挂篮施工方案(纯英文32页)_第1页
挂篮施工方案(纯英文32页)_第2页
挂篮施工方案(纯英文32页)_第3页
挂篮施工方案(纯英文32页)_第4页
挂篮施工方案(纯英文32页)_第5页
已阅读5页,还剩27页未读, 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Our main products.Formtravellers Overhead and Underslung FTs for cast in-situ concrete bridges.Movable Scaffolding System (MSS) For cast in-situ concrete bridges - overhead or underslung MSS. Launching Gantries (LG) For precast segmental construction overhead or underslung LGs.Bridge Repair / Mainte

2、nance Equipment for repair & maintenance of concrete or steel bridges.MOVABLE SCAFFOLDING SYSTEMMain Products ApplicationsMSS - Moving Scaffolding SystemSpan length 25 - 80 mUsual Total Length 400m several kms Usual cycle time / span6 10 daysLG - Launching GantriesSpan length: 25 100+mUsual Length:

3、Minimum 500 - 800 segments Usual cycle time / span1-3 days / spanLAUNCHING GANTRYMain Products ApplicationsFORMTRAVELLERMain Products ApplicationsFT - FormtravellerSpan length: 40 300+ mUsual cycle time:2 x 1 segment / week The formtraveller system was invented in 1970 and today it is acclaimed for

4、enhancing the cost-effectiveness of bridge projects world-wide. We have continually improved the Formtraveller in collaboration with major contractors. The system is lightweight, versatile and easy to assemble and operate. Rolling forward on rails, the system can be reset quickly and easily.Where to

5、 use the FormtravellerThe Formtraveller is used for free cantilever construction of post-tensioned boxgirder and cable-stayed concrete bridges. Engineered to international standards, the system provides an exceptionally rigid formwork, with a maximum deflection of less than 25 mm at full loading. TH

6、E FORMTRAVELLER CONCEPTThe FormtravellerThe Standard Formtraveller is designed for a usual segment length of 5 m and load capacities (concrete and formwork) varying from 100 tons to 600 tons. The steel weight depends on the cross-section of the bridge in question, but will normally vary from about 2

7、5 tons to 110 tons correspondingly. The Standard Formtraveller may be adapted to suite almost any cross-section, and is easily adjustable during operation to variations in segment length (up to 5 m), section height, web thickness, and deck width. For segment lengths beyond 5 m and other conditions,

8、the Formtraveller will be tailor-made.The Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as

9、 3 m. The procedure is illustrated through the these 4 phases:3 mPhase 1:Assembly at pierhead as small as 3 mPhase 2:Concreting of 1st segment on each side of the pier finishedThe Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembl

10、y of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Phase 3:Splitting of travellersThe Formtraveller - Cross-Support for installation on small Pierheads

11、When the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Phase 3:Splitting of travellersThe Formtravel

12、ler - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these

13、 4 phases.Phase 4:12,2 m concreted (standard formtraveller); ready for normal procedureThe Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembly of the Formtraveller, our patented Cross-support solves the problem. It makes it possib

14、le to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Phase 4:12,2 m concreted (standard formtraveller); ready for normal procedureThe Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to

15、 allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Phase 4:12,2 m concreted (standard formtraveller); ready for normal procedureTh

16、e Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembly of the Formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated throu

17、gh the these 4 phases.Phase 4:12,2 m concreted (standard formtraveller); ready for normal procedureThe Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small to allow normal assembly of the formtraveller, our Cross-support solves the problem. It makes it pos

18、sible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Phase 4:12,2 m concreted (standard formtraveller); ready for normal procedureThe Formtraveller - Cross-Support for installation on small PierheadsWhen the pier head is too small

19、 to allow normal assembly of the formtraveller, our Cross-support solves the problem. It makes it possible to start free cantilevering from pier heads as small as 3 m. The procedure is illustrated through the these 4 phases.Lightweight:The use of rectangular hollow sections in the main structural co

20、mponents and recoverable high strength bars in all stays and ties reduces the total steel weight to a minimum. Flexible design:The Formtraveller may be adapted to almost any cross-section and is easily adjustable during operation to variations in segment length, box height, web thickness, deck width

21、 and road alignment (gradient, curvature, super-elevations). Small deflections:The vertical deflection at the front of the Formtraveller is less than 25 mm at maximum load. Formwork beams are designed for a maximum deflection of L/400 of their length. Easy assembly:One Formtraveller may be assembled

22、 in one week. Rolling forward on rails, the reset time is short. THE FORMTRAVELLER FEATURESThe Formtraveller:ComponentsMAINRAILSHYDRAULICCYLINDERSThe Formtraveller - ComponentsPULL DOWN CYLINDERSLAUNCHING CYLINDERSMAIN CYLINDERSFRONT & REARBOOGIESMAINRAILSHYDRAULICCYLINDERSThe Formtraveller - Compon

23、entsFRONT & REARBOOGIESMAINRAILSHYDRAULICCYLINDERSMAINFRAMEWORKThe Formtraveller - ComponentsstrukturasFRONT & REARBOOGIESMAINRAILSHYDRAULICCYLINDERSMAINFRAMEWORKFRONT & REARFRAMEWORKBOTTOMFRAMEWORKCROSSARMSINTERNALFRAMEWORKThe Formtraveller - ComponentsstrukturasFRONT & REARBOOGIESMAINRAILSHYDRAULI

24、CCYLINDERSMAINFRAMEWORKFRONT & REARFRAMEWORKBOTTOMFRAMEWORKCROSSARMSINTERNALFRAMEWORKEXTERNALFORMWORKBOTTOMFORMWORKINTERNALFORMWORKThe Formtraveller - ComponentsstrukturasFRONT & REARBOOGIESMAINRAILSHYDRAULICCYLINDERSMAINFRAMEWORKFRONT & REARFRAMEWORKBOTTOMFRAMEWORKCROSSARMSENDFORMWORKWORKINGPLATFORMSThe Formtraveller - ComponentsINTERNALFRAMEWORKEXTERNALFORMWORKBOTTOMFORMWORKINTERNALFORMWORKstrukturasThe FormtravellerThe Formtraveller - A normal working cycle may be as follows:The Formtraveller, except for the internal formwork, is launched into posi

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论