1、ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)Amendment Records修改。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.版Ver修改主 内容tents生效日期 Effective DateA首次发Release2014.04.01第安装管理政策Third-Party Installationroject Management PolicyTKEC-

2、R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page2 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)1.目的 Pure本政策旨在:Thi Policy aims at:1.1 为第安装新梯 目业务的 展提供管 依据和指 原则;Provide management basis and guiding principles for the operation of third-party NI project;1.2 提高第安装质全绩 ,客 满意度,品牌价值。Improve the quality

3、 and safety performance of third-part installation, so as to enhance thecustomers satisfaction and to maain brand value.2.适 范围 Scope2.1克虏伯电梯中国区域运营辖下所有区域内的所有第遵循本政策的规定。安装新梯项目业务都必须ALL the third-party NI projects belonging to ALL the regions of ThyssenKrupp Elevator ChinaField Operations must follow the

4、 provis in this Policy.3.定义 Definitions3.1 第安装新梯项目 Third-par y NI project凡非 TKEC 与新梯买方(包括业主、最终户或其授 代表)签 安装合同 项目均视安装项目”)。igned between TKEC and new elevator buyers安装 目(以下 称“第为第The project, if its installationract is not(including owners, end users or their authorized represenive), is d emed as third-

5、party NIproject (hereinafter re erred to as “Third-Party Installation Project”).3.2 本政策引用的 TKEC,指和/或其分公司。电梯TKEC under this polic refers to Thyssen Elevators Compa y Limited and/or its branches.4.规则 Rules4.1原则与流程 Approval principles and proses所有第安装项目在签订协 前须根据 TKEC-R-02-01 合同签署政 新梯业务销售及采购合 之规定 过,时须提 文

6、件包括:All third-party installation projects must get approval according to the provis of beforesigning agreements, nd the documents for a proval include:。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.第安装管理政策Third-Party In

7、stallationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page3 / 12ThyssenKrupp Elevator (Chi克虏伯电梯(中国)a)拟签订之设备购Equipment supply signed;合同()及设备调试合同;tract (if any) and commisintract which are planned to be拟签订之TKEC-F-05-105 项目安装委 协议; which is planned to安装部对 项目TKEC-F-0

8、5-105 项目安装委托协议相关估文件,如TKEC-F-05-049 分承包方资料及资格评审表格 如在分包 指定流程 已状态为“active”则无需提交)和联合体声明文件(如有);Appraisal documents prepared by branch Installation epartment to evaluate the且tractparty of , such as the (no need o submit ifthe subtractor has been registered in subtractor appoment workflow with susas “activ

9、e”) and the完整填写的POAsortiuagreemen (if any);表(有效版本)是第三 安装项目对外绑定报 方案的核心文件之一;Completed (valid ver) i one of the core approval documents for thebinding offer scheme of third-party installation projects;对 TKEC 具有法律约束力的其它文件( 联合体文件等)。Others hall be legally binding upon TKEC (such assortium agreement).跨区第安装

10、项目须按TKEC-R-02-02 常规跨分公司新梯业务管理规定执行。Cross-branch third- arty installation projects shall refer to .4.2细则 Detailed Regulations4.2.1 调试合同 Co misingtract4.2.1.1 任何第安装项目应单独签订设备调试合同,合同 应按法律 定及公司政策明确双方在设备调试、工程管理试费用。质量控制方面的责任 并约定调For each third-party nstallation project, an i dividual equipment co mising tra

11、ct should be signed, whi h should specify the responsibilities of eitherparty on equipment commissio ing, projec management, safety and quality。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.第安装管理政策Third-Party Installati

12、onroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page4 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)trol according to relevant policies of the nation and our company, and alsoclarify th commissioning fee.4.2.1.2 调试合 的签约相对方必须具备相应的安装资质,或与具备资质的安装公司形成联合体。tract al party of

13、 the com ising contract musve correspondinginstallati n qualifications, or it must form acompany with such qualification.sortium win installation4.2.1.3 调试合同中必须明确实际安装方,如在签 阶段尚未能明确实际安装方,则需在调试合同中约定候选安装分包商时符合 .2.2 之管 要求。并经总部安装部评审通过,且需同The actual installation party shou d be specifiedhe commisingtract.

14、Ifthe actual installation party co ld not befirmed in signing s age, then,installati n subtractor candi ates shoulbetained in co misingtract and get approval from Head Office Installation Department o TKE ChinaField. The sub4.2.2.trctor should also meet the management requirements of安全及质量保证金 Safet为确

15、保设备安全and Quality Deit装质量,须在设备调试合同中做如下约定:To ensure equipment safety and installation quality of projects, co misingtract shouldtahe stipulations as below:。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.安装方Installation par

16、ty全及质量保证金要求Requirem nts of safet and quality deit 、级安装分包商Lev l-I, Level-IIinst llation subcontractor如因发生事故或存在 装质量问题对 TKEC 造成损失的,TKEC 应从该分包商其它 承接 TKEC 项目工程款中抵偿相应的损失金额。If any losses incurred to TKEC due to accident or installation quality problems, TKEC should have the right to deduct the loss amount

