面向负荷的生产控制与JIT_第1页
面向负荷的生产控制与JIT_第2页
面向负荷的生产控制与JIT_第3页
面向负荷的生产控制与JIT_第4页
面向负荷的生产控制与JIT_第5页
已阅读5页,还剩15页未读 继续免费阅读

付费下载

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Load-oriented manufacturing control just-in-time production for job shopsProduction Planning & Control1994 Vol.5. Wolfgang BechteHannover consultant firm1998/08/18 IntroductionA technique for job shops supporting the JIT concept - Using load-oriented order release, entry (Bechte, Kettner 1980)- Manu

2、facturing control system is designed by Krautzig.- Implemented in many factories (Wiendahl, Bechte 19871991)Basic principles & technique for Load-oriented manufacturing control Detailed computational procedure refer to more theoretical publication written by Wiendahl(1993), Bechte(1988)content1. Obj

3、ectives of load-oriented manufacturing control2.Structure of load-oriented manufacturing control3. Basic concept in load-oriented manufacturing control4.Overview of a load-oriented manufacturing control system5.Example of the control system1. Objectives of load-oriented manufacturing controlReducing

4、 lead-time and WIP .Keeping actual lead-time on stable lowest possible level. - Permanently In/Out put, inventory and average lead time of W/C are monitored and compared with their planned values in dynamic wayAt the same time determine Bottlenecks, short & mid-term capacity planningFurnishing reali

5、stic due-date scheduling and capacity planning2. Structure of load-oriented manufacturing controlFlow of orders for one single machineIllustrating events, a hierarchical controller levels, sectionsFigure 1.Funnel model of job shopMulti-level closed-loop control systemHigher controller level depends

6、on theperformance of the lower one.CompanyDISPOSITIONJob ShopMachineSalesDue DateLead timeUtilizationMfg.AssemblyReceivingShippingSupplierCustomerDisturbancesProd ScheduleLong Term CapacitiesOrder EntryMid termCapacitiesOrder releaseShort termCapacitiesOperation SequencesCapacities LoadingFigure2. M

7、ultilevel closed-loop control system.3. Basic concept in load-oriented manufacturing control3.1 Basic relationship at a Work centerFour simple rules for regulating Input, Output, Inventory and Lead time1) constant inventory - keep In/Output the same on a avg.2) changing inventory - change input3) Av

8、erage lead time - adjust In/Out ratio4) Individual lead time to be even - apply FIFO rule while dispatchingAvg.lead time = Avg. Inv. Avg. OutputQueuing ordersAvg. OutputAvg. InputAvg. InventoryInputInitialInventoryAvg. Lead timeAvg.InventoryOutput curveInput curveOutputFinal InventoryControl PeriodL

9、oadHoursTimedaysCompleted OrdersArriving OrdersFigure 3. Basic relationship and throughput diagramBasic relationship at work center to plan the Input, Output, Inventory and Lead timeload limit = Planned output* (Planned lead time + Planning period) Planning period3. Basic concept in load-oriented ma

10、nufacturing control3.2 Principle of Load limiting and Load conversionAdding LoadRemainingLoadLoadlimitPlannedInputActualInventoryPlannedlead timeCase Acase BTodayPlanning PeriodPlanned Inv.(Buffer)Plannedoutput(capacity)Figure4. Load limiting.In case that exceeding loads happensLoad limiting reject

11、or prefer orders or variesRequired capacity = present load * planning periodplanned lead time + planning periodRejectedLoadAllowedloadLoadlimitExceeding loadPresent LoadPlannedlead timeRequiredBufferRequiredcapacityFigure5. Short-term capacity planning using the load limitRequired Input CurveRequire

12、doutput curve.Order release should consider the work center loads and capacitiesFour type of loads In case of B,D a statistical estimation is needed ; Load conversion factordepreciation factor =planned output / Load limit =planning periodplanned lead time + planning periodLimiting and balance work i

13、n process by order release.Planned Inv. (I)(D)LoadlimitPlannedlead timeTodayPlanned Inv.(Buffer)Plannedoutput(capacity)(D)Planned Release(I)Ideal Released CurveFull loadConverted LoadFigure6. Derivation of conversion using the load limitA considering the available capacities of a short-term planning

14、 periods(12Week)Planned orders were scheduled backwardSelects periodically those of the planned ordersStep1. Establish urgent ordersStep2. Release wotrkable ordersTime limit3. Basic concept in load-oriented manufacturing control3.3 Technique of load-oriented order release.If capacities is needed Loa

15、d-oriented release require appreciate decisioncbaacabbacPlanning periodTime limittodayTimeDaysDueOver dueFutureNon-UrgentOrder 4312WorkableWorkableUnworkableOmissibleABCWork centersLoadHoursLoad limitReleasedLoadRemainingLoadFigure 7. Steps of Load-oriented order release3. Basic concept in load-orie

16、nted manufacturing control3.4 Technique of load-oriented order entryThe ideas of Load-oriented order entry is to avoid overloaded weeksChecks the scheduled operation dates against available capacities for a midterm planning horizon (ex 12 weeks)Realistic due dates are offered and the expected bottle

17、necks are indicated. Initiation capacity changes in advance if possibleOverload weeks Free date.Cumulative LoadCumulative CapacityBacklogOverload WeeksUnderloadweeksPlanning horizonTodayTime weekFree DateOverloadPortion83%TotalLoad100%LoadhourFigure 8. Cumulative load and capacity of a work center.C

18、 is a critical work centerABCDEABCDEOverload WeeksTodayTime weekWorkcenterABCDEFree DateOrder Lead TimeOperation Lead TimeRealistic Release DateRealistic Delivery DatePlanning HorizonFigure 9. Establishing a realistic delivery date of an order4.Overview of a load-oriented manufacturing control syste

19、m1. Routing data2. Order data3. Item data4. Shop calendar5. Capacity data6. Transaction data7. Control data: detailed tables for w/c and free definable group.ShopCalendarCapacityDataPlanningDataTransactionDataItemDataOrderDataRouteingDataPROGRAMTransactionDataPROGRAMControlDataPROGRAMShopCalendarPro

20、gramGraphsReportsPROGRAMOperationSequencingPROGRAMOrderReleasePROGRAMOrderEntryDIALOGCapacitiesDIALOGOperationCompleteDIALOGOrderReleaseDIALOGOrderEntryCapacitiesEntriesCapacitiesReleaseCapacitiesSequencesGraphsReportsControlDataCONTROL SYSTEM(PC)BASIC SYSTEM(HOST)PLANNING SYSTEM(PC)Figure 10. Load-

21、oriented manufacturing control system showing the data flow5.Example of the control system1. The method of basic throughput diagrams is extended(Figure 1 with diagrams)2. Operation Throughput Element3. Planned and actual average lead time are computed for each inventory as well as average due-date d

22、ev. For release,input, output and deliveryEntryReleaseInputOutputDeliveryDispositionIndirectDirectDownstreamUpstreamOpenCycleTotal lead timeWait after operationTransportWait before operationSetupRunInteroperation timeProcess timeDirect Load time.4. Pump-building factory characteristics products 9000 pumps Manufactured parts 26000 different itemsManpower(Job shop) 180 persons Work centers 130

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论