1、Make-to-Stock Production Discrete IndustrySAP Best PracticesPurpose, Benefits, and Key Process StepsPurpose This scenario describes a business process, which is typical for companies with lot-size oriented production. The production scenario produces a finished good and all dependent components in m
2、ake-to-stock production (MTS). Furthermore, the scenario is supported by the main cost object controlling functions required, such as preliminary costing and period-end closing.Benefits Production triggered by a production planSerial number and batch management includedOptional with: quality managem
3、ent, consigned inventory, external processingKey Process StepsCreating Planned Independent RequirementsMaterial Requirements Planning at Plant LevelIn-House Production (subassembly)In-House final assembly (Finished Good)Capacity Leveling Confirming Assembly ActivitiesRequired SAP Applications and Co
4、mpany RolesRequired SAP ApplicationsSAP enhancement package 5 for SAP ERP 6.0Company RolesProduction PlannerManufacturingWarehouse ClerkPlant ControllerBuyerStrategic PlannerDetailed Process DescriptionMake-to-Stock Production Discrete IndustryThis scenario describes a business process, which is typ
5、ical for companies with lot size oriented production. The production scenarios consist of both goods movements (goods issues and receipts) and confirmation of completion of the production order. Furthermore, the scenario is supported by the main cost object controlling functions required, such as pr
6、eliminary costing and period-end closing.The typical planning process starts with sales quantity planning. The previous periods actual sales figures can be used as a basis for future planning. In Sales and Operations Planning, you ensure that production stays in line with sales so that you may creat
7、e the production plan synchronously to sales. The planning data is transferred from Sales and Operations Planning to Demand Management. Demand Management generates independent requirements, which are used in the subsequent Material Requirements Planning (MRP) run. In material requirements planning,
8、the bill of materials (BOM) for the top-level material demand gets exploded and production is planned right down to procured component level. MRP results in planned orders being generated for the material to be produced. If insufficient warehouse stock is available, purchase requisitions are created
9、 for the raw materials required. When the order is created, target costs are calculated for the order lot size (preliminary costing). During the production process, costs incurred are updated on the order, which enables you to keep track of and compare target costs and actual costs at any time.Perio
10、d-end-closing activities are applied to the order. This includes Work In Progress calculation and variance calculation. After this, Work in Progress is settled to financial accounting and production variances are settled to management and financial accounting.Process Flow DiagramMake-to-Stock Produc
11、tion Discrete IndustryManufacturingEventPlant ControllerPeriod End Closing “General” Plant(181)Material Requirements Planning at Plant Level & Evaluation of Stock / Requirement ListBeginning of Planning CyclePurchase RequisitionMRP ListInventory Standard. CostProduction PlannerPeriodic Plan Revision
12、Release Production OrderCapacity LevelingMaterial Staging for Planned OrdersConfirming Assembly Activities/ Final ConfirmationSemi-Finished Goods ReceiptGoods Issue/ Back flushUpdate CapacityGoods Receipt SlipPick ListOrder PrintPlanned OrdersCapacity Leveling O.k.?Material Available?BuyerWare-house
13、 ClerkGoods Receipt SlipProcurement of Stock Material with QM (127)Procurement & Consumption of Cosigned Inventory (139)Strategic PlannerCreating Planned Independent RequirementsConvertPlanned Order to Production OrderInventory Consumption Standard. CostProcurement w/o QM(130)Finished Goods ReceiptM
14、M Subcontracting (138)PP-Subcontracting (External Processing)(150)NoYesNoYesLogistics Planning (144)LegendSymbolDescriptionUsage CommentsTo next / From last Diagram: Leads to the next / previous page of the DiagramFlow chart continues on the next / previous pageHardcopy / Document: Identifies a prin
15、ted document, report, or form Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow linesFinancial Actuals: Indicates a financial posting document Does not correspond to a task step in a docume
16、nt; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow linesBudget Planning: Indicates a budget planning document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this sha
17、pe does not have any outgoing flow linesManual Process: Covers a task that is manually done Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow. Existi
18、ng Version / Data: This block covers data that feeds in from an external process Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any ing flow lines System Pass / Fail Decision: This block covers an