17、fromother TKEC project funds.其首次合作,需收取 5,000 元/台保证金,第安装管理政策Third-Party Installationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page5 / 12ThyssenKrupp Elevator (Chi克虏伯电梯(中国)a)4.2.2.2 调试合同中应有明确条款,确保在保证金无法抵偿 TKEC 损失时,TKEC 具有追索的权利,包括从其它项目 TKEC 应付账款中直接抵扣相关金额。There sh

18、ould be specified clausehe commising contract to e sure TKEChave the right to cl im for compensations when guarantee amount could notcompensate TKECslosses, including deducting relevant amount fromoutstanding payments by TKEC under othrojects.4.2.2.3 级、 级安装分 商指符合 TKEC-R-05-01 安装分包管理政策,且根据TKEC-B-05-0

19、2 分包商选择和评估流程评定合格并备案之安装分包商。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.Oth rsFor the first-time coop ration, cha ge 5,000 RMB as deposit for a unit.非首次合作,且之前 成项目质量得分80,无安全事故,则收取3,000 元/台保证金,For sed-time or further coop

20、eration, if the quality score o previous project is no lessn 80, and no serious safety accidend happened, then charge no lessn 3,000 RMB as deit for a unit,若未移交 TKEC 进行维保之第三方安装项目累积保证金额达到 300,000 元(每 100 台),则就 100 台以内之后续梯台无需再缴纳保证金。For any third-party installation projects whichre not transferred toTK

21、EC for ma enance, if the accu ulative de it amoun of those projects reaches 300,000 RMB (per 100 units), only 300,000 RMB should be charged for such 100 units.保证金可接受保函的 式。Deit can be paid in a form of letter of guaran ee.保证金可在相关梯台 货前收取,并在移交维保后无息归还,归还额度按 4.3 激励、违 责任和赔偿执行。Deit could be charged beforde

22、livery and beerest-free returned af er hand over to service department. Amount standard according to 4.3 rewarding, default responsibility and compensation.总部对单个项目 整保证金额度要求。TKE China Filed Head Office is entitled to change dep sit creditrequiremen for a project.第安装管理政策Third-Party Installationroject

23、Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page6 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)Level-Ind Level-II installation subtractors meanthose who meet ther Management Policy,requirements of TK C-R-05-01 nstallation Subtractand hav passed assessment refer to and be

24、put on records.ubtractor Selecting4.2.3 TKEC-F-05-105 项目安装委托协议signment Agreement在调试合同签约后并在项目开工前,委托协议的签署,并满足如下要求:应确保完成TKEC-F-05-105 项目安装After signing the commissi ningtract and before commencement of the project, thebranch should inish signing the which shall satisfy with following requirements:4.2.3

25、.1 TKEC-F-05-105 项目安装委 协议相对方应接受 TKEC 对其 个安装过程进行的安全指导和。tract partner of the should accept TKECs safety gui ance and monitor during the wholeinstallati n pros.4.2.3.2 TKEC-F-05-105目安装委 协议相 方应确保设备接受 T EC 按照安全技术规范的要求进行的校验和调试。tract partner of Installation should executed by TKEC specifica ions.4.2.3.3 TK

26、EC-F-05-105TKEC-F- 5-105signmentgreement for Projectaccept thadjustment and co mising which areaccording to the requirementsof safety technical目安装委托协议相对方须确保只有在通TKEC 按动扶梯和盖章确认可申报政TKEC-F-11-005 电梯安装质自动人行道安装质量检查表检查表 /或TKEC-F-11-006量检验合格并获得 TKEC 出具签部门验收 必备的其它文件),的调试后(含 合当地政府部门验收。tract partner of could r

27、eport to the5-105signmentgreement for Projecternment for inspecti n only after the projecthas passed TKECs quality inspection refer to and/or and een ied wico mising。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.第安装管理政策

28、Third-Party Installationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page7 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)report signed and chopped bTKEC (including otherst arenesary for passing inspection of localernment).4.2.3.4 TKEC-F-05-105 项目安装委协议相 方须在政 部门验收 格且取得

29、电梯监督检验工作日内向 TKEC Once the projecInspection Report或自供相关合s passed the扶梯与自动人行道监督检验后,5 个证和的复印件,并加盖其公章。ernments inspection and or have been acquired, thetract partner of should provide opies of relevant qualification certificates and reports applied with its company chop to TK C within 5 orkdays.激励、违约责任和

30、赔偿 Rewarding, default responsibility and compensation4.3.1 激励 Rewarding如某一第安装项目符合下述条 时,则在 地区下一项目减免相 累计调试合同金额:4.3If a third-party installation corresponding accumulatewill be deducte :project appropriates the below-mentionedditions, thecommissioning amounthe next project of this branch产品安全一次通过非安装原 的不

31、计)Pass all product afety items at现场管理评分 0Site management and performan无事故和违约inspection (non-istallation factor is not included)core60No safety accide t and violation record无经销商引起的No customer co pliant caused bytract partner未因经销商原因对 TKEC 造成损失No loss incurred o TKEC due totract partner。打印件仅用于临时使用。疑问,

