERIAL NESARY/必须航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注PARTS AND MATERIALIF NESARY/视情航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注IMPORTANT NOTE:he event of any discrepancies betn the Chiinstruction and the En

5、glish instruction, the English procedure should prevail.Record Additional Work/Findings(If Applicable) Reference No.of Release to Service(* Tick as appropriate# Different crews should perform the work on each of the systems)Certifiest the work specified, except as otherwise specified, was carried ou

6、t in accordance with HKAR-145 and in respect tot work, The aircraft / aircraft components are considered ready for Release to Service.HKA Approval No: AI / 135 / 706 * HKE Approval No: AI /218/1215, JMM 133 * HNAT Approval No.: D.101115, JMM 047*CASL Approval No: AI / 101 / 798 * AMECO Approval No.:

7、 D.101131, JMM 001* HNAT- North West Approval No.: D.500023, JMM 049 *HAECO Approval No: DAI / 1 / 853 * SMECO Approval No.: D.400009, JMM 081* HNAT- YN Approval No.: D.4108, JMM 134 *TAECO Approval No.: DAI / 89 / 1295 * CEA Approval No.: D.200002, JMM 112 * HNAT Approval No.: D.3039, JMM 076 *ECO

8、Approval No.: D 101661, JMM 124 * CEA-Jiangsu Approval No.: D.200047, JMM 117 * SPRING Approval No.: D.200081, JMM 121 *SIAEC Approval No: AWI / 01 * STARCO Approval No.: D.200078, JMM 039* GAMECO Approval No.: D.300001, JMM 006*I Approval No.: AI / 147 / 0910 * Other: *Signature:Authorization No.:D

9、ate:*检查/Inspect 切片开始* General Visual Inspection of Nose Landing Gear (EWIS)整体目视检查前起落架(EWIS)1 .Job Set-up /开始工作TA. Get Acs /接近(1) Put an ACS PLATFORM 2M (6 FT) inition at the NLG main doors 713 and 714.起落架主门 713 和 714 放置接近工作台在位。(2) Open the nose landing-gear main-doors 713, 714 (Ref. TASK 32-22-00-01

10、0-801).打开前起落架主门 713,714(参考TASK 32-22-00-010-801)。 2 .Procedure /步骤A. Inspection /检查(1) Do a general visual inspection of the nose landing-gear (zone 711).整体目视检查前起落架(区域 711)T(2) Make suret:- There is no damage (corro, leaks or cracks) on all the parts ofthe components and the structure you can see.Al

11、l the installations (wiring) are attached correctly.确认:所有能看到的部件和结构均无损伤(腐蚀,渗漏或裂纹)。确认所有安装(线路)正确。3 .Close-up /收尾TA. Close Acs /关闭接近(1) Close the nose landing-gear main-doors. (Ref. TASK 32-22-00-410-801).关闭前起落架门(参考TASK 32-22-00-410-801)。B. Put the Aircraft back to its Initial Configuration恢复飞机到正常状态(1) Remove all the fixtures, tools, test and support equipment used during this procedure.撤掉所使用过的工具设备。(2) Make suret the work area is clean and

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论