19、automatic decision made by the software Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed. External to SAPBusiness Activity / EventUnit ProcessProcess ReferenceSub-Process Refere
20、nceProcess DecisionDiagram ConnectionHardcopy / DocumentFinancial ActualsBudget PlanningManual ProcessExisting Version / DataSystem Pass/Fail DecisionSymbolDescriptionUsage CommentsBand: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an or
21、ganization unit or group, rather than a specific role.The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.Role band contains tasks common to that role.External Events: Contains events that start or end the scena
22、rio, or influence the course of events in the scenario.Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the
23、 process flow.Connects two tasks in a scenario process or a non-step eventBusiness Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenarioDoes not correspond to a task step in the document Unit Process: Identifies a
24、 task that is covered in a step-by-step manner in the scenarioCorresponds to a task step in the document Process Reference: If the scenario references another scenario in total, put the scenario number and name here.Corresponds to a task step in the document Sub-Process Reference: If the scenario re
25、ferences another scenario in part, put the scenario number, name, and the step numbers from that scenario hereCorresponds to a task step in the document Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emergi
26、ng from different parts of the diamond. Does not usually correspond to a task step in the document; Reflects a choice to be made after step executionConvertPlanned OrderDependent ReqmtsReservationsWarehouseMaterial ReqmtsPlanningMaterials Requirement Planning - MRPPlanned Ind. RequirementsProduction
27、OrderAlternative Planning Strategies for Finished ProductStrategy Net Requirements Planning (10)Planning with Final Assembly (40) Customer requirements passed on to production NoYesThis means . . . . sales orders do not influence production . sales orders that exceed planned independent requirements
28、 can influence production . the main objective is to ensure smooth production . the most important factor here is the ability to react flexibly to customer demand Planned independent requirements allocated and reduced during sales order processing NoYesPlanned independent requirements reduced at goo
29、ds issue for delivery YesNoWork CenterWork Center: AssemblyRoutingsCostingScheduling& Capacity 1010,-2150,-3160,-Default valuesRoutingsCosting DataSched. DataCapacity DataRouting Work Center / OperationRouting HeaderOperation 10: Final AssemblyMaterial ComponentsWork centerControl keyStandard values
30、Activity typesDescriptionIndividual ConversionIndividual ConversionPlannedordersProductionordersCollective ConversionCollective ConversionPlanned Order ConversionProductionorderPlannedordersSpecify order typeDefine order itemCopy routingLead time schedulingCopy bill of materialOptional changesSave p
31、roduction orderFridayJanuary25 2008TuesdayJuly15 2008Requirements planningManuallyAvailability checkAutomaticallyOptional (Customizing)Production Order CreationOrder proposal (planned order) Order creation Availability checkOrder release and batch determination for components Order settlement Order
32、headerOperationsComponentsCosts2050100Material withdrawal Goods receipt Production Order ProcessingProduction Order Confirmations MaterialGoods movementMaterial documentAccountingdocumentWarehouse OperationMat. comp.Prod. orderCostsUpdate of stock quantitiesUpdate of stock valuesmaterials can be bat
33、ch controlledGoods MovementGoods issue postingMaterialdocumentAcctg.documentGoods IssueUpdating stock quantitiesUpdating stock valuesReducing reservationsCalculating actual costs and up-dating the order Order confirmation.Manual entryProduction Order ConfirmationsProductionorderOperation 0010Operati
34、on 0020Operation 0030Operation . . . .lCosting variantDisplay planned/actual costs lCost elementslCost itemizationlCost component splitPlanned costsPlanned costsMaterial costsCosts for externalprocurementProduction costsMaterial overheadcostsProduction overheadcostsCosts for externalprocessingCost elementsCost elements:PhasesPhaseslGen. operation valueslStandard valueslControl key “costing indicator”ResourcesResourceslFormula key forcostinglCost centerlActivit
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年日喀则地区日喀则市工会人员招聘笔试参考试题及答案详解
- 2026年十堰市茅箭区工会人员招聘笔试备考题库及答案详解
- 2026年枣庄市台儿庄区工会人员招聘笔试备考试题及答案详解
- 2026年塔城地区塔城市中小学教师招聘考试模拟试题及答案详解
- 2026年电梯考试题库及答案详解
- 2025年铜仁地区万山特区街道办人员招聘考试试题及答案详解
- 成都市中西医结合医院 2026年第二批医疗卫生辅助岗位招募(21人)考试备考题库及答案详解
- 2026年渣打银行社会招聘笔试备考题库及答案详解
- 2026上海大学附属嘉定实验学校编外人员招聘8人考试模拟试题及答案详解
- 2026福建福州鼓楼区鼓东街道招聘社区工作人员2人考试模拟试题及答案详解
- 《内河电子航道图工程技术标准》
- 2025年中级香道师考试题库及答案详解
- 2022民用建筑暖通空调设计技术措施
- 【英语】江苏省苏锡常镇2025届高三下学期二模试题(解析版)
- 2025四川成都新都投资集团有限公司招聘23人笔试参考题库附带答案详解(10套)
- 病房改造及能力提升项目建设方案
- 2025新高考数学核心母题400道(教师版)
- 第六届全国农业行业职业技能大赛(农业经理人赛项)理论参考试题库-下(多选、判断题)
- DB45T 2871-2024 既有住宅加装电梯安全技术规范
- 《电力建设工程施工安全管理导则》(NB∕T 10096-2018)
- 字母认主协议书(2篇)
评论
0/150
提交评论