32、请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.梯种Typeandover Quality Score*85 移交质量分数85Handover Quality Score*85 (Pass all items of quality inspection attime)移交质量分数85(首检通过质量检查)Handover Quality core* ELE90 ESC95 (Pass all items ofquality

33、 inspection at first time)移交质量分数电梯9扶梯95(首检一次性通过质量检查)第安装管理政策Third-Party Installationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page8 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)4.3.2 违约责任和赔偿 Default responsibility and compensation安装项目按 TKEC 发布之和/如某一第或TKEC-F-11-006

34、 自动扶梯与自动人行道安装质量检查表检查,其 果如以下条件时,将从其安全质量保证金中抵偿相应金 。According to and/orreleased by TKEC, if the inspection result of a t ird-party installation p ojecttasisfollows, then dduct the corresponding amount of itsafety and quality deposit.。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary

35、us only. Please refer to the on-line document If in doubt.梯种 Ty e类别 Category违Penalty amountELES 项(首检不合格)S Item (Fail to pass at theinspection)RM 300/per item一类项(首检不 格)Class Item ( ail to pass at the inspection)RM 200/per itemESC/MW一类项(首检不 格)Class Item ( ail to pass at the inspection)RM 200/per itemE

36、LES 项(第二次检验不合格)S Item (Fail to pass at the second inspection)RM 600/per item一类项(第二次 验不合格)Class Item ( ail to pass at the sed inspection)RM 400/per itemESC/MW一类项(第二次 验不合格)Class Item ( ail to pass at the sed inspection)RM 400/per item首次检S 项如果有 5 项没有通过,违会直接上升至 3,000 元/每台If there are 5 items of S item f

37、ailed at theinspection, the penalty will directly rise to RMB 3,000/unit.ELE电梯RMB 0/unit0 元/台RMB 500/u it500 元/台RMB 1,000/u it1,000 元/台ESC扶梯RMB 0/unit0 元/台RMB 0/uni0 元/台RMB 1,000/u it1,000 元/台第安装管理政策Third-Party Installationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04

38、.01页码Page9 / 12ThyssenKrupp Elevator (Chi a)克虏伯电梯(中国)4.3.3 第安装项目安全 质量保 金结算及返还均按 本政策执行并使用TKEC-F-05-107 第安装安全及质量保证金结算表进行结算。For each third-party inst llation proj ct, the safety and quality deit shall becalculated anreturnedfollowing the requir ment ofthe policy by using.4.4原则上不允许申报第principle安装的项目 Proj

39、 cts not allowed for third-party installation in凡具备以下任一 点的项目,原则上不可采用第三方安装的模式:Projectt meets any of the following features shouldnt apply for the third-partyinstallation in principle:基础设施项目(地铁、火车站、机场等主体工 );Infrastructural projects (metro lines, railway stations, airports and structions);包含速度大于或等于 5 米

40、/秒电梯的 速梯项目;ther mainHigh-rise elevator projects involving ele ators with speed of 5m/sreatern 5m/s;4.4.3 包含Project未自行执行过安装的新产品的项目;tain new producs not b en installed separay by branch before;4.4.4 有对 TKEC 市场产生影响的第三方安装项目历史的经销商申报的项目。The project app d by thetract partner whose third-party installation

41、projecsnegatively influ nced the TKEC market.4.5第安装项目年度台量及批准 Forecast and approval of annuaitty ofthe third-party installation project4.5.1伯电梯中国区 营下属各每财年初,售计划,应根据本区域市情况及销RVP/RGM安装项目 划总台量,经 BGM本本财年第批准后,经中国区总部安装部复核并备案。At the beginning of each n w fiscal year, each branch of ThyssenKrupp Elevator China

42、Field should make the bra chs planned annuatty of third-party installationprojects accord ng to the regions market situation and then get BGMs and RVP/RGMsapprovals, Head Office Installation De artment of TKE China Field will further review and put it on record.4.5.2如在实际执行过程中,分公司提交的第安 项目累计台量预计将 过或已超

43、过被批准的年度台量必须更新当财年的第安装项目计划总台量,。打印件仅用于临时使用。疑问, 请以网上文件为准。ernal use only. The pr -out is for temporary us only. Please refer to the on-line document If in doubt.第安装管理政策Third-Party Installationroject Management PolicyTKEC-R-05-03版本 Version: A生效日期 Effective Date: 2014.04.01页码Page10 / 12ThyssenKrupp Elevato

44、r (Chi a)克虏伯电梯(中国)并重新执行 4.5.1 条款的装具体项目才可以被批准。流程。只有在已 准年度预 台量之内第安During execution, if a branchal accumulative unitty ofthird-party s forecastthe branchinstallation projects is going to exceed or has already exceeded the brancannuait quantity of thi d-party installation projects of the fiscal year,sho

45、uld update the fiscal years forecast totaitty, and should re-execute theapproval process specified in Clause 4.5.1. Only the third-party installation projectswhich are cove ed如果跨区执行第he fiscal years fo ecast annuaitty could be approved.年度计划台量。安装项目,由销售负责If a third-party installation project is a cross-branch one, the selling branch should takethe responsibility to count the

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论